{"id":793354,"date":"2025-05-11T07:10:13","date_gmt":"2025-05-11T04:10:13","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=793354"},"modified":"2025-05-11T07:10:13","modified_gmt":"2025-05-11T04:10:13","slug":"lista-minciunilor-electorale-ale-lui-nicusor-dan-incorect-politic","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=793354","title":{"rendered":"Lista minciunilor electorale ale lui Nicusor Dan &#8211; Incorect Politic"},"content":{"rendered":"<article class=\"post-listing post-79283 post type-post status-publish format-standard has-post-thumbnail  category-actualitate category-stirea-zilei tag-lista-minciunilor-electorale-ale-lui-nicusor-dan\" id=\"the-post\">\n<div class=\"post-inner\">\n<h1 class=\"name post-title entry-title\"><span>Lista minciunilor electorale ale lui Nicusor Dan<\/span><\/h1>\n<div class=\"entry\">\n<p><strong>Incorect Politic<\/strong><br \/>\nMai 11, 2025<\/p>\n<p><a href=\"https:\/\/www.incorectpolitic.com\/?attachment_id=79290\" rel=\"attachment wp-att-79290\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-79290 size-full\" src=\"https:\/\/analyse.optim.biz\/wp-content\/uploads\/2025\/12\/mucusor-1.jpg\" alt=\"Lista minciunilor electorale ale lui Nicusor Dan\" width=\"516\" height=\"804\" title=\"mucusor-1\"><\/a><\/p>\n<h2><strong>Lista minciunilor electorale ale lui Nicusor Dan<\/strong><\/h2>\n<p><em>Via <a href=\"https:\/\/www.facebook.com\/dana.budeanu.79\/posts\/3518722051613558?ref=embed_post\">Dana Budeanu<\/a>:<\/em><\/p>\n<p>\u00a0<\/p>\n<p>BUNA DIMINEATA, CELOR CARE DUPA CE AU VOTAT CU IOHANNIS DE DOUA ORI, L AU INJURAT FRUMOS LA FINAL (HAOLEU CE PROSTI AM FOST) SI ACUM, TOT PE NOBILISM BALCANIC, VOTEAZA INCOLONATI CU FI SU (HAOLEU CE PROSTI AM RAMAS). IATA LISTA MINCIUNILOR DATA LA ROSTOGOLIT D\u00c3 SISTEMU CARE VA VREA \u2018DESTEPTI\u2019 SI \u2018LIBERI\u2019:<\/p>\n<p>1. Renovarea intrarea principal\u0103 a Gr\u0103dinii Zoologice B\u0103neasa.<\/p>\n<p>Fals. Nu exist\u0103 un asemenea proiect \u00een mandatul ND<\/p>\n<p>2. \u00cenlocuirea a peste 180 km de conducte de termoficare<\/p>\n<p>\u2013 FARA CELE 300 MILIOANE DE EURO NU SE PUTEA INLOCUI NIMIC, NU EXISTA NICI UN LEU PENTRU FINANTARE<\/p>\n<p>\u2013 la o lun\u0103 dup\u0103 preluarea mandarului, ND a semnat contractul pe fonduri europene care a fost \u021binut la sertar peste 6 luni de premierul Orban, pentru a fi o mare realizare a lui ND. Dup\u0103 munca de 3 ani a echipei Firea.<\/p>\n<p>Lucr\u0103rile au \u00eenceput cu 2 ani \u00eent\u00e2rziere \u0219i pentru c\u0103 nu a fost finalizat\u0103 prima etap\u0103 la timp, potrivit contractul, proiectul a fost fazat, adic\u0103 a fost par\u021bial pierdut\u0103 finan\u021barea european\u0103.<\/p>\n<p>\u00cen total, pe re\u021bele secundare \u0219i primare, \u00een mandatul Firea s-au reabilitat 305 km de conducte de termoficare, cu Radet \u00een faliment 2 ani.<\/p>\n<p>\u00cen mandatul ND, cu proiectul mo\u0219tenit de la echipa Firea, s-au reabilitat aproximativ 260 km.<\/p>\n<p>3. Scoaterea Prim\u0103riei Capitalei din faliment.<\/p>\n<p>Minciuna cu datoriile publice mo\u0219tenite<\/p>\n<p>Primarul general continu\u0103 \u0219i dup\u0103 cinci ani de mandat s\u0103 dea vina pe \u201egreaua mo\u0219tenire\u201d pentru nerealiz\u0103rile sale.<\/p>\n<p>\u2013 Dup\u0103 cinci ani de mandat, Prim\u0103ria Capitalei are datorii mai mari dec\u00e2t se pl\u00e2nge constant primarul general c\u0103 a mo\u0219tenit. Cifrele sunt publice.<\/p>\n<p>\u2013 La finalul anului trecut, erau peste 6 miliarde de lei datorii. Sunt datorii enorme la termoficare, peste 1 miliard de lei, sau la transportul public. Nu mai vorbesc de facturile curente la spitale sau str\u0103zi. Banii stau \u00een conturi \u0219i nu sunt folosi\u021bi, ca \u0219i cum i-ar \u021bine la saltea pentru alte scopuri.<\/p>\n<p>\u2013 \u00cen to\u021bi ace\u0219ti ani, Prim\u0103ria Capitalei a primit bani suficien\u021bi de la Guvern. Coali\u021bia social-democrat\u0103 \u0219i liberal\u0103 nu a blocat Bucure\u0219tiul \u0219i a dat lunar sume duble fa\u021b\u0103 de mandatul Firea. \u00centr-un an bun, \u00een perioada 2016 \u2013 2020, intrat \u00een conturile PMB circa 3,5 miliarde de lei. \u00cen mandatul actualului primar, s-au \u00eencasat \u0219i 7 miliarde de lei.<\/p>\n<p>\u2013 \u00cen plus, sunt mul\u021bi bani \u00eemprumuta\u021bi din b\u0103nci \u00een ace\u0219ti ani. Peste 3,5 miliarde de lei, din informa\u021biile publice. O parte din bani stau \u00een conturi, nefolosi\u021bi, dar dob\u00e2nda curge lun\u0103 de lun\u0103.<\/p>\n<p>4. Achizi\u021bionarea a 100 de tramvaie noi \u2013<\/p>\n<p>PROCEDURA FINALIZATA, CONTRACTUL A STAT LA BOLOS IN SERTAR CA SA IL SEMNEZE NICUSOR<\/p>\n<p>\u2013 Achizi\u021bia celor 100 de tramvaie este anchetat\u0103 de Parchetul European, dup\u0103 ce ar fi suspiciuni de modific\u0103ri ale pieselor fa\u021b\u0103 de specifica\u021biile din caietul de sarcini. \u00cen plus, Nicu\u0219or Dan a suplimenarea ilegal\u0103 a costurilor acestui contract, dup\u0103 ce a semnat contractul imediat dup\u0103 preluarea mandatului, contract care era deja semnat de primarul general Firea.<\/p>\n<p>5. Achizi\u021bionarea a 100 de autobuze electrice.<\/p>\n<p>Fonduri europene nerambursabile ob\u021binute de adminstra\u021bia Firea \u0219i procedur\u0103 de licita\u021bie \u00eenceput\u0103 \u00een mandatul 2016-2020<\/p>\n<p>6. Achizi\u021bionarea a 100 de troleibuze.<\/p>\n<p>Fonduri europene nerambursabile ob\u021binute de adminstra\u021bia Firea \u0219i procedur\u0103 de licita\u021bie \u00eenceput\u0103 \u00een mandatul 2016-2020<\/p>\n<p>7. Reabilitarea a 50 km de linii de tramvai.<\/p>\n<p>Fals. Nu exist\u0103 un asemenea proiect implementat \u00een mandatul ND.<\/p>\n<p>8. Extinderea re\u021belei de tramvai cu 15 km.<\/p>\n<p>Fals. Nu exist\u0103 un asemenea proiect implementat \u00een mandatul ND.<\/p>\n<p>9. Finalizarea sta\u021biei de epurare Glina.<\/p>\n<p>Proiectul sta\u021biei pentru apele uzate din Capital\u0103 a fost oprit \u00een 1989, dup\u0103 care a redevenit o prioritate \u00een 2002 \u00een dialogul dintre Ministerul Mediului \u0219i Comisia European\u0103. 9 ani mai t\u00e2rziu, \u00een 2011, a fost finalizat\u0103 prima etap\u0103. Apoi, nu s-au mai f\u0103cut progrese.<\/p>\n<p>\u00cen 2016 a fost deblocat proiectul, dup\u0103 ce fusese contestat \u00een instan\u021b\u0103 4 ani de zile. Firea a semnat contractul de lucr\u0103ri pentru modernizarea sta\u021biei de epurare \u0219i a atribuit contractul de lucr\u0103ri prin licita\u021bie public\u0103 restr\u00e2ns\u0103.<\/p>\n<p>Lucr\u0103rile efective au \u00eenceput la finalul lunii ianuarie 2019 \u0219i s-au desf\u0103\u0219urat f\u0103r\u0103 \u00eentreruperea activit\u0103\u021bii sta\u021biei de epurare, operat\u0103 de Apa Nova Bucure\u0219ti, care a asigurat sprijin pe tot parcursul proiectului. Nu s-a f\u0103cut pauz\u0103 nici pe perioada st\u0103rii de urgen\u021b\u0103, \u00een timpul pandemiei Covid-19. \u00cen iunie 2020, incineratorul de n\u0103mol era gata \u00een propor\u0163ie de aproape 85%, iar progresul fizic pentru \u00eentregul proiect era de 40%.<\/p>\n<p>10. Finalizarea Podului Doamna Ghica.<\/p>\n<p>Pasajul Doamna Ghica \u2013 \u00eenceput de la zero de echipa Firea \u0219i l\u0103sat la peste 70% stadiu se realizare. A fost finalizat cu 2 \u00eent\u00e2rziere de ND.<\/p>\n<p>11. Reabilitarea Podului Grant.<\/p>\n<p>Consolidare Podul Grant \u2013 \u00eenceput\u0103 de administra\u021bia Firea, prima etap\u0103 finalizat\u0103 \u00een c\u00e2teva luni, calea de rulare a tramvaiului schimbat\u0103. ND a preluat doar etapa 2 \u0219i a \u00eenceput lucr\u0103rile cu \u00eent\u00e2rziere.<\/p>\n<p>12. Expertizarea a 28 de poduri \u0219i pasaje.<\/p>\n<p>Prima expertizare serioas\u0103 a podurilor \u0219i pasajelor din Bucure\u0219ti a fost realizat\u0103 \u00een 2018, \u00een mandatul Firea. \u00cen urma expertizei, au fost realibitate podul Straule\u0219ti \u0219i Mihai Bravu, se lucra podul Grant \u0219i urmau s\u0103 \u00eenceap\u0103 lucr\u0103rile la podul Fundeni.<\/p>\n<p>13. Modernizarea a 20 de locuri de joac\u0103 \u0219i sport.<\/p>\n<p>Locurile de joac\u0103 din parcul Her\u0103str\u0103u sunt un pericol public, \u00eenchise definitiv de ANPC. Doar \u00een parcul Ci\u0219migiu au fost reabilitate \u0219i sunt din nou stricate \u0219i murdare.<\/p>\n<p>14. Asigurarea documenta\u021biei pentru finan\u021barea a 30 de locuri de joac\u0103.<\/p>\n<p>Fals. Nu exist\u0103 un asemenea proiect implementat \u00een mandatul ND.<\/p>\n<p>15. Refacerea spa\u021biilor verzi din Parcul Ci\u0219migiu.<\/p>\n<p>Nu exist\u0103 un asemenea proiect implementat total \u00een mandatul ND.<\/p>\n<p>16. Reasfaltarea a 40.000 mp de alei \u00een Parcul Tineretului.<\/p>\n<p>17. Repararea sistemelor de iriga\u021bii \u00een Parcul Ci\u0219migiu.<\/p>\n<p>18. Repararea sistemelor de iriga\u021bii \u00een Parcul Tineretului.<\/p>\n<p>19. Repararea sistemelor de iriga\u021bii \u00een Parcul Her\u0103str\u0103u.<\/p>\n<p>20. Repararea sistemelor de iriga\u021bii \u00een Parcul Izvor.<\/p>\n<p>21. Repararea sistemelor de iriga\u021bii \u00een Parcul Circului.<\/p>\n<p>22. Repararea sistemelor de iriga\u021bii \u00een Gr\u0103dina Zoologic\u0103.<\/p>\n<p>23. Repararea sistemelor de iriga\u021bii \u00een Parcul Carol.<\/p>\n<p>24. Repararea sistemelor de iriga\u021bii \u00een Parcul Sebastian.<\/p>\n<p>25. Repararea sistemelor de iriga\u021bii \u00een Parcul Drumul Taberei.<\/p>\n<p>26. Repararea sistemelor de iriga\u021bii \u00een Parcul Cr\u00e2nga\u0219i.<\/p>\n<p>27. Repararea sistemelor de iriga\u021bii \u00een Parcul IOR.<\/p>\n<p>28. Repararea sistemelor de iriga\u021bii \u00een Parcul Titan.<\/p>\n<p>29. Repararea sistemelor de iriga\u021bii \u00een Parcul Moghioro\u0219.<\/p>\n<p>30. Repararea sistemelor de iriga\u021bii \u00een Parcul Tei.<\/p>\n<p>31. Renovarea sec\u021biilor de chirurgie \u0219i urologie ale Spitalului Colentina.<\/p>\n<p>Lucr\u0103ri \u00eencepute \u0219i finalizate \u00een mandatul Firea. Renovarea \u0219i modernizarea spitalelor vechi Colentina, Cantacuzino, Burghele etc.<\/p>\n<p>32. Demararea construc\u021biei Ambulatoriului Victor Babe\u0219.<\/p>\n<p>AMBULATORIUL A INCEPUT DIN 2019, IN ANII ANTERIORI S-A FACUT DOCUMENTATIA NECESARA, PROIECTAREA, IAR IN AUGUST 2019 DEJA SE LUCRA FIZIC!!! DAR A VENIT PANDEMIA! DECI NICUSOR NU A DEMARAT NIMIC !!!!<\/p>\n<p>aug. 11, 2019 https:\/\/www.medicalmanager.ro\/gabriela-firea-anunta-ca\u2026\/<\/p>\n<p>Lucr\u0103rile nu sunt finalizate!!!<\/p>\n<p>33. Deschiderea \u0219antierului pentru Banca de \u021aesuturi.<\/p>\n<p>Pbiectiv blocat de Nicusor Dan, nu se mai lucreaza.<\/p>\n<p>34. Finalizarea lucr\u0103rilor la Spitalul Foi\u0219or.<\/p>\n<p>Lucr\u0103rile la Spitalul Foi\u0219or au fost deblocate \u00een mandatul Firea, corpul principal al spitalului a fost inaugurat \u00een 2017-2018, se lucra la ultima etap\u0103, la parcarea subteran\u0103 \u0219i modernizarea corpului vechi al spitalului. ND nu a recep\u021bionat lucr\u0103rile.<\/p>\n<p>35. Construc\u021bia unui corp nou de terapie intensiv\u0103 pentru neonatologie la Spitalul Filantropia. (nu exista)<\/p>\n<p>Nu exist\u0103 acest corp de cl\u0103dire.<\/p>\n<p>36. Consolidarea unei p\u0103r\u021bi din Maternitatea Bucur.( nu exista)<\/p>\n<p>Nu s-a consolidat maternitatea!<\/p>\n<p>37. Refacerea sistemelor electrice, detec\u021bie incendii \u0219i sisteme de fluide \u00een mai multe spitale<\/p>\n<p>Nu exista\u2026sa arate autorizatiile de securitate obtinute<\/p>\n<p>38. Construc\u021bia unor corpuri de cl\u0103dire cu func\u021biune de ambulatoriu la mai multe spitale????<\/p>\n<p>MINCIUNA! SINGURUL AMBULATORIU ESTE CEL CONSTRUIT SI INAUGURAT IN 2017, LA Spitalul de Copii GOMOIU<\/p>\n<p>https:\/\/hotnews.ro\/fotogalerie-primarul-gabriela-firea-a\u2026<\/p>\n<p>39. Alocarea a 20 de milioane de lei pentru dezvoltarea programului de sport \u00een \u0219coli \u2013<\/p>\n<p>Minciun\u0103! Singurul program pentru sport de mas\u0103 pe care-l derula PMB prin Compania Municipal\u0103 Sport pentru To\u021bi a fost blocat \u00een momentul intr\u0103rii \u00een faliment a companiei. Terenurile de sport de\u021binute de companie sunt \u0219i ast\u0103zi \u00een paragin\u0103, l\u00e2ng\u0103 Arena Na\u021bional\u0103 \u0219i Spitalul Malaxa \u2013 baza Ion Sahigian<\/p>\n<p>40. Implementarea unui program de educa\u021bie la s\u0103n\u0103tate \u0219i prevenirea consumului de droguri \u00een \u0219coli. CARE???????SA ARATE UN COPIL CARE A FOST INFORMAT IN SCOLI<\/p>\n<p>PMB nu deruleaz\u0103 niciun program de informare \u0219i con\u0219tientizare asupra riscului drogurilor \u00een \u0219coli. La propunerea PSD, a fost inclus\u0103 o \u00eentrebare la referendum pentru a permite \u0219i obliga PMB s\u0103 se implice \u00een subiectul drogurilor. Chiar am propus \u00eenfiin\u021barea unei direc\u021bii speciale la Centrul de Tineret.<\/p>\n<p>42. E\u0219alonarea datoriilor c\u0103tre Unicredit pentru autobuzele Otokar.<\/p>\n<p>Fals. Nu erau datorii, ci facturi curente care trebuiau achitate<\/p>\n<p>43. Economisirea a 150 milioane lei anual prin \u00eenchiderea a 14 companii municipale.<\/p>\n<p>Minciun\u0103! Companiile Municipale aveau mai pu\u021bini angaja\u021bi de c\u00e2t s-a spus public, niciuna nu este \u00eenc\u0103 \u00eenchis\u0103 definitiv, jum\u0103tate func\u021bioneaz\u0103, iar celelalte sunt \u00een procedur\u0103 de insolven\u021b\u0103 \u0219i faliment, se pl\u0103tesc lunar sume mari c\u0103tre administratorii judiciari, speciali etc.<\/p>\n<p>44. Deblocarea conturilor de trezorerie ale Prim\u0103riei.<\/p>\n<p>Prim\u0103ria Capitalei nu avea conturile blocate la momentul prelu\u0103rii mandatului de c\u0103tre ND.<\/p>\n<p>45. Atragerea a 2 miliarde de lei din fonduri europene.<\/p>\n<p>Administra\u021bia Firea a atras fonduri europene \u00een valoare de 1 miliard de euro, \u00een special pe POIM. Nicu\u0219or Dan nu are executie bugetara pe fonduri europene nerambursabile, asta \u00eenseamn\u0103 c\u0103 nu au fost atrase fonduri noi.<\/p>\n<p>46. Preg\u0103tirea proiectelor pentru exerci\u021biul financiar 2021-2027.<\/p>\n<p>Nu exist\u0103 astfel de proiecte.<\/p>\n<p>47. Achizi\u021bionarea a 100 de autobuze electrice noi pentru Bucure\u0219ti.<\/p>\n<p>ESTE SCRIS SI LA PUNCTUL 5, LE NUMARA CA STEAGURILE LUI PRISTANDA???????????<\/p>\n<p>48. Instalarea a peste 200 de ad\u0103posturi moderne \u00een sta\u021biile de transport public. \u2013<\/p>\n<p>ERAU ACHIZITIONATE DE Administra\u021bia Firea SI INCEPUSERA MONTAREA, la finalul mandatului erau deja cam 2000 montate.<\/p>\n<p>https:\/\/hotnews.ro\/primaria-capitalei-vrea-sa-cumpere\u2026<\/p>\n<p>49. Implementarea monitoriz\u0103rii GPS pentru toate mijloacele de transport \u00een comun.<\/p>\n<p>Procedur\u0103 \u00eenceput\u0103 \u00een mandarul Firea, prin lansarea aplica\u021biei STB.<\/p>\n<p>50. Extinderea re\u021belei de semafoare inteligente pe marile bulevarde.<\/p>\n<p>Nu au fost introduse \u00een sistemul BTMS intersec\u021bii noi de pe marile bulevarde pentru c\u0103 acestea erau deja majoritatea \u00een sistem din mandatul Firea.<\/p>\n<p>51. Introducerea sistemului de management al traficului pe arterele principale.( zero\u2026ultimele facute de firea)<\/p>\n<p>52. Extinderea re\u021belei de camere de supraveghere pentru siguran\u021ba public\u0103.<\/p>\n<p>PMB nu are atribu\u021bii, singurele camere de supraveghere din ora\u0219 sunt ale poli\u021biilor locale de sector \u0219i ale altor institu\u021bii cu atribu\u021bii \u00een siguran\u021b\u0103 public\u0103.<\/p>\n<p>53. Refacerea iluminatului public pe marile bulevarde.<\/p>\n<p>Proiect \u00eenceput \u00een mandatul Firea, prin Compania Municipal\u0103 Iluminat Public.<\/p>\n<p>54. \u00cencerea lucr\u0103rilor de reabilitare la bulevardul Theodor Pallady.<\/p>\n<p>Minciun\u0103. Lucr\u0103rile sunt realizate de Prim\u0103ria Sectorului 3.<\/p>\n<p>55. Redeschiderea circula\u021biei pe Podul Grant dup\u0103 repara\u021bii majore.<\/p>\n<p>Proiect demarat \u00een mandatul Firea, continuat cu \u00eent\u00e2rziere \u00een mandatul ND.<\/p>\n<p>56. Modernizarea trotuarelor din zona Unirii.<\/p>\n<p>Trotuarele din zona Unirii au fost modernizare de PS3 \u0219i este de notorietate scandalul dintre ND \u0219i Primarul Negoi\u021b\u0103 pentru palmierii de la Unirii.<\/p>\n<p>57. Demararea programului de plant\u0103ri masive de arbori pe marile artere<\/p>\n<p>Au fost planta\u021bi doar c\u00e2\u021biva copaci \u00een alveolele de pe bd Regina Elisabeta, \u00een fa\u021ba PMB.<\/p>\n<p>58. Crearea unui nou parc \u00een zona Ghencea.<\/p>\n<p>Nu exist\u0103!<\/p>\n<p>59. Reamenajarea lacului din Parcul Circului.<\/p>\n<p>Nu exist\u0103 asemenea proiect.<\/p>\n<p>60. Modernizarea iluminatului ornamental de pe Calea Victoriei.<\/p>\n<p>Nu exist\u0103!<\/p>\n<p>61. Implementarea platformei online pentru transparen\u021ba autoriza\u021biilor de construc\u021bie.<\/p>\n<p>Fals!<\/p>\n<p>62. Digitalizarea arhivei urbanismului PMB.<\/p>\n<p>Fals!<\/p>\n<p>63. Organizarea de licita\u021bii transparente pentru toate proiectele mari de infrastructur\u0103.<\/p>\n<p>Nu au fost realizate licita\u021bii pentru proiectele de mare infrastructur\u0103!<\/p>\n<p>64. Semnarea contractului pentru modernizarea re\u021belei de termoficare pe \u00eenc\u0103 150 km.<\/p>\n<p>65. Ob\u021binerea autoriza\u021biilor pentru \u00eenceperea lucr\u0103rilor la Prelungirea Ghencea.<\/p>\n<p>Lucr\u0103rile la Prelungirea Ghencea, deci \u0219i autoriza\u021biile necesare dateaz\u0103 de atunci, au fost \u00eencepute \u00een mandatul Firea. Lucr\u0103rile nu sunt finalizate nici acum, dup\u0103 4 ani de mandat ND.<\/p>\n<p>66. Finalizarea studiilor de fezabilitate pentru extinderea liniei 41<\/p>\n<p>Nu exist\u0103 un asemenea proiect distinct, el face parte din proiectul Prelungirea Ghencea, realizat \u00een mandatul Firea.<\/p>\n<p>67. Lansarea proiectului pentru reabilitarea Pie\u021bei Matache<\/p>\n<p>Proiect al PS1, nu al PMB<\/p>\n<p>68. Extinderea sistemului de alarmare pentru cutremure \u00een \u0219colile din Bucure\u0219ti.<\/p>\n<p>Nu exist\u0103!<\/p>\n<p>69. Modernizarea a 12 gr\u0103dini\u021be administrate de PMB.<\/p>\n<p>PMB nu de\u021bine gr\u0103dini\u021be, ci doar cre\u0219e sociale \u00eenfiin\u021bate \u00een mandatul Firea.<\/p>\n<p>70. Instalarea a 50 de noi f\u00e2nt\u00e2ni de ap\u0103 potabil\u0103 \u00een parcuri.<\/p>\n<p>Proiect mo\u0219tenit de la administra\u021bia Firea, realizat de companiile municipale Dezvoltare Durabil\u0103 \u0219i Trustul de Cl\u0103diri Metropolitane. \u00cent\u00e2rziat de ND.<\/p>\n<p>71. Renovarea Teatrului Excelsior.<\/p>\n<p>Nu exist\u0103!<\/p>\n<p>72. Finalizarea lucr\u0103rilor de repara\u021bie la Sala Gloria<\/p>\n<p>Proprietatea PS3, lucr\u0103rile realizate de PS3<\/p>\n<p>73. Modernizarea sistemului de sonorizare la Opera Comic\u0103 pentru Copii.<\/p>\n<p>Nu \u00een mandatul ND!<\/p>\n<p>74. Introducerea iluminatului LED pe marile bulevarde<\/p>\n<p>Modernizarea re\u021belei de iluminat public a \u00eenceput \u00een mandatul Firea.<\/p>\n<p>75. Reabilitarea sistemului de canalizare \u00een zona Pia\u021ba Victoriei.<\/p>\n<p>76. Achizi\u021bionarea de utilaje moderne pentru desz\u0103pezire pentru iernile viitoare<\/p>\n<p>PMB nu realizeaz\u0103 desz\u0103pezire, nu are contracte pentru a\u0219a ceva. Doar prim\u0103riile de sector se ocup\u0103, iar operatorii sunt priva\u021bi<\/p>\n<p>77. Modernizarea a 5 pasaje pietonale subterane<\/p>\n<p>Nu a fost modernizat niciun pasaj subteran, ci doar expertizate \u0219i \u00eencadrate \u00een clase de risc seismic.<\/p>\n<p>78. Lansarea aplica\u021biei de mobil PMB pentru sesiz\u0103ri cet\u0103\u021bene\u0219ti.<\/p>\n<p>Mandatul Firea<\/p>\n<p>79. Lansarea programului de reabilitare pentru monumente istorice din patrimoniul municipal.( zero)<\/p>\n<p>Nu a fost consolidat\u0103 nicio cl\u0103dire pericol public. Nu a fost restaurat\u0103 nicio fa\u021bad\u0103 monument istoric din centru. Nu a fost achizi\u021bionat\u0103 nicio cl\u0103dire monument istoric<\/p>\n<p>80. Finalizarea repara\u021biilor urgente la Arcul de Triumf<\/p>\n<p>Lucr\u0103ri finalizate \u00een mandatul Firea, iar parada de Ziua Na\u021bional\u0103 a fost reluat\u0103 la Arcul de Triumf \u00een anul 2016.<\/p>\n<p>81. Restaurarea complet\u0103 a Foi\u0219orului de Foc.<\/p>\n<p>Nu are atribu\u021bii PMB sunt lucr\u0103ri realizate de MAI, prin IGSU, acolo fiind muzeul Pompierilor.<\/p>\n<p>82. Modernizarea instala\u021biilor sanitare \u00een 20 de \u0219coli.<\/p>\n<p>Prim\u0103riile de sector se ocup\u0103 de administrarea cl\u0103dirilor \u00een care func\u021bioneaz\u0103 institu\u021biile de \u00eenv\u0103\u021b\u0103m\u00e2nt.<\/p>\n<p>83. Asfaltarea complet\u0103 a \u0218oselei Virtu\u021bii.<\/p>\n<p>Prim\u0103ria S6, nu ND!<\/p>\n<p>84. Implementarea unui sistem de avertizare meteo \u00een timp real.<\/p>\n<p>Nu exist\u0103!<\/p>\n<p>85. Crearea unui departament specializat \u00een atragerea fondurilor europene.<\/p>\n<p>Direc\u021bia realizat\u0103 \u00een mandatul Oprescu-Firea.<\/p>\n<p>86. Finalizarea pasajului Olteni\u021bei\u2013Pope\u0219ti Leordeni.<\/p>\n<p>Pasaj realizat de Ministerul Transporturilor, prin CNAIR, nu de PMB.<\/p>\n<p>87. Semnarea acordurilor pentru podul peste Lacul Morii.<\/p>\n<p>Semnarea a avut loc \u00een mandatul Firea.<\/p>\n<p>88. Modernizarea intersec\u021biei \u0218oseaua Mihai Bravu \u2013 Vatra Luminoas\u0103<\/p>\n<p>Lucr\u0103ri realizate de PS2, nu de PMB.<\/p>\n<p>89. Reabilitarea re\u021belei de ap\u0103 din zona Cotroceni<\/p>\n<p>Lucr\u0103ri realizate \u00een mandatul Firea.<\/p>\n<p>90. Extinderea spa\u021biilor de parcare de re\u0219edin\u021b\u0103 \u00een zonele centrale.<\/p>\n<p>Nu au fost create locuri de parcare de re\u0219edin\u021b\u0103 noi, ci doar locuri de parcare cu plat\u0103, iar locuitorii din zonele centrale sunt nevoi\u021bi s\u0103 pl\u0103teasc\u0103 abonamente costisitoare. Parc\u0103ri de re\u0219edin\u021b\u0103 realizeaz\u0103 doar prim\u0103riile de sector.<\/p>\n<p>91. Lansarea unei platforme online pentru plata parc\u0103rilor.<\/p>\n<p>Din mandatul Firea se poate pl\u0103ti online parcarea public\u0103.<\/p>\n<p>92. Deschiderea unei noi linii de autobuz electric c\u0103tre Aeroportul Otopeni<\/p>\n<p>Linia de autobuz c\u0103tre aeroport exist\u0103 de peste 10 ani. Era linia 783 de la Unirii \u0219i 780 de la Gara de Nord. Acum sunt liniile 100 \u0219i 101.<\/p>\n<p>93. Modernizarea re\u021belei de iluminat din zona Palatului Parlamentului.<\/p>\n<p>94. Refacerea trotuarelor \u00een zona Parcului Carol.<\/p>\n<p>PS4<\/p>\n<p>95. Instalarea a 200 de b\u0103nci inteligente \u00een ora\u0219.<\/p>\n<p>Nu exist\u0103!<\/p>\n<p>96. Realizarea unei h\u0103r\u021bi digitale a spa\u021biilor verzi.<\/p>\n<p>Nu exista , a luat amenzi de la garda de mediu an de an pentru c\u0103 nu existp hart\u0103 \u0219i registru.<\/p>\n<p>97. Crearea unui nou parc urban \u00een zona Rahova<\/p>\n<p>Nu exist\u0103!<\/p>\n<p>98. Extinderea iluminatului festiv \u0219i arhitectural pe marile bulevarde.<\/p>\n<p>Prim\u0103riile de sector<\/p>\n<p>99. Plantarea a peste 15.000 de arbori noi \u00een patru ani<\/p>\n<p>Prim\u0103riile de sector<\/p>\n<p>100. Amenajarea unui nou centru comunitar \u00een cartierul Ferentari.<\/p>\n<p>Nu exist\u0103!<\/p>\n<p>101. Implementarea unui program de reciclare inteligent\u0103 \u00een parcuri.<\/p>\n<p>Marile parcuri administrate de PMB sunt abandonate.<\/p>\n<p>102. Instalarea unui sistem de drenaj modern \u00een Parcul Tineretului<\/p>\n<p>Realizat \u00een mandatul Firea<\/p>\n<p>103. \u00cenlocuirea tuturor semafoarelor vechi cu modele LED.<\/p>\n<p>Nu exist\u0103!<\/p>\n<p>104. Implementarea unui sistem de supraveghere video \u00een toate marile parcuri.<\/p>\n<p>NU exist\u0103!<\/p>\n<p>105. Extinderea re\u021belei de piste de biciclete.<\/p>\n<p>Proiectul \u00eenceput \u00een mandatul Firea a fost blocat. Nu a realizat niciun metru de piste<\/p>\n<p>106. Amenajarea unei noi zone pietonale \u00een Centrul Istoric.<\/p>\n<p>Nu exist\u0103!<\/p>\n<p>107. Amenajarea treptelor \u0219i esplanadei de la Pia\u021ba Universit\u0103\u021bii.<\/p>\n<p>Nu exist\u0103<\/p>\n<p>108. Consolidarea cl\u0103dirii Teatrului Odeon.<\/p>\n<p>Fals!<\/p>\n<p>109. Restaurarea fa\u021badelor cl\u0103dirilor istorice din zona Armeneasc\u0103.<\/p>\n<p>Fals!<\/p>\n<p>110. Crearea unui program de protec\u021bie pentru arborii monument.<\/p>\n<p>Fals<\/p>\n<p>111. Lansarea aplica\u021biei oficiale \u201cPrim\u0103ria Capitalei\u201d.<\/p>\n<p>Fals. Nu exist\u0103 o asemenea aplica\u021bie.<\/p>\n<p>112. Lansarea unui program de mentorat pentru tinerii antreprenori.<\/p>\n<p>Fals<\/p>\n<p>113. Lansarea programului \u201cAdopt\u0103 un parc\u201d pentru ONG-uri.<\/p>\n<p>Fals<\/p>\n<p>114. Dotarea tuturor sta\u021biilor STB cu ad\u0103posturi moderne.<\/p>\n<p>Proiect din mandatul Firea<\/p>\n<p>115. Introducerea unei linii telefonice pentru urgen\u021be sociale.<\/p>\n<p>Mandarul Firea, perioada pandemiei Covid-19<\/p>\n<p>116. Implementarea Planului Integrat de Calitate a Aerului.<\/p>\n<p>Zero realiz\u0103ri<\/p>\n<p>117. Finalizarea consolid\u0103rii Palatului Universul.<\/p>\n<p>Proiect privat, nu are implicare PMB<\/p>\n<p>118. Amenajarea unei baze sportive moderne \u00een Parcul Copilului.<\/p>\n<p>Nu exist\u0103!<\/p>\n<p>119. Amenajarea a 10 terenuri de sport noi \u00een parcuri.<\/p>\n<p>Prim\u0103riile de sector<\/p>\n<p>120. Instalarea a 50 de f\u00e2nt\u00e2ni publice de ap\u0103 potabil\u0103.<\/p>\n<p>Nu exist\u0103<\/p>\n<p>121. Crearea unei platforme digitale pentru turismul cultural.<\/p>\n<p>Nu exist\u0103<\/p>\n<p>122. \u00cenfiin\u021barea unui consiliu consultativ pentru protejarea patrimoniului<\/p>\n<p>Nu exist\u0103<\/p>\n<p>123. Amenajarea de spa\u021bii verzi pe acoperi\u0219urile cl\u0103dirilor publice<\/p>\n<p>Nu exist\u0103<\/p>\n<p>124. Organizarea primului hackathon pentru solu\u021bii urbane.<\/p>\n<p>Nu exist\u0103<\/p>\n<p>125. Renovarea Pie\u021bei Roma din Pia\u021ba Amzei. Zero<\/p>\n<p>Nu exist\u0103<\/p>\n<p>26. Reabilitarea Pie\u021bei Cr\u00e2nga\u0219i.<\/p>\n<p>PS6<\/p>\n<p>127. Reabilitarea Pie\u021bei Obor.<\/p>\n<p>PS2<\/p>\n<p>128. Reabilitarea Pie\u021bei Sudului.<\/p>\n<p>Proiect realizat \u00een mandatul Firea de PMB si PS4<\/p>\n<p>129. Implementarea unui sistem digital pentru raportarea avariilor la termoficare.<\/p>\n<p>Nu exist\u0103<\/p>\n<p>130. \u00cenfiin\u021barea primei re\u021bele publice de \u00eenc\u0103rcare pentru biciclete electrice.<\/p>\n<p>Nu exist\u0103, nu este a PMB<\/p>\n<p>131. Crearea unui program de educa\u021bie ecologic\u0103 pentru elevi.<\/p>\n<p>Nu exist\u0103<\/p>\n<p>132. Organizarea \u201eNop\u021bii Muzeelor\u201d \u00een loca\u021bii gestionate de PMB.<\/p>\n<p>Nu din mandatul ND, ci de la momentul \u00eenfiin\u021b\u0103rii re\u021belei Noaptea Muzeelor<\/p>\n<p>133. Renovarea complet\u0103 a zonei adiacente Palatului \u0218u\u021bu.<\/p>\n<p>Nu exist\u0103<\/p>\n<p>134. Modernizarea infrastructurii rutiere din Bulevardul Aviatorilor.<\/p>\n<p>Nu exist\u0103<\/p>\n<p>135. Modernizarea iluminatului pe Splaiul Unirii.<\/p>\n<p>136. Implementarea unui plan pentru reducerea insulelor de c\u0103ldur\u0103 urban\u0103.<\/p>\n<p>Nu exist\u0103<\/p>\n<p>137. Restaurarea fa\u021badelor de pe Bulevardul Elisabeta.<\/p>\n<p>Proiect din mandatul Firea, au fost restaurate fa\u021badele din zona central\u0103. \u00cen mandatul ND, zero.<\/p>\n<p>138. Modernizarea sistemului de sonorizare din Arena Na\u021bional\u0103.<\/p>\n<p>139. Extinderea re\u021belei de internet public \u00een toate parcurile mari.<\/p>\n<p>Nu exist\u0103<\/p>\n<p>140. Finalizarea consolid\u0103rii cl\u0103dirii Liceului Laz\u0103r.<\/p>\n<p>Nu are implicare PMB<\/p>\n<p>141. Asfaltarea complet\u0103 a str\u0103zii Ze\u021barilor.<\/p>\n<p>PS5, nu are implicare PMB<\/p>\n<p>142. Amenajarea pistei de biciclete \u00eentre Pia\u021ba Victoriei \u0219i Roman\u0103.<\/p>\n<p>Nu exist\u0103<\/p>\n<p>143. Crearea unui program de granturi pentru start-up-uri verzi.<\/p>\n<p>Nu exist\u0103<\/p>\n<p>144. Reabilitarea trotuarelor \u0219i fa\u021badelor de pe Calea Mo\u0219ilor.<\/p>\n<p>Nu exist\u0103<\/p>\n<p>145. Restaurarea amfiteatrului din Parcul Her\u0103str\u0103u.<\/p>\n<p>Nu exist\u0103<\/p>\n<p>146. \u00cenfiin\u021barea unui program de consultare public\u0103 anual\u0103 pentru proiectele mari.<\/p>\n<p>Nu exist\u0103<\/p>\n<p>147. Derularea campaniei de sterilizare a animalelor f\u0103r\u0103 st\u0103p\u00e2n.<\/p>\n<p>\u00cen mandatul ND, o angajat\u0103 a PMB a fost ucis\u0103 de c\u00e2inii f\u0103r\u0103 st\u0103p\u00e2n \u0219i nimeni nu a r\u0103spuns legal<\/p>\n<p>148. Amenajarea unui sistem de colectare a apelor pluviale pentru iriga\u021bii.<\/p>\n<p>Fals. Nu exist\u0103 un asemenea proiect implementat \u00een mandatul ND.<\/p>\n<p>149. Organizarea T\u00e2rgului de Cr\u0103ciun din Pia\u021ba Constitu\u021biei f\u0103r\u0103 costuri externe.<\/p>\n<p>Fals! \u00cen fiecare an au fost milioane alocate de la bugetul Capitalei pentru t\u00e2rgurile de Cr\u0103ciun \u0219i Pa\u0219te<\/p>\n<p>150. Restaurarea cl\u0103dirii S\u0103lii Dalles.<\/p>\n<p>Fals<\/p>\n<p>151. Amenajarea unei parc\u0103ri etajate \u00een zona central\u0103.<\/p>\n<p>Fals. Nu a fost construit\u0103 nicio parcare etajat\u0103 \u00een centrul Capitalei.<\/p>\n<p>152. Digitalizarea arhivei de urbanism.<\/p>\n<p>Fals. Nu exist\u0103 o asemenea arhiv\u0103.<\/p>\n<p>153. Realizarea unui plan de gestionare a zgomotului urban.<\/p>\n<p>Fals. Nu exist\u0103 un asemenea plan.<\/p>\n<p>154. Amenajarea unei gr\u0103dini urbane comunitare \u00een cartierul Berceni.<\/p>\n<p>Fals. Nu exist\u0103!<\/p>\n<p>155. Reabilitarea treptelor din fa\u021ba Ateneului Rom\u00e2n.<\/p>\n<p>Fals. Ateneul Rom\u00e2n nu este \u00een administrarea PMB, ci a Ministerului Culturii<\/p>\n<p>156. Extinderea re\u021belei de colectare selectiv\u0103 \u00een pie\u021bele agroalimentare.<\/p>\n<p>Fals! PMB nu are \u00een administrare pie\u021bele agroalimentare, ci prim\u0103riile de sector.<\/p>\n<p>157. Dotarea gr\u0103dini\u021belor cu mobilier \u0219i echipamente moderne.<\/p>\n<p>Fals! PMB nu are \u00een administrare \u0219colile, ci prim\u0103riile de sector.<\/p>\n<p>158. Lansarea programului \u201cBucure\u0219ti \u2013 Ora\u0219 Inteligent\u201d.<\/p>\n<p>Fals. Nu exist\u0103 un asemenea program.<\/p>\n<p>159. Consolidarea cl\u0103dirii Teatrului Mic.<\/p>\n<p>Fals! Cl\u0103direa Teatrului Mic nu a fost consolidat\u0103.<\/p>\n<p>160. Reabilitarea spa\u021biului pietonal din zona Armeneasc\u0103.<\/p>\n<p>Fals<\/p>\n<p>161. Organizarea festivalului \u201eBucure\u0219ti \u2013 Ora\u0219 European al Culturii\u201d.<\/p>\n<p>Fals! PMB nu a organizat un asemenea festival, ci Capitala a fost doar candidat\u0103 la Capitala Cultural\u0103 2021, competi\u021bie c\u00e2\u0219tigat\u0103 de alt ora\u0219 european. Proiect din anul 2015<\/p>\n<p>162. Lansarea unui program de parteneriate cu universit\u0103\u021bile.<\/p>\n<p>Fals! Parteneriate cu universit\u0103\u021bile exist\u0103 de mul\u021bi ani<\/p>\n<p>163. Introducerea unui buget participativ pentru proiecte de cartier.<\/p>\n<p>Fals!<\/p>\n<p>164. Amenajarea unui nou skatepark \u00een zona Titan.<\/p>\n<p>Fals! Proiect realizat de PS 3, primarul Negoita<\/p>\n<p>165. \u00cenfiin\u021barea unei comisii pentru debirocratizarea accesului la servicii locale.<\/p>\n<p>Fals!<\/p>\n<p>166. Instalarea de co\u0219uri de gunoi inteligente cu senzori.<\/p>\n<p>Fals! PMB nu realizat asemenea proiect \u00een parcurile pe care le administreaz\u0103, ci prim\u0103riile de sector \u00een parcurile mai mici, de ex PS 1.<\/p>\n<p>167. Implementarea unui program pentru protec\u021bia fa\u021badelor degradate.<\/p>\n<p>Fals! Acest program a fost derulat \u00een mandatul Firea, 14 fa\u021bade restaurate \u00een centru, \u0219i blocat \u00een mandatul ND.<\/p>\n<p>168. Extinderea iluminatului arhitectural pentru cl\u0103diri de patrimoniu.<\/p>\n<p>Fals. Nu exist\u0103 un asemenea proiect.<\/p>\n<p>169. Lansarea unei campanii de educa\u021bie rutier\u0103 pentru elevi.<\/p>\n<p>Fals. Nu exist\u0103 un asemenea program.<\/p>\n<p>170. Reabilitarea cl\u0103dirii monument a fostei Prim\u0103rii Generale.<\/p>\n<p>Fals! Consolidarea cl\u0103dirii din Bd. Regina Elisabeta a \u00eenceput \u00een mandatul Oprescu \u0219i a fost finalizat\u0103 \u00een 2016 \u00een mandatul Firea.<\/p>\n<p>171. \u00cenfiin\u021barea unei linii de ajutor pentru victimele violen\u021bei domestice.<\/p>\n<p>Fals. Program \u00eenceput \u00een mandatul Firea, c\u00e2nd a fost deschis \u0219i prima locuin\u021b\u0103 protejat\u0103 pentru victimele violen\u021bei domestice.<\/p>\n<p>172. Lansarea programului \u201cBucure\u0219ti pentru bicicli\u0219ti\u201d.<\/p>\n<p>Fals. Nu exist\u0103 un asemenea program. Nu s-a construit nici un km de pist\u0103 \u00een ultimii 4 ani.<\/p>\n<p>173. Acordarea de subven\u021bii pentru eficien\u021b\u0103 energetic\u0103 \u00een locuin\u021be.<\/p>\n<p>Fals. Nu exist\u0103 un asemenea program.<\/p>\n<p>174. Crearea unui sistem GIS pentru planificare urban\u0103.<\/p>\n<p>Fals. Nu exist\u0103 un asemenea program.<\/p>\n<p>175. Organizarea de tururi ghidate pentru patrimoniul bucure\u0219tean.<br \/>\nFals. Nu exist\u0103 un asemenea program realizat de PMB, ci sunt doar proiecte derulate de ONG-uri sau persoane fizice.<\/p>\n<p>176. Realizarea unui sistem de alarmare seismic\u0103 pentru cl\u0103dirile \u0219colare.<br \/>\nFals. Nu exist\u0103 un asemenea program.<\/p>\n<p>177. Implementarea unui sistem digital integrat pentru managementul urban.<br \/>\nFals. Nu exist\u0103 un asemenea program.<\/p>\n<p>178. Finalizarea reabilit\u0103rii Pie\u021bei Matache.<br \/>\nFals. Nu exist\u0103 un asemenea proiect al PMB, ci al PS1<\/p>\n<p>179. Extinderea re\u021belei de coridoare verzi \u00eentre parcuri.<br \/>\nFals. Nu exist\u0103 un asemenea program.<\/p>\n<p>180. Lansarea platformei \u201cUrbanism Deschis\u201d pentru vizualizarea PUG.<br \/>\nFals. Nu exist\u0103 un asemenea program.<\/p>\n<p>181. Reabilitarea pasajului Lujerului.<br \/>\nFals! \u00cen mandatul ND nu a fost reabilitat pasajul Lujerului, ci \u00een mandatul Firea.<\/p>\n<p>182. Amenajarea unei gr\u0103dini senzoriale pentru copii cu dizabilit\u0103\u021bi.<br \/>\nFals. Nu exist\u0103 un asemenea proiect.<\/p>\n<p>183. Implementarea unui sistem de etichetare digital\u0103 pentru arborii publici.<br \/>\nFals. Nu exist\u0103 un asemenea proiect.<\/p>\n<p>184. Lansarea unui concurs anual de idei urbane pentru liceeni.<br \/>\nFals. Nu exist\u0103 un asemenea proiect.<\/p>\n<p>185. Reabilitarea integral\u0103 a str\u0103zii Polon\u0103.<br \/>\nFals. Nu exist\u0103 un asemenea proiect realizat de PMB \u00een mandatul ND.<\/p>\n<p>186. Modernizarea depoului de tramvaie Dude\u0219ti.<br \/>\nFals. Nu exist\u0103 un asemenea proiect.<\/p>\n<p>187. Modernizarea depoului de tramvaie Victoria.<br \/>\nFals. Nu exist\u0103 un asemenea proiect.<\/p>\n<p>188. Implementarea unei re\u021bele de colectare uleiuri uzate \u00een pie\u021be.<br \/>\nFals. Nu exist\u0103 un asemenea proiect implementat de PMB pt c\u0103 nu are \u00een administrare pie\u021be.<\/p>\n<p>189. Finalizarea reabilit\u0103rii Bulevardului Aviatorilor.<br \/>\nFals. Nu exist\u0103 un asemenea proiect realizat \u00een mandatul ND.<\/p>\n<p>190. Lansarea unei aplica\u021bii pentru monitorizarea lucr\u0103rilor publice.<br \/>\nFals. Nu exist\u0103 un asemenea proiect.<\/p>\n<p>191. Amenajarea unei promenade pe Splaiul D\u00e2mbovi\u021bei<br \/>\nFals. Nu exist\u0103 un asemenea proiect finalizat.<\/p>\n<p>192. Restaurarea Palatului \u0218u\u021bu \u2013 iluminat \u0219i fa\u021bad\u0103.<br \/>\nFals. Nu exist\u0103 un asemenea proiect derulat \u00een mandatul ND.<\/p>\n<p>193. Realizarea unei expozi\u021bii urbane permanente \u00een spa\u021biu public.<br \/>\nFals. Nu exist\u0103 un asemenea proiect.<\/p>\n<p>194. Dotarea autobuzelor cu internet gratuit.<br \/>\nFals. Nu exist\u0103 un Internet \u00een autobuze.<\/p>\n<p>195. Reabilitarea scuarurilor de pe Bulevardul Magheru.<br \/>\nFals. Nu exist\u0103 un asemenea proiect derulat de PMB<\/p>\n<p>196. Lansarea unei strategii pentru biodiversitate urban\u0103.<br \/>\nFals. Nu exist\u0103 un asemenea proiect.<\/p>\n<p>197. Renovarea pasajului pietonal Pia\u021ba Victoriei.<br \/>\nFals. Nu exist\u0103 un asemenea proiect realizat \u00een mandatul ND, mai mult, \u00een ultimii ani au c\u0103zut buc\u0103\u021bi peste ma\u0219ini sau pietonii care a\u0219teptau \u00een sta\u021bia de tramvai<\/p>\n<p>198. Organizarea unor consult\u0103ri lunare cu cet\u0103\u021benii \u00een fiecare sector.<br \/>\nFals. Nu exist\u0103 un asemenea proiect.<\/p>\n<p>199. Dotarea PMB cu infrastructur\u0103 cloud pentru date deschise.<br \/>\nFals. Nu exist\u0103 un asemenea proiect.<\/p>\n<p>200. Modernizarea complet\u0103 a Pie\u021bei Sudului.<br \/>\nSe repeta!!!! Proiect finalizat \u00een mandatul Firea, preluat blocat din mandatul Oprescu.<\/p>\n<p>\u00a0<\/p>\n<\/div>\n<div class=\"share-post\"><span class=\"share-text\">Share<\/span><\/p>\n<ul class=\"flat-social\">\n<li><a href=\"http:\/\/www.facebook.com\/sharer.php?u=https:\/\/www.incorectpolitic.com\/?p=79283\" class=\"social-facebook\" rel=\"external\" target=\"_blank\"><span>Facebook<\/span><\/a><\/li>\n<li><a href=\"https:\/\/twitter.com\/intent\/tweet?text=Lista+minciunilor+electorale+ale+lui+Nicusor+Dan&amp;url=https:\/\/www.incorectpolitic.com\/?p=79283\" class=\"social-twitter\" rel=\"external\" target=\"_blank\"><span>Twitter<\/span><\/a><\/li>\n<li><a href=\"http:\/\/pinterest.com\/pin\/create\/button\/?url=https:\/\/www.incorectpolitic.com\/?p=79283&amp;description=Lista+minciunilor+electorale+ale+lui+Nicusor+Dan&amp;media=https:\/\/analyse.optim.biz\/wp-content\/uploads\/2025\/12\/mucusor-1.jpg\" class=\"social-pinterest\" rel=\"external\" target=\"_blank\"><span>Pinterest<\/span><\/a><\/li>\n<\/ul>\n<\/div>\n<\/div>\n<\/article>\n<p> Source URL: https:\/\/www.incorectpolitic.com\/lista-minciunilor-electorale-ale-lui-nicusor-dan\/<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Lista minciunilor electorale ale lui Nicusor Dan Incorect Politic Mai 11, 2025 Lista minciunilor electorale ale lui Nicusor Dan Via Dana Budeanu: \u00a0 BUNA DIMINEATA, CELOR CARE DUPA CE AU VOTAT CU IOHANNIS DE DOUA ORI, L AU INJURAT FRUMOS LA FINAL (HAOLEU CE PROSTI AM FOST) SI ACUM, TOT PE NOBILISM BALCANIC, VOTEAZA INCOLONATI [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":793355,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[95],"class_list":["post-793354","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-romania","tag-incorectpolitic-com"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/793354","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=793354"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/793354\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/media\/793355"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=793354"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=793354"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=793354"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}