{"id":2209191,"date":"2026-10-20T11:27:03","date_gmt":"2026-10-20T08:27:03","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=2209191"},"modified":"2026-10-20T11:27:03","modified_gmt":"2026-10-20T08:27:03","slug":"lucrarile-la-linia-electrica-aeriana-suceava-balti-care-leaga-retelele-romaniei-si-rep-moldova","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=2209191","title":{"rendered":"Lucr\u0103rile la Linia Electric\u0103 Aerian\u0103 Suceava \u2013 B\u0103l\u0163i, care leag\u0103 re\u0163elele Rom\u00e2niei \u015fi Rep.Moldova,"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/storage0.dms.mpinteractiv.ro\/media\/1\/1481\/21330\/23263954\/1\/2850876-publimedia-shutterstock-1.jpghttps:\/\/storage0.dms.mpinteractiv.ro\/media\/1\/1481\/21330\/23263954\/1\/2850876-publimedia-shutterstock-1.jpg&#8221;]<\/p>\n<div class=\"text-content\">\n<p> Lucr\u00e3rile pentru construirea Liniei Electrice Aeriene 400 kV Suceava \u2013 B\u00e3l\u0163i, pe teritoriul Rom\u00e2niei, ar putea fi demarate cel t\u00e2rziu la \u00eenceputul anului 2027, a anun\u0163at mar\u0163i Transelectrica, proiectul incluz\u00e2nd \u015fi prima sta\u0163ie electric\u0103 de transformare din jude\u0163ul Boto\u015fani.<\/p>\n<p> LEA 400 kV Suceava \u2013 B\u00e3l\u0163i reprezint\u00e3 un proiect strategic pentru consolidarea infrastructurii de transport al energiei electrice a Rom\u00e2niei \u015fi dezvoltarea interconexiunilor regionale. Investi\u0163ia va conecta sistemele electroenergetice ale Rom\u00e2niei \u015fi Republicii Moldova, va consolida integrarea Republicii Moldova \u00een re\u0163eaua european\u00e3 ENTSO-E \u015fi va contribui la \u00eenchiderea inelului na\u0163ional de 400 kV al Re\u0163elei Electrice de transport na\u0163ionale.<\/p>\n<p> Pe teritoriul Rom\u00e2niei, linia va avea o lungime de 93,3 kilometri \u015fi va traversa 17 localit\u0103\u0163i, dintre care \u015fase \u00een jude\u0163ul Suceava \u015fi 11 \u00een jude\u0163ul Boto\u015fani.<\/p>\n<div class=\"int-widget-container\" data-channel-id=\"6a7d7d3c65d3cf457c0b4775\" data-publisher-id=\"6a7d78a072984466fe0e9897\">\n\u00a0<\/div>\n<div>\n<div><span>Te-ar putea interesa \u0219i:<\/span><\/div>\n<\/div>\n<p> Investi\u0163ia are o valoare de 133,4 milioane de lei f\u00e3r\u00e3 TVA, iar contractul de proiectare \u015fi execu\u0163ie a fost semnat la 11 martie 2025 cu Asocierea Electromontaj SA \u2013 ELM Electromontaj Cluj SA, lider de asociere Electromontaj SA.<\/p>\n<p> Durata de execu\u0163ie este de 36 de luni, calculat\u00e3 potrivit prevederilor contractuale \u015fi etapelor de implementare a proiectului.<\/p>\n<p> Prin HG 271 din 23 aprilie 2026, proiectul a fost declarat de importan\u0163\u00e3 na\u0163ional\u00e3, fiind aprobat \u015fi amplasamentul \u015fi fiind declan\u015fat\u00e3 procedura de expropriere. \u00cen perioada urm\u00e3toare, continuarea procedurilor de expropriere \u015fi ob\u0163inerea autoriza\u0163iilor de construire vor permite preg\u00e3tirea \u00eenceperii lucr\u00e3rilor, estimat\u00e3 cel t\u00e2rziu la \u00eenceputul anului 2027.<br \/> \u00a0<\/p>\n<p> \u00a0<\/p>\n<\/div>\n<p>[analyse_source url=&#8221;https:\/\/www.zf.ro\/zf-24\/lucrarile-linia-electrica-aeriana-suceava-balti-leaga-retelele-romaniei-rep-moldova-vor-incepe-cel-tarziu-inceputl-2027-romania-linia-93-km-iar-investitia-ridica-133-mil-lei-23263954&#8243;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/storage0.dms.mpinteractiv.ro\/media\/1\/1481\/21330\/23263954\/1\/2850876-publimedia-shutterstock-1.jpghttps:\/\/storage0.dms.mpinteractiv.ro\/media\/1\/1481\/21330\/23263954\/1\/2850876-publimedia-shutterstock-1.jpg&#8221;] Lucr\u00e3rile pentru construirea Liniei Electrice Aeriene 400 kV Suceava \u2013 B\u00e3l\u0163i, pe teritoriul Rom\u00e2niei, ar putea fi demarate cel t\u00e2rziu la \u00eenceputul anului 2027, a anun\u0163at mar\u0163i Transelectrica, proiectul incluz\u00e2nd \u015fi prima sta\u0163ie electric\u0103 de transformare din jude\u0163ul Boto\u015fani. LEA 400 kV Suceava \u2013 B\u00e3l\u0163i reprezint\u00e3 un proiect strategic pentru consolidarea infrastructurii [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[226,28],"class_list":["post-2209191","post","type-post","status-publish","format-standard","hentry","category-romania","tag-crawlmanager","tag-zf-ro"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2209191","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2209191"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2209191\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2209191"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2209191"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2209191"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}