{"id":607828,"date":"2025-07-16T09:44:34","date_gmt":"2025-07-16T06:44:34","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=607828"},"modified":"2025-07-16T09:44:34","modified_gmt":"2025-07-16T06:44:34","slug":"foto-cfr-deschide-joi-primul-tunel-feroviar-nou-dupa-8-ani-de-lucrari-cu-viteza-trenului-marfar-in-lungime-de-650-m-tunelul-batuta-intra-in-circulatie-pe-un-proiectat-traseu-de-m","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=607828","title":{"rendered":"FOTO CFR deschide joi primul tunel feroviar nou, dup\u0103 8 ani de lucr\u0103ri cu \u201eviteza trenului m\u0103rfar\u201d \/ \u00cen lungime de 650 m, tunelul B\u0103tu\u021ba intr\u0103 \u00een circula\u021bie pe un proiectat traseu de mare vitez\u0103 \u00een jude\u021bul Arad, de 160 km\/h"},"content":{"rendered":"<div class=\"post-content\">\n<p>Dup\u0103 ani de \u00eent\u00e2rzieri, Rom\u00e2nia inaugureaz\u0103 joi, 17 iulie, primul tunel feroviar nou construit \u00een ultimii opt ani. Este vorba despre tunelul B\u0103tu\u021ba (cunoscut \u0219i ca tunelul Bata), de 650 metri lungime, parte dintr-o variant\u0103 de traseu feroviar nou\u0103, de 13 kilometri, \u00eentre sta\u021biile B\u00e2rzava \u0219i V\u0103r\u0103dia, \u00een jude\u021bul Arad.<\/p>\n<div class=\"code-block code-block-15\">\n<h4>Urm\u0103re\u0219te cele mai noi produc\u021bii video G4Media<\/h4>\n<h5>&#8211; articolul continu\u0103 mai jos &#8211;<\/h5>\n<\/div>\n<p>\u201eDe\u0219i \u00een ultima perioad\u0103 noile buc\u0103\u021bi de autostrad\u0103 se \u021bin lan\u021b, noile c\u0103i ferate sunt rare, scurte \u0219i (re)construc\u021bia lor dureaz\u0103 chiar \u0219i de 2-3 ori mai mult. Joi, 17 iulie, se va deschide traficul pe un traseu feroviar nou de 13 km \u00eentre sta\u021biile B\u00e2rzava \u0219i V\u0103r\u0103dia, jude\u021bul Arad. Scopul variantei este asigurarea vitezei de 160 km\/h \u00eentre Curtici \u0219i Simeria (cu \u00eencetiniri la 100 la Arad, Radna \u0219i Deva), aceast\u0103 vitez\u0103 nefiind posibil\u0103 pe linia veche \u0219i sinuoas\u0103.\u201d, scrie Asocia\u021bia Pro Infrastructura.<\/p>\n<p>Traseul include, pe l\u00e2ng\u0103 tunel, \u0219i dou\u0103 poduri peste r\u00e2ul Mure\u0219, fiecare lung de aproape 500 de metri. La deschidere, trenurile vor circula cu o vitez\u0103 de 120 km\/h, iar pe poduri se vor aplica ini\u021bial restric\u021bii la 70 km\/h, p\u00e2n\u0103 la efectuarea rodajului de tonaj.<\/p>\n<p>Linia veche, aflat\u0103 pe malul nordic al Mure\u0219ului, va r\u0103m\u00e2ne \u00een func\u021biune pe un singur fir, fiind utilizat\u0103 \u00een special de trenurile Regio, folosite zilnic de localnici \u00eenc\u0103 din 1868.<\/p>\n<p>Construc\u021bia tunelului \u0219i a traseului a fost marcat\u0103 de \u00eent\u00e2rzieri majore, iar contractul pentru acest lot a fost semnat \u00een 2017, \u00eens\u0103 lucr\u0103rile s-au mi\u0219cat cu \u201eviteza unui tren marfar\u201d, spun speciali\u0219tii \u00een infrastructur\u0103.<\/p>\n<p>Problemele principale semnalate de organiza\u021bie au fost c\u0103 proiectul tehnic al CFR a fost slab \u0219i a necesitat doi ani de reproiectare, la cap\u0103tul sudic al tunelului, lucr\u0103rile de consolidare au fost blocate pentru c\u0103 nu exista autoriza\u021bie de t\u0103iere a copacilor de pe versant, dar \u0219i faptul c\u0103 tunelul a fost str\u0103puns abia \u00een ianuarie 2023, iar traficul feroviar a trebuit s\u0103 a\u0219tepte \u00eenc\u0103 un an pentru finalizarea lucr\u0103rilor de sprijin la gura tunelului.<\/p>\n<p>\u201e\u00cen Rom\u00e2nia, p\u0103durile se taie ilegal foarte u\u0219or \u0219i legal extrem de greu,\u201d ironizeaz\u0103 speciali\u0219tii Pro Infrastructura, critic\u00e2nd birocra\u021bia excesiv\u0103 care a \u00eempiedicat autoriza\u021biile necesare.<\/p>\n<figure id=\"attachment_1093981\" aria-describedby=\"caption-attachment-1093981\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-1093981 size-large perfmatters-lazy\" src=\"https:\/\/analyse.optim.biz\/wp-content\/uploads\/2025\/07\/520231547_1091990403024461_3888772508207161679_n-1024x576-1.jpg\" alt=\"Sursa: Asocia\u021bia Pro Infrastructura\" width=\"1024\" height=\"576\" title=\"520231547_1091990403024461_3888772508207161679_n-1024x576-1\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-1093981 size-large\" src=\"https:\/\/analyse.optim.biz\/wp-content\/uploads\/2025\/07\/520231547_1091990403024461_3888772508207161679_n-1024x576-1.jpg\" alt=\"Sursa: Asocia\u021bia Pro Infrastructura\" width=\"1024\" height=\"576\" title=\"520231547_1091990403024461_3888772508207161679_n-1024x576-1\"><figcaption id=\"caption-attachment-1093981\" class=\"wp-caption-text\">Sursa: Asocia\u021bia Pro Infrastructura<\/figcaption><\/figure>\n<figure id=\"attachment_1093982\" aria-describedby=\"caption-attachment-1093982\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-1093982 size-large perfmatters-lazy\" src=\"https:\/\/analyse.optim.biz\/wp-content\/uploads\/2025\/07\/518400232_1091990286357806_7797125017615478516_n-1024x576-1.jpg\" alt=\"Sursa: Asocia\u021bia Pro Infrastructura\" width=\"1024\" height=\"576\" title=\"518400232_1091990286357806_7797125017615478516_n-1024x576-1\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-1093982 size-large\" src=\"https:\/\/analyse.optim.biz\/wp-content\/uploads\/2025\/07\/518400232_1091990286357806_7797125017615478516_n-1024x576-1.jpg\" alt=\"Sursa: Asocia\u021bia Pro Infrastructura\" width=\"1024\" height=\"576\" title=\"518400232_1091990286357806_7797125017615478516_n-1024x576-1\"><figcaption id=\"caption-attachment-1093982\" class=\"wp-caption-text\">Sursa: Asocia\u021bia Pro Infrastructura<\/figcaption><\/figure>\n<figure id=\"attachment_1093983\" aria-describedby=\"caption-attachment-1093983\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-1093983 size-large perfmatters-lazy\" src=\"https:\/\/analyse.optim.biz\/wp-content\/uploads\/2025\/07\/518888322_1091990339691134_7454382498642504684_n-1024x576-1.jpg\" alt=\"Sursa: Asocia\u021bia Pro Infrastructura\" width=\"1024\" height=\"576\" title=\"518888322_1091990339691134_7454382498642504684_n-1024x576-1\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-1093983 size-large\" src=\"https:\/\/analyse.optim.biz\/wp-content\/uploads\/2025\/07\/518888322_1091990339691134_7454382498642504684_n-1024x576-1.jpg\" alt=\"Sursa: Asocia\u021bia Pro Infrastructura\" width=\"1024\" height=\"576\" title=\"518888322_1091990339691134_7454382498642504684_n-1024x576-1\"><figcaption id=\"caption-attachment-1093983\" class=\"wp-caption-text\">Sursa: Asocia\u021bia Pro Infrastructura<\/figcaption><\/figure>\n<p><strong>Alte \u0219antiere feroviare \u00eent\u00e2rziate<\/strong><\/p>\n<p>Tunelul B\u0103tu\u021ba reprezint\u0103 doar o mic\u0103 parte din modernizarea Coridorului IV feroviar, afirm\u0103 Pro Intrastructura. Proiectele vecine, semnate tot \u00een 2017, sunt \u00eens\u0103 \u0219i mai \u00een urm\u0103.<\/p>\n<p>Varianta Ve\u021bel (\u00eentre Ilia \u0219i Mintia), cu trei poduri noi peste Mure\u0219, are \u0219anse s\u0103 fie gata \u00een 2025, dup\u0103 ani de blocaj din cauza sitului arheologic Micia.<\/p>\n<p>\u00cen schimb, sec\u021biunea Ilteu \u2013 C\u00e2mpuri Surduc, care include trei tuneluri, este grav \u00eent\u00e2rziat\u0103 din cauza problemelor constructorului Aktor \u0219i nu este a\u0219teptat\u0103 s\u0103 fie gata mai devreme de 2028 \u2013 2030.<\/p>\n<p>\u00a0<\/p>\n<\/div>\n<p> Source URL: https:\/\/www.g4media.ro\/foto-cfr-deschide-joi-primul-tunel-feroviar-nou-dupa-8-ani-de-lucrari-cu-viteza-trenului-marfar-in-lungime-de-650-m-tunelul-batuta-intra-in-circulatie-pe-un-proiectat-traseu-de-m.html<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Dup\u0103 ani de \u00eent\u00e2rzieri, Rom\u00e2nia inaugureaz\u0103 joi, 17 iulie, primul tunel feroviar nou construit \u00een ultimii opt ani. Este vorba despre tunelul B\u0103tu\u021ba (cunoscut \u0219i ca tunelul Bata), de 650 metri lungime, parte dintr-o variant\u0103 de traseu feroviar nou\u0103, de 13 kilometri, \u00eentre sta\u021biile B\u00e2rzava \u0219i V\u0103r\u0103dia, \u00een jude\u021bul Arad. Urm\u0103re\u0219te cele mai noi produc\u021bii [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":607829,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[24],"class_list":["post-607828","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-politics","tag-g4media"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/607828","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=607828"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/607828\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/media\/607829"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=607828"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=607828"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=607828"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}