{"id":690199,"date":"2025-11-13T21:40:46","date_gmt":"2025-11-13T18:40:46","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=690199"},"modified":"2025-11-13T21:40:46","modified_gmt":"2025-11-13T18:40:46","slug":"autostrada-moldovei-a7-imagini-noi-cu-lotul-care-urmeaza-sa-fie-deschis-peste-doua-saptamani-a-inceput-inspectia","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=690199","title":{"rendered":"Autostrada Moldovei A7: Imagini noi cu lotul care urmeaz\u0103 s\u0103 fie deschis peste dou\u0103 s\u0103pt\u0103m\u00e2ni. A \u00eenceput inspec\u021bia"},"content":{"rendered":"<div class=\"entry-content entry clearfix\">\n<p>Compania Na\u021bional\u0103 de Administrare a Infrastructurii Rutiere (CNAIR) a transmis joi imagini de pe Lotul 3 Pietroasele \u2013 Municipiul Buz\u0103u (14 km) din tronsonul Ploie\u0219ti \u2013 Buz\u0103u al Autostr\u0103zii Moldovei A7.<\/p>\n<p>\u201eReprezentan\u021bii CNAIR \u0219i DRDP Buz\u0103u au efectuat o inspec\u021bie tehnic\u0103 preliminar\u0103 pe Lotul 3 al Autostr\u0103zii A7, sectorul Pietroasele \u2013 Municipiul Buz\u0103u, \u00een vederea receptiei finale \u0219i deschiderii traficului rutier\u201d,\u00a0men\u021bioneaz\u0103\u00a0reprezentan\u021bii CNAIR.<\/p>\n<p>Potrivit lor, verific\u0103rile au vizat starea carosabilului, marcajele rutiere, elementele de siguran\u021b\u0103 \u0219i infrastructura conex\u0103, cu scopul de a confirma conformitatea lucr\u0103rilor cu standardele tehnice \u0219i contractuale.<\/p>\n<p>\u201eLotul 3 reprezint\u0103 o verig\u0103 esen\u021bial\u0103 \u00een dezvoltarea coridorului rutier Moldova \u2013 Muntenia, iar deschiderea acestui tronson va fluidiza traficul \u0219i va reduce timpii de deplasare\u201d, mai spun reprezentan\u021bii CNAIR.<\/p>\n<p>\u00cen noiembrie 2023\u00a0a fost semnat\u00a0contractul pentru lotul Pietrosele \u2013 Buz\u0103u, cu asocierea de constructori turci Nurol \u2013 Makyol. Cu acea ocazie, ajunsese la final odiseea contract\u0103rii prin PNRR a celor 319 km din A7, potrivit lui Cristian Pistol, directorul general al CNAIR. El explicase c\u0103 licita\u021bia pentru acest lot fusese lansat\u0103 \u00een septembrie 2021, dar rezultatul ei fusese contestat de 4 ori.<\/p>\n<p>Lotul 3 Pietroasele \u2013 Municipiul Buz\u0103u (13,9 km)<br \/>Antreprenor: Asocierea Nurol In\u0219aat Ve Ticaret Anonim \u0218irketi \u2013 Makyol In\u0219aat Sanayi Turizm Ve Ticaret Anonim \u0218irketi;<br \/>Durat\u0103 contract: 20 de luni (execu\u021bie);<br \/>Valoare contract: 1,24 de miliarde de lei, f\u0103r\u0103 TVA;<br \/>Stadiu fizic actual: 85%.<\/p>\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"656\" height=\"347\" data-id=\"17388\" src=\"https:\/\/analyse.optim.biz\/wp-content\/uploads\/2025\/11\/a7-cnair.jpg\" class=\"wp-image-17388\" title=\"a7-cnair\"><\/figure>\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"635\" height=\"366\" data-id=\"17389\" src=\"https:\/\/analyse.optim.biz\/wp-content\/uploads\/2025\/11\/a7-cnair2.jpg\" class=\"wp-image-17389\" title=\"a7-cnair2\"><\/figure>\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"651\" height=\"351\" data-id=\"17390\" src=\"https:\/\/analyse.optim.biz\/wp-content\/uploads\/2025\/11\/a7-cnair3.jpg\" class=\"wp-image-17390\" title=\"a7-cnair3\"><\/figure>\n<\/figure>\n<\/div>\n<p> Source URL: https:\/\/gazetabuzoiana.ro\/2025\/11\/13\/autostrada-moldovei-a7-imagini-noi-cu-lotul-care-urmeaza-sa-fie-deschis-peste-doua-saptamani-a-inceput-inspectia\/<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Compania Na\u021bional\u0103 de Administrare a Infrastructurii Rutiere (CNAIR) a transmis joi imagini de pe Lotul 3 Pietroasele \u2013 Municipiul Buz\u0103u (14 km) din tronsonul Ploie\u0219ti \u2013 Buz\u0103u al Autostr\u0103zii Moldovei A7. \u201eReprezentan\u021bii CNAIR \u0219i DRDP Buz\u0103u au efectuat o inspec\u021bie tehnic\u0103 preliminar\u0103 pe Lotul 3 al Autostr\u0103zii A7, sectorul Pietroasele \u2013 Municipiul Buz\u0103u, \u00een vederea [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":690200,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[38],"class_list":["post-690199","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-politics","tag-gazetabuzoiana-ro"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/690199","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=690199"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/690199\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/media\/690200"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=690199"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=690199"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=690199"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}