{"id":2247201,"date":"2026-11-09T00:00:00","date_gmt":"2026-11-08T21:00:00","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=2247201"},"modified":"2026-11-09T00:00:00","modified_gmt":"2026-11-08T21:00:00","slug":"ministerul-energiei-monitorizeaza-situatia-de-la-cernavoda-dupa-deconectarea-unitatii-1-de-la-sistemul-energetic-national","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=2247201","title":{"rendered":"Ministerul Energiei monitorizeaz\u0103 situa\u021bia de la Cernavod\u0103, dup\u0103 deconectarea Unit\u0103\u021bii 1 de la Sistemul Energetic Na\u021bional"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/agerpres.ro\/data\/202611\/20261109205319_503261.jpg&#8221;]<\/p>\n<div class=\"mx-auto pt-3\">\n<p><strong>Ministerul Energiei monitorizeaz\u0103 permanent situa\u021bia de la Centrala Nuclearoelectric\u0103 (CNE) Cernavod\u0103, dup\u0103 <a href=\"https:\/\/agerpres.ro\/economic\/2026\/11\/09\/unitatea-1-de-la-cernavoda-a-fost-deconectata-luni-seara-de-la-sistemul-energetic-national-din-cauza--1611658\" target=\"_blank\">deconectarea Unit\u0103\u021bii 1 de la Sistemul Energetic Na\u021bional (SEN)<\/a>, \u00een urma unei defec\u021biuni la partea clasic\u0103, nenuclear\u0103, a unit\u0103\u021bii, a anun\u021bat luni institu\u021bia.<\/strong><\/p>\n<p>Ministrul de resort, Dumitru Chis\u0103li\u021b\u0103, se afl\u0103 \u00een contact direct \u0219i permanent cu conducerea Societ\u0103\u021bii Na\u021bionale Nuclearelectrica, pentru urm\u0103rirea evolu\u021biei situa\u021biei \u0219i a m\u0103surilor tehnice necesare.<\/p>\n<p>Potrivit ministerului, incidentul nu are impact asupra securit\u0103\u021bii nucleare, a personalului centralei sau a mediului \u00eenconjur\u0103tor.<\/p>\n<p>&#8221;Echipele tehnice ale CNE Cernavod\u0103 lucreaz\u0103 la remedierea defec\u021biunii \u0219i desf\u0103\u0219oar\u0103, \u00een paralel, lucr\u0103rile necesare pornirii Unit\u0103\u021bilor 1 \u0219i 2. Procedurile de repunere \u00een func\u021biune \u0219i reconectare la Sistemul Energetic Na\u021bional vor continua \u00een perioada urm\u0103toare, cu respectarea procedurilor de operare \u0219i a cerin\u021belor de securitate nuclear\u0103&#8221;, au transmis reprezentan\u021bii institu\u021biei \u00een comunicat.<\/p>\n<p>De asemenea, Ministerul Energiei men\u021bine leg\u0103tura cu operatorul centralei \u0219i urm\u0103re\u0219te evolu\u021bia lucr\u0103rilor p\u00e2n\u0103 la restabilirea func\u021bion\u0103rii unit\u0103\u021bilor.<\/p>\n<p>\u00centr-un comunicat transmis anterior, Nuclearelectrica a precizat c\u0103 \u00een urma acestui incident vor fi luate m\u0103suri la nivelul managementului tehnic al centralei, iar acesta urmeaz\u0103 s\u0103 fie \u00eenlocuit \u00eencep\u00e2nd cu data 1 decembrie 2026.<\/p>\n<p>&#8221;Vor fi luate m\u0103suri la nivelul managementului tehnic al centralei care are \u00een responsabilitate asigurarea disponibilit\u0103\u021bii echipamentelor necesare oper\u0103rii Unit\u0103\u021bii 1 CNE Cernavod\u0103. Astfel, \u00eencep\u00e2nd cu data 01.12.2026, Directorul Tehnic al CNE Cernavod\u0103 va fi \u00eenlocuit. Cauza de profunzime va face subiectul unui raport ulterior&#8221;, a transmis Nuclearelectrica \u00een informarea semnat\u0103 de directorul general al societ\u0103\u021bii, Mihai Lauren\u021biu Gioar\u0103.<\/p>\n<p>Unitatea 1 a CNE Cernavod\u0103 a fost oprit\u0103 controlat \u0219i deconectat\u0103 de la Sistemul Energetic Na\u021bional \u00een data de 28 iulie, pe fondul debitului sc\u0103zut al Dun\u0103rii. Ulterior, la jum\u0103tatea lunii august, a fost deconectat\u0103 \u0219i Unitatea 2. Cele dou\u0103 unit\u0103\u021bi ale Centralei de la Cernavod\u0103 asigurau aproximativ 20% din energia dispecerizabil\u0103.<\/p>\n<p>Vineri dup\u0103-amiaza, <a href=\"https:\/\/agerpres.ro\/2026\/11\/06\/unitatea-1-de-la-cernavoda-ar-urma-sa-fie-resincronizata-vineri-la-sistemul-energetic-national--1610686\" target=\"_blank\">Unitatea 1 a centralei de la Cernavod\u0103 a fost resincronizat\u0103 la Sistemul Energetic Na\u021bional<\/a>. AGERPRES\/(AS &#8211; editor: Mariana Nica, editor online: Gabriela Badea)\u00a0<\/p>\n<\/div>\n<div class=\"mx-auto pt-3\">\n                                Afisari: 275\n                            <\/div>\n<p>[analyse_source url=&#8221;https:\/\/agerpres.ro\/economic\/2026\/11\/09\/ministerul-energiei-monitorizeaza-situatia-de-la-cernavoda-dupa-deconectarea-unitatii-1-de-la-sistem&#8211;1611661&#8243;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/agerpres.ro\/data\/202611\/20261109205319_503261.jpg&#8221;] Ministerul Energiei monitorizeaz\u0103 permanent situa\u021bia de la Centrala Nuclearoelectric\u0103 (CNE) Cernavod\u0103, dup\u0103 deconectarea Unit\u0103\u021bii 1 de la Sistemul Energetic Na\u021bional (SEN), \u00een urma unei defec\u021biuni la partea clasic\u0103, nenuclear\u0103, a unit\u0103\u021bii, a anun\u021bat luni institu\u021bia. Ministrul de resort, Dumitru Chis\u0103li\u021b\u0103, se afl\u0103 \u00een contact direct \u0219i permanent cu conducerea Societ\u0103\u021bii Na\u021bionale Nuclearelectrica, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[],"class_list":["post-2247201","post","type-post","status-publish","format-standard","hentry","category-politics"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2247201","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2247201"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2247201\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2247201"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2247201"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2247201"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}