{"id":610817,"date":"2025-07-21T19:43:25","date_gmt":"2025-07-21T16:43:25","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=610817"},"modified":"2025-07-21T19:43:25","modified_gmt":"2025-07-21T16:43:25","slug":"asociatia-pro-infrastructura-ii-reproseaza-primarului-clujului-atacul-subteran-un-gest-execrabil-al-primarului-emil-boc-care-are-nevoie-de-un-dusman-imaginar-pe-care-sa-dea-vina-c","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=610817","title":{"rendered":"Asocia\u021bia Pro Infrastructur\u0103 \u00eei repro\u0219eaz\u0103 primarului Clujului \u201eatacul subteran\u201d: Un gest execrabil al primarului Emil Boc care are nevoie de un du\u0219man (imaginar) pe care s\u0103 dea vina ca s\u0103-\u0219i ascund\u0103 propria incompeten\u021b\u0103"},"content":{"rendered":"<div class=\"post-content\">\n<p>Primarul Clujului, Emil Boc, a avut mai multe reac\u021bii publice dup\u0103 ce\u00a0 \u00een presa local\u0103 dar \u0219i prin intermediul Asocia\u021biei Pro Infrastructur\u0103 a fost acuzat c\u0103 \u00een campania electoral\u0103 s-a gr\u0103bit s\u0103 inaugureze \u2013 \u00een prezen\u021ba premierului de la vremea respectiv\u0103 \u0219i a altor oficiali guvernamentali \u2013 \u0219antierul metroului, \u00een condi\u021biile \u00een care acest proiect a fost scos din PNRR, iar \u00een prezent nu exist\u0103 identificat\u0103 nicio surs\u0103 de finan\u021bare care s\u0103 asigure continuarea lucr\u0103rilor. Boc i-a \u00eenvinov\u0103\u021bit, \u00eentr-un mesaj video, pe \u201er\u0103uvoitorii care nu-\u0219i doresc s\u0103 se construiasc\u0103 acest proiect la Cluj\u201d, subliniind c\u0103 Prim\u0103ria are \u00eencheiat un contract cu Ministerul Transporturilor pentru proiectul Metroului. Edilul clujean i-a \u00eenvinuit \u00een special pe reprezentan\u021bii Asocia\u021biei Pro-Infrastructur\u0103, acuz\u00e2ndu-i c\u0103 lanseaz\u0103 informa\u021bii neadev\u0103rate \u00een spa\u021biul public.<\/p>\n<div class=\"code-block code-block-15\">\n<h4>Urm\u0103re\u0219te cele mai noi produc\u021bii video G4Media<\/h4>\n<h5>&#8211; articolul continu\u0103 mai jos &#8211;<\/h5>\n<\/div>\n<p>\u00cen replic\u0103, Asocia\u021bia Pro-Infrastructur\u0103 transmite c\u0103 \u201eatacul subteran\u201d lansat de primarul Boc nu rezolv\u0103 problema clujenilor. \u201eSup\u0103rat c\u0103 a r\u0103mas f\u0103r\u0103 argumente, domnul Boc recurge la atacul la persoan\u0103. \u021ainta: Ionu\u021b Ciurea, directorul nostru executiv, \u0219i prin extensie asocia\u021bia \u0219i \u00eentreaga comunitate. Un gest execrabil al primarului care are nevoie de un du\u0219man (imaginar) pe care s\u0103 dea vina ca s\u0103-\u0219i ascund\u0103 propria incompeten\u021b\u0103\u201d, se precizeaz\u0103 \u00een comunicat.<\/p>\n<p>Asocia\u021bia avertizeaz\u0103 c\u0103 este\u00a0frapant\u0103 diferen\u021ba dintre avansul de 232 milioane euro dat (din bugetul statului) \u00een 2024 de Prim\u0103ria Cluj-Napoca constructorului G\u00fclermak pentru metroul u\u0219or \u0219i ceea ce avem dup\u0103 26 de luni de la semnarea contractului: ni\u0219te piese de TBM (ma\u0219in\u0103riile care sap\u0103 tunelurile) care zac dezasamblate, un biet zid de sprijin \u0219i zero mi\u0219care \u00een teren. Proiectul tehnic nici acum nu e gata, la aproape un an dup\u0103 ce a expirat termenul\u201d, se precizeaz\u0103 \u00een comunicat, fiind postate mai multe imagini din \u0219antier.<\/p>\n<figure id=\"attachment_1097513\" aria-describedby=\"caption-attachment-1097513\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-1097513  perfmatters-lazy\" src=\"https:\/\/analyse.optim.biz\/wp-content\/uploads\/2025\/07\/metrou-cluj-statia-teilor-1024x576-1.jpg\" alt=\"Metrou Cluj, stat\u0326ia Teilor, stadiu lucrari\" width=\"826\" height=\"465\" title=\"metrou-cluj-statia-teilor-1024x576-1\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-1097513 \" src=\"https:\/\/analyse.optim.biz\/wp-content\/uploads\/2025\/07\/metrou-cluj-statia-teilor-1024x576-1.jpg\" alt=\"Metrou Cluj, stat\u0326ia Teilor, stadiu lucrari\" width=\"826\" height=\"465\" title=\"metrou-cluj-statia-teilor-1024x576-1\"><figcaption id=\"caption-attachment-1097513\" class=\"wp-caption-text\">sursa foto: Asocia\u021bia Pro Infrastructura<\/figcaption><\/figure>\n<p class=\"p1\">Potrivit Asocia\u021biei Pro Infrastructur\u0103, avansul pe care Boc l-a pl\u0103tit companiei turce provine din fondul de rezerv\u0103 al guvernului, in ipoteza c\u0103 lucr\u0103rile vor continua din bugetul PNRR: \u201e\u00cen iunie 2024 ex-premierul Ciolacu a virat 170 milioane \u20ac din fondul de rezerv\u0103 al guvernului (!) c\u0103tre Prim\u0103ria Cluj-Napoca, argument\u00e2nd c\u0103 este investi\u021bie PNRR \u0219i e grab\u0103 mare. Imediat \u00een august, Comisia European\u0103 reclam\u0103 problemele de achizi\u021bie public\u0103 \u0219i arat\u0103 c\u0103 nu se poate atinge jalonul care cere ca metroul u\u0219or s\u0103 fie la 50% stadiu fizic la final de 2024. Pe 2 septembrie 2024 Ciolacu confirm\u0103 public c\u0103 metroul clujean pierde banii PNRR. Dar acum, aproape un an mai t\u00e2rziu, domnul Boc face pe niznaiul \u0219i declar\u0103 senin c\u0103: nu am primit nicio informare deocamdat\u0103 cu privire la metrou, dac\u0103 r\u0103m\u00e2ne sau nu \u00een PNRR\u201d.<\/p>\n<p>Reprezentan\u021bii Asocia\u021biei mai arat\u0103 c\u0103 angajamentul semnat cu Ministerul Transporturilor nu reprezint\u0103 vreo garan\u021bie \u00een privin\u021ba continu\u0103rii lucr\u0103rilor la metroul din Cluj. Mai mult, sursele pe care Boc le indic\u0103 ca posibile variante de finan\u021bare, sunt deja ocupate de al\u021bi competitori politici.<\/p>\n<p class=\"p1\">\u201eBoc se laud\u0103 c\u0103 are contract cu Ministerul Transporturilor unde sunt trecute sursele de finan\u021bare, dar asta nu ofer\u0103 nicio garan\u021bie c\u0103 proiectul va primi vreun leu. A se vedea cum s-au evaporat banii PNRR. Primarul ne lini\u0219te\u0219te c\u0103 exist\u0103 \u201esurse alternative\u201d ca s\u0103 fac\u0103 rost de diferen\u021ba de 1,8 miliarde euro cu TVA inclus\u0103: Programul Transport \u0219i certificatele verzi.<\/p>\n<p class=\"p1\">\u00cen Programul Transport nu prea mai e loc, a\u0219a cum v-am explicat recent. Boc nici n-a depus cererea de finan\u021bare, a\u0219a cum a f\u0103cut cu trenul metropolitan, de pild\u0103. Alocarea de 1,2 miliarde \u20ac este deja supracontractat\u0103 cu Magistrala M4 din Bucure\u0219ti de 2,15 miliarde \u20ac a primarului PSD B\u0103lu\u021b\u0103 de la Sectorul 4. B\u0103lu\u021b\u0103-Boc, 1-0. Bravo, PSD! C\u0103 tot minte Boc c\u0103 suntem \u201eechipa de cas\u0103 a USR\u201d.<\/p>\n<p class=\"p1\">Certificatele verzi? O himer\u0103. Din bugetul AFM afl\u0103m c\u0103 Rom\u00e2nia \u0219i-a propus s\u0103 v\u00e2nd\u0103 certificate de emisii de gaze cu efect de ser\u0103 de 1,62 miliarde \u20ac \u00een 2024 dar a reu\u0219it s\u0103 str\u00e2ng\u0103 doar 0,78 miliarde, iar \u00een 2025 \u021binte\u0219te 1,3 miliarde \u20ac. AFM deruleaz\u0103 o puzderie de programe, inclusiv Rabla Auto. Care a fost suspendat \u0219i este a\u0219teptat s\u0103 fie relansat\u2026 c\u00e2ndva. C\u00e2\u021bi bani ar putea r\u0103m\u00e2ne anual pentru metroul clujean?!<\/p>\n<p class=\"p1\">Boc ne mai spune c\u0103 are autoriza\u021bie de construire. Se refer\u0103 la cea dat\u0103 ILEGAL de Consiliul Jude\u021bean Cluj \u00een 21.05.2024, prin invocarea aiurea a Art. 7 alin. (16) din Legea 50\/1991 privind autorizarea execut\u0103rii lucr\u0103rilor de construc\u021bii, prevedere care se aplic\u0103 exclusiv \u00een caz de urgen\u021b\u0103 ori for\u021b\u0103 major\u0103.<\/p>\n<p class=\"p1\">Cum poate fi proiectarea \u0219i execu\u021bia unei magistrale de metrou u\u0219or care dureaz\u0103 8 ani de zile s\u0103 fie \u00eencadrat\u0103 la interven\u021bii \u201eobligatorii \u00een cazuri de avarii, accidente tehnice, calamit\u0103\u021bi ori alte evenimente cu caracter excep\u021bional\u201d?<\/p>\n<p class=\"p1\">Singurele calamit\u0103\u021bi sunt \u201eargumentele\u201d domnului Boc. De fapt, for\u021ba major\u0103 era ceremonia electoral\u0103 de prost gust regizat\u0103 cu ocazia primei lope\u021bi din 5 iunie 2024 \u0219i era nevoie s\u0103 arate o h\u00e2rtie ca s\u0103 nu zicem noi c\u0103 au \u00eenceput lucr\u0103rile (vorba vine) f\u0103r\u0103 autoriza\u021bie.<\/p>\n<p class=\"p1\">\u00cen iunie 2025 primarul ne spunea c\u0103 s\u0103p\u0103turile la Pu\u021bul de Lansare Scut (PLS) vor \u00eencepe \u00een iulie. Acum ne anun\u021b\u0103 c\u0103 pe 11 august (fix) \u00eencepe execu\u021bia pere\u021bilor mula\u021bi la PLS \u0219i d\u0103 de \u00een\u021beles c\u0103 intr\u0103 imediat c\u00e2rti\u021bele \u00een teren. De fapt nu, c\u00e2rti\u021bele nu vor \u00eencepe s\u0103 sape anul \u0103sta, ci prin aprilie 2026 \u00een cel mai optimist scenariu. Vede\u021bi cum trebuie s\u0103 arate un PLS \u00een pozele de la Magistrala M6\u201d se precizeaz\u0103 \u00een comunicatul Asocia\u021biei Pro Infrastructur\u0103.<\/p>\n<p>Primarului clujean i se recomand\u0103 s\u0103-\u0219i fac\u0103 echipe de exper\u021bi: \u201e\u00cen loc s\u0103 asigure transparen\u021b\u0103 pe bune \u0219i s\u0103-\u0219i fac\u0103 echip\u0103 de exper\u021bi dedicat\u0103 investi\u021biilor majore, metroul, trenul \u0219i centura metropolitan\u0103, primarul Boc ne atac\u0103 furibund pe noi \u0219i se umple de penibil l\u0103ud\u00e2ndu-se cu inaugurarea leg\u0103turii dintre A3 \u0219i DN1 de la Tureni, o lucrare f\u0103cut\u0103 cap-coad\u0103 de CNAIR f\u0103r\u0103 nicio leg\u0103tur\u0103 cu Prim\u0103ria Cluj-Napoca\u201d.<\/p>\n<\/div>\n<p> Source URL: https:\/\/www.g4media.ro\/asociatia-pro-infrastructura-ii-reproseaza-primarului-clujului-atacul-subteran-un-gest-execrabil-al-primarului-care-are-nevoie-de-un-dusman-imaginar-pe-care-sa-dea-vina-ca-sa-si-a.html<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Primarul Clujului, Emil Boc, a avut mai multe reac\u021bii publice dup\u0103 ce\u00a0 \u00een presa local\u0103 dar \u0219i prin intermediul Asocia\u021biei Pro Infrastructur\u0103 a fost acuzat c\u0103 \u00een campania electoral\u0103 s-a gr\u0103bit s\u0103 inaugureze \u2013 \u00een prezen\u021ba premierului de la vremea respectiv\u0103 \u0219i a altor oficiali guvernamentali \u2013 \u0219antierul metroului, \u00een condi\u021biile \u00een care acest proiect [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":610818,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[24],"class_list":["post-610817","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-politics","tag-g4media"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/610817","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=610817"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/610817\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/media\/610818"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=610817"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=610817"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=610817"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}