{"id":566989,"date":"2025-05-12T20:37:22","date_gmt":"2025-05-12T17:37:22","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=566989"},"modified":"2025-05-12T20:37:22","modified_gmt":"2025-05-12T17:37:22","slug":"marcel-bolos-sustine-ca-este-esential-ca-renegocierea-pnrr-sa-se-incheie-pana-la-finalul-lunii-mai","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=566989","title":{"rendered":"Marcel Bolo\u0219 sus\u021bine c\u0103 este esen\u0163ial ca renegocierea PNRR s\u0103 se \u00eencheie p\u00e2n\u0103 la finalul lunii mai"},"content":{"rendered":"<div class=\"entry data-app-meta data-app-meta-article\" data-embed-base-url-canonical=\"https:\/\/www.digi24.ro\/embed\/stiri\/actualitate\/politica\/marcel-bolos-sustine-ca-esential-ca-renegocierea-pnrr-sa-se-incheie-pana-la-finalul-lunii-mai-3237515\">\n<p data-index=\"1\"><strong>Renegocierea Planului Na\u0163ional de Redresare \u015fi Rezilien\u0163\u0103 (PNRR) \u015fi deblocarea integral\u0103 a Cererii de Plat\u0103 3 sunt priorit\u0103\u0163i imediate pentru a asigura absorb\u0163ia maxim\u0103 a fondurilor europene alocate Rom\u00e2niei, sus\u0163ine ministrul Investi\u0163iilor \u015fi Proiectelor Europene, Marcel Bolo\u015f.<\/strong><\/p>\n<p>Ministrul Bolo\u0219 a participat luni, al\u0103turi de echipa tehnic\u0103 din cadrul ministerului de resort, la <a href=\"https:\/\/www.digi24.ro\/stiri\/economie\/reniune-la-guvern-cu-privire-la-cererile-de-plata-3-si-4-din-pnrr-predoiu-exista-discutii-pentru-modificarea-planului-3237309\" target=\"_blank\" rel=\"noopener\" data-skip-linkfix=\"1\">reuniunea de lucru a Comitetului Interministerial de Coordonare a PNRR, coordonat\u0103 de prim-ministrul interimar, C\u0103t\u0103lin Predoiu.<\/a><\/p>\n<p>Potrivit unui comunicat al MIPE, citat de Agerpres, discu\u0163iile din cadrul Comitetului Interministerial de Coordonare a PNRR au vizat punctual aspecte ce trebuie urgentate pentru deblocarea integral\u0103 a Cererii de plat\u0103 nr. 3, respectiv \u015fi pentru implementarea reformelor \u015fi investi\u0163iilor care urmeaz\u0103 a fi cuprinse \u00een Cererea de Plat\u0103 nr. 4, \u00een paralel cu finalizarea etapei de renegociere a PNRR.<\/p>\n<p>\u00cen cursul acestei s\u0103pt\u0103m\u00e2ni, o delega\u0163ie guvernamental\u0103 condus\u0103 de MIPE va merge la Bruxelles, pentru o serie de \u015fedin\u0163e tehnice cu reprezentan\u0163ii Comisiei Europene.<\/p>\n<p>P\u00e2n\u0103 \u00een prezent, au fost realizate o serie de analize comune cu reprezentan\u0163ii Executivului european, cu privire la stadiul de implementare al investi\u0163iilor, care au relevat pe de o parte necesitatea ajust\u0103rii unora dintre acestea, iar pe de alt\u0103 parte, necesitatea ini\u0163ierii unor m\u0103suri care s\u0103 asigure \u00eendeplinirea acestora \u00een termenele asumate de Rom\u00e2nia.<\/p>\n<p>\u201eCalendarul pe care \u00eel avem impune o succesiune clar\u0103: nu putem transmite Cererea de Plat\u0103 nr. 4 \u00eenainte de a finaliza renegocierea PNRR. Doar dup\u0103 aprobarea oficial\u0103 a planului modificat vom putea transmite Comisiei o nou\u0103 cerere de plat\u0103, \u00een forma sa restructurat\u0103, care s\u0103 includ\u0103 reformele \u015fi investi\u0163iile actualizate. Obiectivul nostru este depunerea Cererii de Plat\u0103 nr. 4 \u00een luna iulie, dar pentru aceasta este esen\u0163ial ca procesul de renegociere s\u0103 se \u00eencheie p\u00e2n\u0103 la finalul lunii mai. Succesul negocierilor \u015fi al implement\u0103rii PNRR depinde, \u00een mod esen\u0163ial, de colaborarea interinstitu\u0163ional\u0103 str\u00e2ns\u0103, de coeren\u0163a pozi\u0163iilor tehnice \u015fi de capacitatea de reac\u0163ie operativ\u0103 \u00een raport cu partenerii europeni. Renegocierea PNRR este deja \u00eentr-o etap\u0103 avansat\u0103, \u00een urma discu\u0163iilor intense care au fost deja purtate cu Comisia European\u0103. \u00cen aceast\u0103 s\u0103pt\u0103m\u00e2n\u0103, la Bruxelles, vom avea discu\u0163iile cu care ar trebui s\u0103 \u00eenchidem\u201d, a declarat ministrul Investi\u0163iilor \u015fi Proiectelor Europene, Marcel Bolo\u015f, \u00een comunicatul citat.<\/p>\n<p>\u00cen cazul Cererii de Plat\u0103 nr. 3, Comisia a considerat par\u0163ial \u00eendeplinite \u0163intele \u015fi jaloanele cuprinse \u00een aceasta \u015fi a aprobat o plat\u0103 par\u0163ial\u0103 \u00een valoare de 1,3 miliarde de euro. Aceast\u0103 sum\u0103 urmeaz\u0103 s\u0103 fie virat\u0103 \u0163\u0103rii noastre la sf\u00e2r\u015fitul acestei luni, se men\u0163ioneaz\u0103 \u00een comunicat.<\/p>\n<p>P\u00e2n\u0103 \u00een prezent Rom\u00e2nia a \u00eencasat 9,2 miliarde de euro din suma de 28,5 miliarde de euro de care dispune pentru implementarea PNRR. Din aceast\u0103 alocare, o sum\u0103 de 13,6 miliarde euro este acordat\u0103 sub form\u0103 de granturi \u015fi 14,9 miliarde euro sub form\u0103 de \u00eemprumuturi.<\/p>\n<p> Editor : <a href=\"https:\/\/www.digi24.ro\/autor\/bogdan-enache\"> B.E. <\/a><\/p>\n<\/div>\n<p> Source URL: https:\/\/www.digi24.ro\/stiri\/actualitate\/politica\/marcel-bolos-sustine-ca-esential-ca-renegocierea-pnrr-sa-se-incheie-pana-la-finalul-lunii-mai-3237515<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Renegocierea Planului Na\u0163ional de Redresare \u015fi Rezilien\u0163\u0103 (PNRR) \u015fi deblocarea integral\u0103 a Cererii de Plat\u0103 3 sunt priorit\u0103\u0163i imediate pentru a asigura absorb\u0163ia maxim\u0103 a fondurilor europene alocate Rom\u00e2niei, sus\u0163ine ministrul Investi\u0163iilor \u015fi Proiectelor Europene, Marcel Bolo\u015f. Ministrul Bolo\u0219 a participat luni, al\u0103turi de echipa tehnic\u0103 din cadrul ministerului de resort, la reuniunea de lucru [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":566990,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[11],"class_list":["post-566989","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-politics","tag-digi24"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/566989","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=566989"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/566989\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/media\/566990"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=566989"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=566989"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=566989"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}