{"id":625916,"date":"2025-08-19T09:25:20","date_gmt":"2025-08-19T06:25:20","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=625916"},"modified":"2025-08-19T09:25:20","modified_gmt":"2025-08-19T06:25:20","slug":"asociatia-pro-infrastructura-atrage-atentia-ca-principala-problema-a-magistralei-6-de-metrou-catre-otopeni-ramane-finantarea-video-momentul-strapungerii-de-catre-cartita-sfanta-maria","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=625916","title":{"rendered":"Asocia\u021bia Pro Infrastructur\u0103 atrage aten\u021bia c\u0103 principala problem\u0103 a Magistralei 6 de metrou c\u0103tre Otopeni r\u0103m\u00e2ne finan\u021barea \/ VIDEO: momentul str\u0103pungerii de c\u0103tre c\u00e2rti\u021ba \u201eSf\u00e2nta Maria\u201d la sta\u021bia Aeroport B\u0103neasa"},"content":{"rendered":"<div class=\"post-content\">\n<p data-start=\"47\" data-end=\"481\">De\u0219i s-au \u00eenregistrat progrese \u00een teren \u2013 c\u00e2rti\u021ba \u201eSf\u00e2nta Maria\u201d a str\u0103puns primul segment de tunel \u00eentre primele dou\u0103 sta\u021bii Tokyo \u0219i Aeroport B\u0103neasa, moment \u00eencheiat ieri \u2013 banii sunt incer\u021bi, aten\u021bioneaz\u0103 Asocia\u021bia Pro Infrastructur\u0103. Sta\u021biile 1 Mai\u2013Tokyo au aprobare UE pentru fonduri de coeziune, dar finan\u021barea PNRR s-a pierdut \u0219i proiectul trebuie readus \u00een Programul Transport. \u00centre timp, costurile fixe ajung la 3,5 milioane euro lunar, iar riscul unor \u00eent\u00e2rzieri similare cu cele de pe M5 de pe Drumul Taberei este ridicat, atrage aten\u021bia organiza\u021bia.<\/p>\n<div class=\"code-block code-block-15\">\n<h4>Urm\u0103re\u0219te cele mai noi produc\u021bii video G4Media<\/h4>\n<h5>&#8211; articolul continu\u0103 mai jos &#8211;<\/h5>\n<\/div>\n<p>\u201eNe bucur\u0103m s\u0103 vedem progres \u00een teren, \u00eens\u0103 marea necunoscut\u0103 r\u0103m\u00e2ne finan\u021barea. Sta\u021biile 1 Mai-Tokyo au fost aprobate de Comisia European\u0103 s\u0103 primeasc\u0103 fonduri de coeziune. Oficialii Metrorex \u0219i MT au \u00eencercat s\u0103 \u00eenlocuiasc\u0103 \u00een PNRR magistrala M4 Gara de Nord-Filaret cu aceasta. Numai c\u0103 acum finan\u021barea PNRR s-a evaporat \u0219i proiectul trebuie readus urgent \u00een Programul Transport.<\/p>\n<p>Lunar, \u0219antierul poate aduna p\u00e2n\u0103 la 3,5 milioane de euro costuri fixe chiar dac\u0103 nu se mi\u0219c\u0103 un deget. Dac\u0103 nu vrem s\u0103 p\u0103\u021bim ca la Magistrala M5 care a suferit aproape doi ani din lipsa banilor, unde instan\u021ba ne-a pus s\u0103 achit\u0103m vreo 40 de milioane euro daune c\u0103tre constructor, trebuie s\u0103 mai g\u0103sim ceva prin buzunare \u0219i pentru M6\u2026 Sud.\u201d, scrie API.<\/p>\n<p data-start=\"483\" data-end=\"761\">Pe sec\u021biunea Washington\u2013Otopeni (M6-Nord), Comisia European\u0103 a refuzat finan\u021barea nerambursabil\u0103, ceea ce oblig\u0103 statul s\u0103 acopere costurile din buget \u0219i \u00eemprumuturi, puncteaz\u0103 ONG-ul.<\/p>\n<p data-start=\"483\" data-end=\"761\">Magistrala M6, cu 12 sta\u021bii pe traseul Gara de Nord \u2013 Aeroport Otopeni, este planificat\u0103 s\u0103 fie finalizat\u0103 \u00een 2028, \u00eens\u0103 contractele pentru \u0219in\u0103, instala\u021bii \u0219i trenuri de metrou \u00eenc\u0103 sunt \u00een procedur\u0103. Mai multe detalii <a href=\"https:\/\/economedia.ro\/asociatia-pro-infrastructura-marea-necunoscuta-pentru-metroul-de-otopeni-ramane-finantarea.html\" target=\"_blank\" rel=\"noopener\">AICI<\/a>.<\/p>\n<p data-start=\"483\" data-end=\"761\"><strong>VIDEO \u2013 momentul str\u0103pungerii. Metrorex a permis accesul API pe \u0219antier\u00a0<\/strong><\/p>\n<p data-start=\"232\" data-end=\"484\">Luni, 18 august, la ora 12:15, utilajul de foraj \u201eSf\u00e2nta Maria\u201d a str\u0103puns peretele sta\u021biei Aeroport B\u0103neasa, pe sec\u021biunea sudic\u0103 a Magistralei 6 de metrou din Bucure\u0219ti. Momentul cu buc\u0103\u021bile de zid care se fac \u021b\u0103nd\u0103ri \u0219i apari\u021bia discului gigantic a fost surprins pe video de Asocia\u021bia Pro Infrastructur\u0103, prezent\u0103 la eveniment.<\/p>\n<p data-start=\"486\" data-end=\"875\">Pornit\u0103 pe 9 aprilie 2025 din sta\u021bia Tokyo (zona Mall B\u0103neasa), c\u00e2rti\u021ba a parcurs aproape 900 de metri \u00een mai pu\u021bin de cinci luni. Dup\u0103 o revizie tehnic\u0103, utilajul va porni spre Gara B\u0103neasa, unde este a\u0219teptat \u00een dou\u0103-trei luni. Pe cel\u0103lalt sens, \u201eSf\u00e2nta Ana\u201d se afl\u0103 la sub 500 de metri distan\u021b\u0103 \u0219i ar putea ajunge \u00een Aeroport B\u0103neasa \u00een septembrie, dac\u0103 \u00ee\u0219i p\u0103streaz\u0103 ritmul de lucru. Ea va s\u0103pa\u00a012 metri zilnic, \u00een medie. Recordul a fost 24 de metri \u00eentr-o singur\u0103 zi.<\/p>\n<p data-start=\"486\" data-end=\"875\"><iframe loading=\"lazy\" title=\"YouTube video player\" src=\"https:\/\/www.youtube.com\/embed\/mvGS_QoT648?si=DILFoUt327nRk_DD\" width=\"560\" height=\"315\" frameborder allowfullscreen=\"allowfullscreen\"><\/iframe><\/p>\n<p data-start=\"483\" data-end=\"761\">Sursa informa\u021biei: postarea <a href=\"https:\/\/www.facebook.com\/100066405353715\/posts\/pfbid02FzbmvZsP7qpFnx3yx6eHH7U5EzTFyPG3oi3UezRE3KPkvNMpfnZfbZ4sVeyBwVMzl\/\" target=\"_blank\" rel=\"noopener\">Asocia\u021biei Pro Infrastructur\u0103<\/a><\/p>\n<p data-start=\"483\" data-end=\"761\">Informa\u021bii oficiale despre <a href=\"https:\/\/magistrala6.ro\/\" target=\"_blank\" rel=\"noopener\">magistrala M6<\/a><\/p>\n<\/div>\n<p> Source URL: https:\/\/www.g4media.ro\/asociatia-pro-infrastructura-atrage-atentia-ca-principala-problema-a-magistralei-6-de-metrou-catre-otopeni-ramane-finantarea-video-momentul-strapungerii-de-catre-cartita-sfanta-maria.html<\/p>\n","protected":false},"excerpt":{"rendered":"<p>De\u0219i s-au \u00eenregistrat progrese \u00een teren \u2013 c\u00e2rti\u021ba \u201eSf\u00e2nta Maria\u201d a str\u0103puns primul segment de tunel \u00eentre primele dou\u0103 sta\u021bii Tokyo \u0219i Aeroport B\u0103neasa, moment \u00eencheiat ieri \u2013 banii sunt incer\u021bi, aten\u021bioneaz\u0103 Asocia\u021bia Pro Infrastructur\u0103. Sta\u021biile 1 Mai\u2013Tokyo au aprobare UE pentru fonduri de coeziune, dar finan\u021barea PNRR s-a pierdut \u0219i proiectul trebuie readus \u00een [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":625917,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[24],"class_list":["post-625916","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-politics","tag-g4media"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/625916","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=625916"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/625916\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/media\/625917"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=625916"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=625916"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=625916"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}