{"id":2246111,"date":"2026-11-08T10:19:13","date_gmt":"2026-11-08T07:19:13","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=2246111"},"modified":"2026-11-08T10:19:13","modified_gmt":"2026-11-08T07:19:13","slug":"milioane-de-euro-pentru-mihaesti-de-la-asfalt-si-utilaje-pana-la-parcuri-si-iluminat","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=2246111","title":{"rendered":"Milioane de euro pentru Mih\u0103e\u0219ti, de la asfalt \u0219i utilaje p\u00e2n\u0103 la parcuri \u0219i iluminat"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/www.impactreal.ro\/wp-content\/uploads\/2026\/11\/mihaesti_primar_utilaje-1.jpg&#8221;]<\/p>\n<div class=\"single-news-content\">\n<div class=\"news-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1800\" height=\"1000\" src=\"https:\/\/www.impactreal.ro\/wp-content\/uploads\/2026\/11\/mihaesti_primar_utilaje-1.jpg\" class=\"img-responsive wp-post-image\" alt=\"Milioane de euro pentru Mih\u0103e\u0219ti, de la asfalt \u0219i utilaje p\u00e2n\u0103 la parcuri \u0219i iluminat\"><\/div>\n<div class=\"news-detail clearfix\">\n<div class=\"entry-meta\"><span class=\"posted-date\"><a href=\"https:\/\/www.impactreal.ro\/2026\/11\/08\/milioane-de-euro-pentru-mihaesti-de-la-asfalt-si-utilaje-pana-la-parcuri-si-iluminat\/\" rel=\"bookmark\"><time class=\"entry-date published\" datetime=\"2026-11-08T12:19:13+02:00\">8 noiembrie 2026<\/time><time class=\"updated\" datetime=\"2026-11-08T12:19:40+02:00\">8 noiembrie 2026<\/time><\/a><\/span><span class=\"author vcard\"><a href=\"https:\/\/www.impactreal.ro\/author\/claudia-schiopu\/\">Claudia Schiopu<\/a><\/span><span class=\"cat-links\"><a href=\"https:\/\/www.impactreal.ro\/category\/administratie\/\" rel=\"category tag\">Administra\u0163ie<\/a><a href=\"https:\/\/www.impactreal.ro\/category\/mihaesti\/\" rel=\"category tag\">Mihaesti<\/a><\/span><\/div>\n<div class=\"news-content editor-content-entry\">\n<p><em>La Mih\u0103e\u0219ti se apropie de \u00eencheiere lucr\u0103rile la trotuarele \u0219i pista de biciclete din Stup\u0103rei, se amenajeaz\u0103 un parc l\u00e2ng\u0103 sala de sport \u0219i au \u00eenceput s\u0103 soseasc\u0103 utilajele cump\u0103rate printr-o nou\u0103 finan\u021bare. Acestora li se adaug\u0103 dou\u0103 proiecte pentru iluminatul stradal, prin care vor fi montate 250 de l\u0103mpi economice<\/em>:<\/p>\n<p>**********************************************************************************************<\/p>\n<p><strong><u>Au sosit utilajele<\/u><\/strong><\/p>\n<p>Prim\u0103ria Mih\u0103e\u0219ti a primit un tractor \u0219i a\u0219teapt\u0103 s\u0103 fie adus \u0219i un \u00eenc\u0103rc\u0103tor frontal, cump\u0103rate printr-un proiect pentru gestionarea gunoiului de grajd. Finan\u021barea continu\u0103 investi\u021bia realizat\u0103 \u00een 2011, c\u00e2nd \u00een satul Stup\u0103rei a fost construit\u0103 platforma comunal\u0103:<\/p>\n<p>\u201e<strong><em>M\u0103 bucur c\u0103 au \u00eenceput s\u0103 vin\u0103 utilajele. Am primit un tractor \u0219i mai trebuie s\u0103 ne vin\u0103 un \u00eenc\u0103rc\u0103tor frontal\u201d,<\/em><\/strong> ne-a declarat primarul comunei Mih\u0103e\u0219ti, Constantin B\u0103rz\u0103geanu.<\/p>\n<p>Noul proiect, estimat la aproximativ 400.000 de euro, cuprinde at\u00e2t cump\u0103rarea utilajelor pentru platforma comunal\u0103, c\u00e2t \u0219i achizi\u021bia unor platforme individuale pentru gospod\u0103rii. Astfel, la 15 ani de la prima investi\u021bie, prim\u0103ria a ob\u021binut o nou\u0103 finan\u021bare pentru dot\u0103rile necesare colect\u0103rii \u0219i transportului gunoiului de grajd.<\/p>\n<p>Platforma de la Stup\u0103rei a fost construit\u0103 cu finan\u021bare de la Banca Mondial\u0103, dup\u0103 ce protestele unor locuitori din Arsanca au dus la schimbarea terenului ales ini\u021bial. Tot atunci au fost cump\u0103rate dou\u0103 tractoare, un \u00eenc\u0103rc\u0103tor \u0219i patru remorci, pe care noile achizi\u021bii le vor completa.<\/p>\n<p><strong><u>Un parc \u00een centrul comunei<\/u><\/strong><\/p>\n<p>Pe l\u00e2ng\u0103 aceste dot\u0103ri, prim\u0103ria a cump\u0103rat prin GAL o ma\u0219in\u0103 pentru m\u0103turatul str\u0103zilor \u0219i a amenajat un loc de joac\u0103 \u00een zona Negreni. Acum, lucr\u0103rile continu\u0103 cu un alt parc, \u00een centrul comunei, \u00een fa\u021ba s\u0103lii de sport.<\/p>\n<p>Aici, terenul este suficient de mare pentru amenajarea unui teatru de var\u0103 \u0219i a unor foi\u0219oare, al\u0103turi de care va fi a\u0219ezat mobilier de parc.<\/p>\n<p><strong><u>Lucr\u0103rile de la Stup\u0103rei, aproape gata<\/u><\/strong><\/p>\n<p>La Stup\u0103rei, muncitorii mai au de amenajat aproximativ 500 de metri de trotuare \u0219i pist\u0103 pentru biciclete, de-a lungul DN64. Lucrarea valoreaz\u0103 aproximativ 960.000 de euro \u0219i este finan\u021bat\u0103 prin Programul \u201eAnghel Saligny\u201d, din care comuna a primit \u0219i aproximativ 2,7 milioane de euro pentru asfaltarea drumurilor.<\/p>\n<p>Potrivit primarului, odat\u0103 cu terminarea tronsonului de la Stup\u0103rei vor fi \u00eencheiate ambele proiecte. Constantin B\u0103rz\u0103geanu se declar\u0103 mul\u021bumit de constructor \u0219i de felul \u00een care se desf\u0103\u0219oar\u0103 lucr\u0103rile r\u0103mase.<img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-59870\" src=\"https:\/\/www.impactreal.ro\/wp-content\/uploads\/2026\/11\/mihaesti-05-300x225.jpg\" alt width=\"300\" height=\"225\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-59871\" src=\"https:\/\/www.impactreal.ro\/wp-content\/uploads\/2026\/11\/mihaesti-06-300x225.jpg\" alt width=\"300\" height=\"225\"><img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-medium wp-image-59872\" src=\"https:\/\/www.impactreal.ro\/wp-content\/uploads\/2026\/11\/mihaesti-07-300x225.jpg\" alt width=\"300\" height=\"225\"><img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-medium wp-image-59873\" src=\"https:\/\/www.impactreal.ro\/wp-content\/uploads\/2026\/11\/mihaesti-09-300x225.jpg\" alt width=\"300\" height=\"225\"><img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-medium wp-image-59874\" src=\"https:\/\/www.impactreal.ro\/wp-content\/uploads\/2026\/11\/mihaesti-014-300x225.jpg\" alt width=\"300\" height=\"225\"><\/p>\n<p>Prim\u0103ria preg\u0103te\u0219te modernizarea \u00a0iluminatului stradal, pentru care a ob\u021binut dou\u0103 finan\u021b\u0103ri prin Administra\u021bia Fondului pentru Mediu. Fiecare proiect prevede montarea a 125 de l\u0103mpi economice, astfel c\u0103, \u00een total, pe str\u0103zile comunei vor fi instalate 250 de l\u0103mpi noi.<\/p>\n<p>\u00a0<\/p>\n<p>\u00a0<\/p>\n<p>\u00a0<\/p>\n<p>\u00a0<\/p>\n<p>\u00a0<\/p>\n<p>\u00a0<\/p>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"news-content editor-content-entry\">\n<p><em>La Mih\u0103e\u0219ti se apropie de \u00eencheiere lucr\u0103rile la trotuarele \u0219i pista de biciclete din Stup\u0103rei, se amenajeaz\u0103 un parc l\u00e2ng\u0103 sala de sport \u0219i au \u00eenceput s\u0103 soseasc\u0103 utilajele cump\u0103rate printr-o nou\u0103 finan\u021bare. Acestora li se adaug\u0103 dou\u0103 proiecte pentru iluminatul stradal, prin care vor fi montate 250 de l\u0103mpi economice<\/em>:<\/p>\n<p>**********************************************************************************************<\/p>\n<p><strong><u>Au sosit utilajele<\/u><\/strong><\/p>\n<p>Prim\u0103ria Mih\u0103e\u0219ti a primit un tractor \u0219i a\u0219teapt\u0103 s\u0103 fie adus \u0219i un \u00eenc\u0103rc\u0103tor frontal, cump\u0103rate printr-un proiect pentru gestionarea gunoiului de grajd. Finan\u021barea continu\u0103 investi\u021bia realizat\u0103 \u00een 2011, c\u00e2nd \u00een satul Stup\u0103rei a fost construit\u0103 platforma comunal\u0103:<\/p>\n<p>\u201e<strong><em>M\u0103 bucur c\u0103 au \u00eenceput s\u0103 vin\u0103 utilajele. Am primit un tractor \u0219i mai trebuie s\u0103 ne vin\u0103 un \u00eenc\u0103rc\u0103tor frontal\u201d,<\/em><\/strong> ne-a declarat primarul comunei Mih\u0103e\u0219ti, Constantin B\u0103rz\u0103geanu.<\/p>\n<p>Noul proiect, estimat la aproximativ 400.000 de euro, cuprinde at\u00e2t cump\u0103rarea utilajelor pentru platforma comunal\u0103, c\u00e2t \u0219i achizi\u021bia unor platforme individuale pentru gospod\u0103rii. Astfel, la 15 ani de la prima investi\u021bie, prim\u0103ria a ob\u021binut o nou\u0103 finan\u021bare pentru dot\u0103rile necesare colect\u0103rii \u0219i transportului gunoiului de grajd.<\/p>\n<p>Platforma de la Stup\u0103rei a fost construit\u0103 cu finan\u021bare de la Banca Mondial\u0103, dup\u0103 ce protestele unor locuitori din Arsanca au dus la schimbarea terenului ales ini\u021bial. Tot atunci au fost cump\u0103rate dou\u0103 tractoare, un \u00eenc\u0103rc\u0103tor \u0219i patru remorci, pe care noile achizi\u021bii le vor completa.<\/p>\n<p><strong><u>Un parc \u00een centrul comunei<\/u><\/strong><\/p>\n<p>Pe l\u00e2ng\u0103 aceste dot\u0103ri, prim\u0103ria a cump\u0103rat prin GAL o ma\u0219in\u0103 pentru m\u0103turatul str\u0103zilor \u0219i a amenajat un loc de joac\u0103 \u00een zona Negreni. Acum, lucr\u0103rile continu\u0103 cu un alt parc, \u00een centrul comunei, \u00een fa\u021ba s\u0103lii de sport.<\/p>\n<p>Aici, terenul este suficient de mare pentru amenajarea unui teatru de var\u0103 \u0219i a unor foi\u0219oare, al\u0103turi de care va fi a\u0219ezat mobilier de parc.<\/p>\n<p><strong><u>Lucr\u0103rile de la Stup\u0103rei, aproape gata<\/u><\/strong><\/p>\n<p>La Stup\u0103rei, muncitorii mai au de amenajat aproximativ 500 de metri de trotuare \u0219i pist\u0103 pentru biciclete, de-a lungul DN64. Lucrarea valoreaz\u0103 aproximativ 960.000 de euro \u0219i este finan\u021bat\u0103 prin Programul \u201eAnghel Saligny\u201d, din care comuna a primit \u0219i aproximativ 2,7 milioane de euro pentru asfaltarea drumurilor.<\/p>\n<p>Potrivit primarului, odat\u0103 cu terminarea tronsonului de la Stup\u0103rei vor fi \u00eencheiate ambele proiecte. Constantin B\u0103rz\u0103geanu se declar\u0103 mul\u021bumit de constructor \u0219i de felul \u00een care se desf\u0103\u0219oar\u0103 lucr\u0103rile r\u0103mase.<img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-59870\" src=\"https:\/\/www.impactreal.ro\/wp-content\/uploads\/2026\/11\/mihaesti-05-300x225.jpg\" alt width=\"300\" height=\"225\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-59871\" src=\"https:\/\/www.impactreal.ro\/wp-content\/uploads\/2026\/11\/mihaesti-06-300x225.jpg\" alt width=\"300\" height=\"225\"><img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-medium wp-image-59872\" src=\"https:\/\/www.impactreal.ro\/wp-content\/uploads\/2026\/11\/mihaesti-07-300x225.jpg\" alt width=\"300\" height=\"225\"><img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-medium wp-image-59873\" src=\"https:\/\/www.impactreal.ro\/wp-content\/uploads\/2026\/11\/mihaesti-09-300x225.jpg\" alt width=\"300\" height=\"225\"><img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-medium wp-image-59874\" src=\"https:\/\/www.impactreal.ro\/wp-content\/uploads\/2026\/11\/mihaesti-014-300x225.jpg\" alt width=\"300\" height=\"225\"><\/p>\n<p>Prim\u0103ria preg\u0103te\u0219te modernizarea \u00a0iluminatului stradal, pentru care a ob\u021binut dou\u0103 finan\u021b\u0103ri prin Administra\u021bia Fondului pentru Mediu. Fiecare proiect prevede montarea a 125 de l\u0103mpi economice, astfel c\u0103, \u00een total, pe str\u0103zile comunei vor fi instalate 250 de l\u0103mpi noi.<\/p>\n<p>\u00a0<\/p>\n<p>\u00a0<\/p>\n<p>\u00a0<\/p>\n<p>\u00a0<\/p>\n<p>\u00a0<\/p>\n<p>\u00a0<\/p>\n<\/div>\n<div class=\"news-content editor-content-entry\">\n<p><em>La Mih\u0103e\u0219ti se apropie de \u00eencheiere lucr\u0103rile la trotuarele \u0219i pista de biciclete din Stup\u0103rei, se amenajeaz\u0103 un parc l\u00e2ng\u0103 sala de sport \u0219i au \u00eenceput s\u0103 soseasc\u0103 utilajele cump\u0103rate printr-o nou\u0103 finan\u021bare. Acestora li se adaug\u0103 dou\u0103 proiecte pentru iluminatul stradal, prin care vor fi montate 250 de l\u0103mpi economice<\/em>:<\/p>\n<p>**********************************************************************************************<\/p>\n<p><strong><u>Au sosit utilajele<\/u><\/strong><\/p>\n<p>Prim\u0103ria Mih\u0103e\u0219ti a primit un tractor \u0219i a\u0219teapt\u0103 s\u0103 fie adus \u0219i un \u00eenc\u0103rc\u0103tor frontal, cump\u0103rate printr-un proiect pentru gestionarea gunoiului de grajd. Finan\u021barea continu\u0103 investi\u021bia realizat\u0103 \u00een 2011, c\u00e2nd \u00een satul Stup\u0103rei a fost construit\u0103 platforma comunal\u0103:<\/p>\n<p>\u201e<strong><em>M\u0103 bucur c\u0103 au \u00eenceput s\u0103 vin\u0103 utilajele. Am primit un tractor \u0219i mai trebuie s\u0103 ne vin\u0103 un \u00eenc\u0103rc\u0103tor frontal\u201d,<\/em><\/strong> ne-a declarat primarul comunei Mih\u0103e\u0219ti, Constantin B\u0103rz\u0103geanu.<\/p>\n<p>Noul proiect, estimat la aproximativ 400.000 de euro, cuprinde at\u00e2t cump\u0103rarea utilajelor pentru platforma comunal\u0103, c\u00e2t \u0219i achizi\u021bia unor platforme individuale pentru gospod\u0103rii. Astfel, la 15 ani de la prima investi\u021bie, prim\u0103ria a ob\u021binut o nou\u0103 finan\u021bare pentru dot\u0103rile necesare colect\u0103rii \u0219i transportului gunoiului de grajd.<\/p>\n<p>Platforma de la Stup\u0103rei a fost construit\u0103 cu finan\u021bare de la Banca Mondial\u0103, dup\u0103 ce protestele unor locuitori din Arsanca au dus la schimbarea terenului ales ini\u021bial. Tot atunci au fost cump\u0103rate dou\u0103 tractoare, un \u00eenc\u0103rc\u0103tor \u0219i patru remorci, pe care noile achizi\u021bii le vor completa.<\/p>\n<p><strong><u>Un parc \u00een centrul comunei<\/u><\/strong><\/p>\n<p>Pe l\u00e2ng\u0103 aceste dot\u0103ri, prim\u0103ria a cump\u0103rat prin GAL o ma\u0219in\u0103 pentru m\u0103turatul str\u0103zilor \u0219i a amenajat un loc de joac\u0103 \u00een zona Negreni. Acum, lucr\u0103rile continu\u0103 cu un alt parc, \u00een centrul comunei, \u00een fa\u021ba s\u0103lii de sport.<\/p>\n<p>Aici, terenul este suficient de mare pentru amenajarea unui teatru de var\u0103 \u0219i a unor foi\u0219oare, al\u0103turi de care va fi a\u0219ezat mobilier de parc.<\/p>\n<p><strong><u>Lucr\u0103rile de la Stup\u0103rei, aproape gata<\/u><\/strong><\/p>\n<p>La Stup\u0103rei, muncitorii mai au de amenajat aproximativ 500 de metri de trotuare \u0219i pist\u0103 pentru biciclete, de-a lungul DN64. Lucrarea valoreaz\u0103 aproximativ 960.000 de euro \u0219i este finan\u021bat\u0103 prin Programul \u201eAnghel Saligny\u201d, din care comuna a primit \u0219i aproximativ 2,7 milioane de euro pentru asfaltarea drumurilor.<\/p>\n<p>Potrivit primarului, odat\u0103 cu terminarea tronsonului de la Stup\u0103rei vor fi \u00eencheiate ambele proiecte. Constantin B\u0103rz\u0103geanu se declar\u0103 mul\u021bumit de constructor \u0219i de felul \u00een care se desf\u0103\u0219oar\u0103 lucr\u0103rile r\u0103mase.<img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-59870\" src=\"https:\/\/www.impactreal.ro\/wp-content\/uploads\/2026\/11\/mihaesti-05-300x225.jpg\" alt width=\"300\" height=\"225\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-59871\" src=\"https:\/\/www.impactreal.ro\/wp-content\/uploads\/2026\/11\/mihaesti-06-300x225.jpg\" alt width=\"300\" height=\"225\"><img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-medium wp-image-59872\" src=\"https:\/\/www.impactreal.ro\/wp-content\/uploads\/2026\/11\/mihaesti-07-300x225.jpg\" alt width=\"300\" height=\"225\"><img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-medium wp-image-59873\" src=\"https:\/\/www.impactreal.ro\/wp-content\/uploads\/2026\/11\/mihaesti-09-300x225.jpg\" alt width=\"300\" height=\"225\"><img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-medium wp-image-59874\" src=\"https:\/\/www.impactreal.ro\/wp-content\/uploads\/2026\/11\/mihaesti-014-300x225.jpg\" alt width=\"300\" height=\"225\"><\/p>\n<p>Prim\u0103ria preg\u0103te\u0219te modernizarea \u00a0iluminatului stradal, pentru care a ob\u021binut dou\u0103 finan\u021b\u0103ri prin Administra\u021bia Fondului pentru Mediu. Fiecare proiect prevede montarea a 125 de l\u0103mpi economice, astfel c\u0103, \u00een total, pe str\u0103zile comunei vor fi instalate 250 de l\u0103mpi noi.<\/p>\n<p>\u00a0<\/p>\n<p>\u00a0<\/p>\n<p>\u00a0<\/p>\n<p>\u00a0<\/p>\n<p>\u00a0<\/p>\n<p>\u00a0<\/p>\n<\/div>\n<p>[analyse_source url=&#8221;https:\/\/www.impactreal.ro\/2026\/11\/08\/milioane-de-euro-pentru-mihaesti-de-la-asfalt-si-utilaje-pana-la-parcuri-si-iluminat\/&#8221;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/www.impactreal.ro\/wp-content\/uploads\/2026\/11\/mihaesti_primar_utilaje-1.jpg&#8221;] 8 noiembrie 20268 noiembrie 2026Claudia SchiopuAdministra\u0163ieMihaesti La Mih\u0103e\u0219ti se apropie de \u00eencheiere lucr\u0103rile la trotuarele \u0219i pista de biciclete din Stup\u0103rei, se amenajeaz\u0103 un parc l\u00e2ng\u0103 sala de sport \u0219i au \u00eenceput s\u0103 soseasc\u0103 utilajele cump\u0103rate printr-o nou\u0103 finan\u021bare. Acestora li se adaug\u0103 dou\u0103 proiecte pentru iluminatul stradal, prin care vor fi [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[],"class_list":["post-2246111","post","type-post","status-publish","format-standard","hentry","category-romania"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2246111","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2246111"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2246111\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2246111"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2246111"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2246111"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}