{"id":2201808,"date":"2026-10-15T14:11:54","date_gmt":"2026-10-15T11:11:54","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=2201808"},"modified":"2026-10-15T14:11:54","modified_gmt":"2026-10-15T11:11:54","slug":"unda-verde-la-buzau-pentru-realizarea-unei-importante-investitii-in-energie-regenerabila","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=2201808","title":{"rendered":"Und\u0103 verde, la Buz\u0103u, pentru realizarea unei importante investi\u021bii \u00een energie regenerabil\u0103!"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/buzaumedia.ro\/wp-content\/uploads\/2026\/10\/parc.jpghttps:\/\/buzaumedia.ro\/wp-content\/uploads\/2026\/10\/parc.jpg&#8221;]<\/p>\n<div class=\"entry-content rbct clearfix is-highlight-shares\">\n<p>Pas important f\u0103cut, la Buz\u0103u, pentru demararea unei investi\u021bii<br \/>\nimportante, care ar putea asigura, \u00een mare parte, consumul de energie<br \/>\nelectric\u0103 a Consiliului Jude\u021bean, dar \u0219i al institu\u021biilor subordonate.<br \/>\nConsiliul Jude\u021bean a aprobat ducumenta\u021bia tehnic\u0103 pentru realizarea<br \/>\nunui parc fotovoltaic, \u00een municipiul Buz\u0103u. Proiectul prevede<br \/>\ninstalarea a aproape 1.900 de panouri fotovoltaice, precum \u0219i de<br \/>\nbaterii pentru stocarea energiei, pe un teren \u00een suprafa\u021b\u0103 de aproape<br \/>\n30.000 de metri p\u0103tra\u021bi, \u00een intravilanul municipiului.<\/p>\n<p>Finan\u021barea urmeaz\u0103 a fi ob\u021binut\u0103 prin Fondul pentru Modernizare, un<br \/>\nprogram european care subven\u021bioneaz\u0103 investi\u021bii care vizeaz\u0103 folosirea<br \/>\nsurselor regenerabile de energie \u0219i stocarea energiei. Av\u00e2nd \u00een vedere<br \/>\nc\u0103 evaluarea proiectelor prin care se solicit\u0103 finan\u021bare se face \u00een<br \/>\nfunc\u021bie de ordinea \u00een care acestea ajung la Ministerul Energiei,<br \/>\nConsiliul Jude\u021bean Buz\u0103u dore\u0219te ca dosarul complet al investi\u021biei s\u0103<br \/>\nfie depus c\u00e2t mai repede.<\/p>\n<p>Pre\u0219edintele Consiliului Jude\u021bean Buz\u0103u, Marcel Ciolacu, a precizat c\u0103<br \/>\nenergia electric\u0103 produs\u0103 de parcul fotovoltaic va fi destinat\u0103<br \/>\nconsumului propriu al Consiliului, dar \u0219i al institu\u021biilor<br \/>\nsubordonate, cum ar fi Spitalul Jude\u021bean de Urgen\u021b\u0103, Direc\u021bia General\u0103<br \/>\nde Asisten\u021b\u0103 Social\u0103 \u0219i Protec\u021bia Copilului, Muzeul Jude\u021bean, Centrul<br \/>\n\u0218colar pentru Educa\u021bie Incluziv\u0103, Liceul Special pentru Deficien\u021bi de<br \/>\nVedere ori Liceul Tehnologic Special pentru Copii cu Deficien\u021be<br \/>\nAuditive.<\/p>\n<p>Potrivit estim\u0103rilor, noul parc fotovoltaic ar urma s\u0103 produc\u0103 anual<br \/>\naproximativ 1.416,75 MWh de energie electric\u0103, echivalentul a circa<br \/>\n92% din consumul anual al institu\u021biilor buzoiene. Valoarea total\u0103 a<br \/>\ninvesti\u021biei este de aproape 9.1 milioane de lei, din care 1.6 lei,<br \/>\nreprezent\u00e2nd cheltuielile neeligibile, ar urma s\u0103 fie contribu\u021bia<br \/>\nConsiliului Jude\u021bean Buz\u0103u. Durata estimat\u0103 a lucr\u0103rilor este de 12<br \/>\nluni de la emiterea ordinului de \u00eencepere.<\/p>\n<div id=\"gallery-1\" class=\"gallery galleryid-191597 gallery-columns-3 gallery-size-thumbnail\">\n<figure class=\"gallery-item\">\n<div class=\"gallery-icon landscape\"><a href=\"https:\/\/buzaumedia.ro\/stiri-buzau\/fwd-unda-verde-la-buzau-pentru-realizarea-unei-importante-investitii-in-energie-regenerabila\/attachment\/parc-20\/\"><img loading=\"lazy\" decoding=\"async\" width=\"128\" height=\"77\" src=\"https:\/\/buzaumedia.ro\/wp-content\/uploads\/2026\/10\/parc.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt><\/a><\/div>\n<\/figure>\n<\/div>\n<\/div>\n<p>[analyse_source url=&#8221;https:\/\/buzaumedia.ro\/stiri-buzau\/fwd-unda-verde-la-buzau-pentru-realizarea-unei-importante-investitii-in-energie-regenerabila\/&#8221;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/buzaumedia.ro\/wp-content\/uploads\/2026\/10\/parc.jpghttps:\/\/buzaumedia.ro\/wp-content\/uploads\/2026\/10\/parc.jpg&#8221;] Pas important f\u0103cut, la Buz\u0103u, pentru demararea unei investi\u021bii importante, care ar putea asigura, \u00een mare parte, consumul de energie electric\u0103 a Consiliului Jude\u021bean, dar \u0219i al institu\u021biilor subordonate. Consiliul Jude\u021bean a aprobat ducumenta\u021bia tehnic\u0103 pentru realizarea unui parc fotovoltaic, \u00een municipiul Buz\u0103u. Proiectul prevede instalarea a aproape 1.900 de panouri fotovoltaice, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[66,226],"class_list":["post-2201808","post","type-post","status-publish","format-standard","hentry","category-politics","tag-buzaumedia-ro","tag-crawlmanager"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2201808","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2201808"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2201808\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2201808"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2201808"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2201808"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}