{"id":2247214,"date":"2026-11-09T18:06:59","date_gmt":"2026-11-09T15:06:59","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=2247214"},"modified":"2026-11-09T18:06:59","modified_gmt":"2026-11-09T15:06:59","slug":"miruta-ii-raspunde-ministrului-transporturilor-sa-persisti-in-ridicol-ori-minciuna-e-ingrijorator-pentru","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=2247214","title":{"rendered":"Miru\u0163\u0103 \u00eei r\u0103spunde ministrului Transporturilor: S\u0103 persi\u0219ti \u00een ridicol ori minciun\u0103 e \u00eengrijor\u0103tor pentru&#8230;"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/s.iw.ro\/gateway\/g\/ZmlsZVNvdXJjZT1odHRwJTNBJTJGJTJG\/c3RvcmFnZTA4dHJhbnNjb2Rlci5yY3Mt\/cmRzLnJvJTJGc3RvcmFnZSUyRjIwMjYl\/MkYxMSUyRjA5JTJGMzA1ODkxMF8zMDU4\/OTEwX3JhZHUtbWlydXRhLWlucXVhbS1t\/YWxpbmEtbm9yb2NlYS5qcGcmdz0xMjAw\/Jmg9NjMwJnpjPTEmaGFzaD05Mzk0ZmVj\/YWZjZDQ1ZDk2NjA1Y2I4MWE0ZGVmY2Q1Yw==.thumb.jpg&#8221;]<\/p>\n<div class=\"entry data-app-meta data-app-meta-article\" data-embed-base-url-canonical=\"https:\/\/www.digi24.ro\/embed\/stiri\/actualitate\/politica\/miruta-ii-raspunde-ministrului-transporturilor-sa-persisti-in-ridicol-ori-minciuna-e-ingrijorator-pentru-un-minister-atat-de-important-4028629\">\n<p data-index=\"1\"><strong>Fostul ministru al Transporturilor Radu Miru\u0163\u0103 (USR) \u00eei r\u0103spunde actualului ministru \u015etefan Ovidiu Popa (PSD), care l-a acuzat luni c\u0103 tunelul Momaia de pe Autostrada Sibiu-Pite\u015fti (A1) nu va putea fi opera\u0163ionalizat \u00een urm\u0103toarea perioad\u0103, deoarece el <a href=\"https:\/\/www.digi24.ro\/stiri\/economie\/transporturi\/popa-spune-ca-tunelul-de-pe-a1-de-la-curtea-de-arges-nu-va-fi-deschis-predecesorii-mei-s-au-canalizat-pe-diferenta-momoa-momaia-4028355\" target=\"_blank\" rel=\"noopener\" data-skip-linkfix=\"1\">ar fi blocat angajarea personalului<\/a> care trebuie s\u0103 se ocupe de monitorizarea \u015fi interven\u0163ia de urgen\u0163\u0103 \u00een tunel. \u201eVerifica\u0163i \u00eenainte s\u0103 declara\u0163i o asemenea minciun\u0103, fiindc\u0103 sunt mul\u0163i \u00een acel minister care vor s\u0103 r\u00e2d\u0103 de dumneavoastr\u0103, chiar din echipa PSD\u201d, a transmis fostul ministru.<\/strong><\/p>\n<p data-index=\"2\">\u201eDomnule ministru Momoa, s\u0103 te faci de r\u00e2s o dat\u0103 poate avea leg\u0103tur\u0103 cu \u00eenceputul ori cu nepriceperea, dar s\u0103 persi\u0219ti s\u0103pt\u0103m\u00e2nal \u00een ridicol ori minciun\u0103 e \u00eengrijor\u0103tor pentru un minister at\u00e2t de important precum cel al Transporturilor. Sau&#8230; scuza \u0219i minciuna sunt doar programul dumneavoastr\u0103 de guvernare\u201d, a scris, luni sear\u0103, pe Facebook, fostul ministru de la Transporturi Radu Miru\u0163\u0103.<\/p>\n<p data-index=\"3\">\u201eAud c\u0103 v-a\u0163i c\u0103utat \u015fi ast\u0103zi scuze pentru neputin\u0163\u0103, acuz\u00e2nd c\u0103 tunelul Momaia de pe autostrada A1 nu poate fi dat \u00een circula\u0163ie pentru c\u0103 nu am aprobat eu angaj\u0103ri. Verifica\u0163i \u00eenainte s\u0103 declara\u0163i o asemenea minciun\u0103, fiindc\u0103 sunt mul\u0163i \u00een acel minister care vor s\u0103 r\u00e2d\u0103 de dumneavoastr\u0103, chiar din echipa PSD. Ei bine, uita\u0163i c\u0103 fix asta am aprobat\u201d, subliniaz\u0103 fostul ministru.<\/p>\n<p data-index=\"4\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-4028643\" src=\"https:\/\/s.iw.ro\/gateway\/g\/ZmlsZVNvdXJjZT1odHRwJTNBJTJGJTJG\/c3RvcmFnZTA4dHJhbnNjb2Rlci5yY3Mt\/cmRzLnJvJTJGc3RvcmFnZSUyRjIwMjYl\/MkYxMSUyRjA5JTJGMzA1ODg5N18zMDU4\/ODk3X2NhcHR1cmEtZG9jdW1lbnQucG5n\/Jnc9ODAwJmhhc2g9Y2YyMDFiZTI3YTQyNTE5YTNhN2JhYzZkMzcxOTJhZTc=.thumb.jpg\" alt width=\"507\" height=\"634\" data-skip-htmlfix=\"1\"><\/p>\n<p data-index=\"5\">Acesta adaug\u0103 c\u0103, \u00een mai 2026, CNAIR a cerut prin propunerea de buget aprobarea pentru 518 posturi, dintre care 126 la structura central\u0103.<\/p>\n<p data-index=\"6\">\u201ePe cele de la centru le-am refuzat, pentru c\u0103 o parte din proiecte trecuser\u0103 la CNIR, dar nu \u015fi angaja\u0163ii. Am aprobat \u00eens\u0103 posturile din structurile cu atribu\u0163ii opera\u0163ionale de administrare a drumurilor na\u0163ionale \u015fi autostr\u0103zilor. Adic\u0103 fix ce spune\u0163i c\u0103 n-am aprobat, c\u0103ut\u00e2nd aer pentru a v\u0103 scuza neputin\u0163a\u201d, arat\u0103 Radu Miru\u0163\u0103 \u00een postare.<\/p>\n<h2 id=\"highlight-4028629-1\">\u015etefan Ovidiu Popa spune c\u0103 circula\u0163ia \u00een tunel nu va fi deschis\u0103 prea cur\u00e2nd<\/h2>\n<p data-index=\"7\">\u201eScuza a expirat. Singurul lucru care mai lipse\u015fte ca s\u0103 deschide\u0163i autostrada e un ministru \u00een stare s-o deschid\u0103. Pe acela, din p\u0103cate, nu-l pot aproba eu\u201d, mai arat\u0103 Miru\u0163\u0103, care ata\u015feaz\u0103 \u015fi documentul transmis conducerii CNAIR \u00een luna iunie.<\/p>\n<p data-index=\"8\">Ministrul Transporturilor, \u015etefan Ovidiu Popa, a declarat, luni, \u00eentr-o conferin\u0163\u0103 de pres\u0103, c\u0103 circula\u0163ia \u00een tunel nu va fi deschis\u0103 prea cur\u00e2nd, f\u0103r\u0103 s\u0103 avanseze un termen \u00een acest sens, iar de vin\u0103 pentru \u00eent\u00e2rziere ar fi fostul ministru al Transporturilor Radu Miru\u0163\u0103, care a blocat angaj\u0103rile.<\/p>\n<p data-index=\"9\">Ministrul a fost \u00eentrebat dac\u0103 atunci c\u00e2nd a vorbit despre predecesorii s\u0103i de la minister care nu \u015fi-au f\u0103cut treaba s-a referit \u015fi la Sorin Grindeanu \u015fi Ciprian \u015eerban care au ocupat aceast\u0103 pozi\u0163ie.<\/p>\n<p data-index=\"10\">\u201eNu am f\u0103cut referire nici la domnul Grindeanu, nici la domnul \u015eerban, pentru c\u0103 exist\u0103 un memorandum pe care l-a \u00eenaintat domnul director Pistol \u015fi acel memorandum a fost blocat pentru c\u0103 domnul Miru\u0163\u0103 nu a vrut s\u0103 deblocheze aceast\u0103 situa\u0163ie\u201d, a r\u0103spuns ministrul Transporturilor.<\/p>\n<p data-index=\"11\">\u015etefan Ovidiu Popa a mai declarat, luni, c\u0103 au \u00eenceput deja discu\u0163iile pentru demararea concursurilor \u015fi angajarea etapizat\u0103 a oamenilor necesari care vor asigura sistemele \u015fi se vor ocupa de sistemele de interven\u0163ie \u00een tunel.<\/p>\n<h2 id=\"highlight-4028629-2\">\u201eLucr\u0103rile sunt gata\u201d<\/h2>\n<p data-index=\"12\">\u201e\u00cen acest moment, f\u0103r\u0103 oameni specializa\u0163i, nimeni nu \u00ee\u015fi poate asuma riscul s\u0103 deschid\u0103 circula\u0163ia. Vorbim deci de o \u00eent\u00e2rziere, nu putem estima momentan c\u00e2t va fi \u00eent\u00e2rzierea, dar cu siguran\u0163\u0103 va fi o \u00eent\u00e2rziere. Termenul contractual pentru finalizarea acestei sec\u0163iuni din autostrada Sibiu-Pite\u015fti, de la Tigveni p\u00e2n\u0103 la Curtea de Arge\u015f, este februarie 2027. Deci ne afl\u0103m \u00een perioada contractual\u0103. Lucr\u0103rile sunt gata, dar din p\u0103cate, neav\u00e2nd personal specializat pentru a opera\u0163ionaliza tunelul, va trebui s\u0103 mai am\u00e2n\u0103m deschiderea circula\u0163iei\u201d, a precizat ministrul Transporturilor.<\/p>\n<p data-index=\"13\">\u00cen 27 octombrie, ministrul Transporturilor, \u015etefan Ovidiu Popa, a declarat c\u0103 lotul 4 al autostr\u0103zii Sibiu-Pite\u015fti va fi dat \u00een circula\u0163ie \u00een noiembrie, afl\u00e2ndu-se la un stadiu de execu\u0163ie de 99,22%, iar pe celelalte dou\u0103 loturi se lucreaz\u0103 pe 45% din capacitatea \u015fantierului, din cauza acordului de mediu revizuit, care este blocat. El a anun\u0163at c\u0103 se va \u00eent\u00e2lni cu ministrul Mediului, Natalia Intotero, pentru discu\u0163ii despre acest blocaj.<\/p>\n<p data-index=\"14\">\u201e<a href=\"https:\/\/www.digi24.ro\/stiri\/economie\/transporturi\/gafa-a-ministrului-transporturilor-in-vizita-pe-santierul-autostrazii-sibiu-pitesti-am-fost-si-in-tunelul-momoa-4012749\" target=\"_blank\" rel=\"noopener\" data-skip-linkfix=\"1\">Am fost \u015fi \u00een tunelul Momoa<\/a> (n.r. &#8211; Momaia), care are o distan\u0163\u0103 de 1,35 de km, am v\u0103zut \u015fi toate sistemele de siguran\u0163\u0103. Sunt undeva \u00een jur de 2500 de sisteme de siguran\u0163\u0103, camere \u015fi senzori. Este un sistem complex, care va asigura traficul pe toat\u0103 perioada\u201d, spunea ministrul Transporturilor la acel moment.<\/p>\n<p class=\"gdpr-placeholder gdpr-social-media gdpr-iframe-fix\" data-index=\"16\"> Setarile tale privind cookie-urile nu permit afisarea continutul din aceasta sectiune. Poti actualiza setarile modulelor coookie direct din browser sau de <a class=\"ot-sdk-show-settings\" data-skip-linkfix=\"1\">aici<\/a> \u2013 e nevoie sa accepti cookie-urile social media<\/p>\n<p> Editor : <a href=\"https:\/\/www.digi24.ro\/autor\/liviu-cojan\"> Liviu Cojan <\/a><\/p>\n<\/div>\n<p>[analyse_source url=&#8221;https:\/\/www.digi24.ro\/stiri\/actualitate\/politica\/miruta-ii-raspunde-ministrului-transporturilor-sa-persisti-in-ridicol-ori-minciuna-e-ingrijorator-pentru-un-minister-atat-de-important-4028629&#8243;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/s.iw.ro\/gateway\/g\/ZmlsZVNvdXJjZT1odHRwJTNBJTJGJTJG\/c3RvcmFnZTA4dHJhbnNjb2Rlci5yY3Mt\/cmRzLnJvJTJGc3RvcmFnZSUyRjIwMjYl\/MkYxMSUyRjA5JTJGMzA1ODkxMF8zMDU4\/OTEwX3JhZHUtbWlydXRhLWlucXVhbS1t\/YWxpbmEtbm9yb2NlYS5qcGcmdz0xMjAw\/Jmg9NjMwJnpjPTEmaGFzaD05Mzk0ZmVj\/YWZjZDQ1ZDk2NjA1Y2I4MWE0ZGVmY2Q1Yw==.thumb.jpg&#8221;] Fostul ministru al Transporturilor Radu Miru\u0163\u0103 (USR) \u00eei r\u0103spunde actualului ministru \u015etefan Ovidiu Popa (PSD), care l-a acuzat luni c\u0103 tunelul Momaia de pe Autostrada Sibiu-Pite\u015fti (A1) nu va putea fi opera\u0163ionalizat \u00een urm\u0103toarea perioad\u0103, deoarece el ar fi blocat angajarea personalului care trebuie s\u0103 se ocupe de monitorizarea \u015fi interven\u0163ia de [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[11],"class_list":["post-2247214","post","type-post","status-publish","format-standard","hentry","category-romania","tag-digi24"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2247214","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2247214"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2247214\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2247214"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2247214"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2247214"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}