{"id":2247773,"date":"2026-11-09T13:21:01","date_gmt":"2026-11-09T10:21:01","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=2247773"},"modified":"2026-11-09T13:21:01","modified_gmt":"2026-11-09T10:21:01","slug":"unitatea-2-de-la-cernavoda-repornita-zilele-urmatoare","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=2247773","title":{"rendered":"UNITATEA 2 DE LA CERNAVOD\u0102, REPORNIT\u0102 ZILELE URM\u0102TOARE"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/newss.ro\/wp-content\/uploads\/2026\/08\/centrala-Cernavoda-1068&#215;715-1.jpg&#8221;]<\/p>\n<div class=\"td-post-content\">\n<div class=\"td-post-featured-image\"><a href=\"https:\/\/newss.ro\/wp-content\/uploads\/2026\/08\/centrala-Cernavoda-1068x715-1.jpg\" data-caption><img loading=\"lazy\" decoding=\"async\" width=\"696\" height=\"466\" class=\"entry-thumb td-modal-image\" src=\"https:\/\/newss.ro\/wp-content\/uploads\/2026\/08\/centrala-Cernavoda-1068x715-1-696x466.jpg\" alt title=\"centrala-Cernavoda-1068x715\"><\/a><\/div>\n<p>Nuclearelectrica a \u00eenceput ast\u0103zi manevrele de repornire a Unit\u0103\u021bii 2 A Centralei de la Cernavod\u0103, ca urmare a atingerii nivelului necesar de ap\u0103 pentru repornirea acesteia \u00een condi\u021bii de siguran\u021b\u0103 maxim\u0103, cu respectarea tuturor m\u0103surilor de securitate nuclear\u0103, centrala urm\u00e2nd s\u0103 ating\u0103 miercuri puterea nominal\u0103.<\/p>\n<p>Potrivit unui comunicat al companiei, citat de Agerpres, sincronizarea Unit\u0103\u021bii 2 este estimat\u0103 pentru data de 10 noiembrie 2026.<\/p>\n<p>Astfel, \u00eencep\u00e2nd din data de 11 noiembrie 2026, CNE Cernavod\u0103 va opera ambele unit\u0103\u021bi nucleare, permi\u021b\u00e2nd astfel reasigurarea a aproximativ 20% din necesarul de energie al Rom\u00e2niei.<\/p>\n<p>Toate manevrele de repornire \u0219i reconectarea Unit\u0103\u021bii 2 CNE Cernavod\u0103 la Sistemul Energetic National se realizeaz\u0103 \u00een baza procedurilor aplicabile ale CNE Cernavod\u0103, \u00een condi\u021bii de siguran\u021b\u0103 \u0219i cu asumarea responsabilit\u0103\u021bii de c\u0103tre echipa Nuclearelectrica, precizeaz\u0103 compania.<\/p>\n<p>Unitatea 1 a CNE Cernavod\u0103 a fost oprit\u0103 controlat \u0219i deconectat\u0103 de la Sistemul Energetic Na\u021bional \u00een data de 28 iulie, pe fondul debitului sc\u0103zut al Dun\u0103rii. Ulterior, la jum\u0103tatea lunii august, a fost deconectat\u0103 \u0219i Unitatea 2.<\/p>\n<p>Luni la ora 11:20, Rom\u00e2nia avea o produc\u021bie de energie de 5877 MW \u0219i un consum de 6222 MW.<\/p>\n<p>\u00a0<\/p>\n<\/div>\n<div class=\"td-post-content\">\n<div class=\"td-post-featured-image\"><a href=\"https:\/\/newss.ro\/wp-content\/uploads\/2026\/08\/centrala-Cernavoda-1068x715-1.jpg\" data-caption><img loading=\"lazy\" decoding=\"async\" width=\"696\" height=\"466\" class=\"entry-thumb td-modal-image\" src=\"https:\/\/newss.ro\/wp-content\/uploads\/2026\/08\/centrala-Cernavoda-1068x715-1-696x466.jpg\" alt title=\"centrala-Cernavoda-1068x715\"><\/a><\/div>\n<p>Nuclearelectrica a \u00eenceput ast\u0103zi manevrele de repornire a Unit\u0103\u021bii 2 A Centralei de la Cernavod\u0103, ca urmare a atingerii nivelului necesar de ap\u0103 pentru repornirea acesteia \u00een condi\u021bii de siguran\u021b\u0103 maxim\u0103, cu respectarea tuturor m\u0103surilor de securitate nuclear\u0103, centrala urm\u00e2nd s\u0103 ating\u0103 miercuri puterea nominal\u0103.<\/p>\n<p>Potrivit unui comunicat al companiei, citat de Agerpres, sincronizarea Unit\u0103\u021bii 2 este estimat\u0103 pentru data de 10 noiembrie 2026.<\/p>\n<p>Astfel, \u00eencep\u00e2nd din data de 11 noiembrie 2026, CNE Cernavod\u0103 va opera ambele unit\u0103\u021bi nucleare, permi\u021b\u00e2nd astfel reasigurarea a aproximativ 20% din necesarul de energie al Rom\u00e2niei.<\/p>\n<p>Toate manevrele de repornire \u0219i reconectarea Unit\u0103\u021bii 2 CNE Cernavod\u0103 la Sistemul Energetic National se realizeaz\u0103 \u00een baza procedurilor aplicabile ale CNE Cernavod\u0103, \u00een condi\u021bii de siguran\u021b\u0103 \u0219i cu asumarea responsabilit\u0103\u021bii de c\u0103tre echipa Nuclearelectrica, precizeaz\u0103 compania.<\/p>\n<p>Unitatea 1 a CNE Cernavod\u0103 a fost oprit\u0103 controlat \u0219i deconectat\u0103 de la Sistemul Energetic Na\u021bional \u00een data de 28 iulie, pe fondul debitului sc\u0103zut al Dun\u0103rii. Ulterior, la jum\u0103tatea lunii august, a fost deconectat\u0103 \u0219i Unitatea 2.<\/p>\n<p>Luni la ora 11:20, Rom\u00e2nia avea o produc\u021bie de energie de 5877 MW \u0219i un consum de 6222 MW.<\/p>\n<p>\u00a0<\/p>\n<\/div>\n<p>[analyse_source url=&#8221;https:\/\/newss.ro\/2026\/11\/09\/unitatea-2-de-la-cernavoda-repornita-zilele-urmatoare\/&#8221;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/newss.ro\/wp-content\/uploads\/2026\/08\/centrala-Cernavoda-1068&#215;715-1.jpg&#8221;] Nuclearelectrica a \u00eenceput ast\u0103zi manevrele de repornire a Unit\u0103\u021bii 2 A Centralei de la Cernavod\u0103, ca urmare a atingerii nivelului necesar de ap\u0103 pentru repornirea acesteia \u00een condi\u021bii de siguran\u021b\u0103 maxim\u0103, cu respectarea tuturor m\u0103surilor de securitate nuclear\u0103, centrala urm\u00e2nd s\u0103 ating\u0103 miercuri puterea nominal\u0103. Potrivit unui comunicat al companiei, citat de [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[],"class_list":["post-2247773","post","type-post","status-publish","format-standard","hentry","category-politics"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2247773","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2247773"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2247773\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2247773"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2247773"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2247773"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}