{"id":2186181,"date":"2026-10-08T18:18:06","date_gmt":"2026-10-08T15:18:06","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=2186181"},"modified":"2026-10-08T18:18:06","modified_gmt":"2026-10-08T15:18:06","slug":"prima-turbina-pe-gaz-a-centralei-mintia-a-fost-pornita-bolojan-mai-multa-energie-produsa-in-tara-mai","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=2186181","title":{"rendered":"Prima turbin\u0103 pe gaz a centralei Mintia a fost pornit\u0103. Bolojan: \u201eMai mult\u0103 energie produs\u0103 \u00een \u021bar\u0103, mai&#8230;"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/s.iw.ro\/gateway\/g\/ZmlsZVNvdXJjZT1odHRwJTNBJTJGJTJG\/c3RvcmFnZTA4dHJhbnNjb2Rlci5yY3Mt\/cmRzLnJvJTJGc3RvcmFnZSUyRjIwMjYl\/MkYxMCUyRjA4JTJGMzAwNDU0M18zMDA0\/NTQzX21pbnRpYS5qcGVnJnc9MTIwMCZo\/PTYzMCZ6Yz0xJmhhc2g9NWNkY2Q5NTI5MGQ1NGZlMjRkOWQ4NDg3ZDU5OTg3MWQ=.thumb.jpg&#8221;]<\/p>\n<div class=\"entry data-app-meta data-app-meta-article\" data-embed-base-url-canonical=\"https:\/\/www.digi24.ro\/embed\/stiri\/economie\/energie\/prima-turbina-pe-gaz-a-centralei-mintia-a-fost-pornita-bolojan-mai-multa-energie-produsa-in-tara-mai-putine-importuri-3984549\">\n<p data-index=\"1\"><strong>Noua central\u0103 de la Mintia, construit\u0103 pe amplasamentul fostei termocentrale pe c\u0103rbune, se apropie de momentul \u00een care va livra primii megawa\u021bi \u00een Sistemul Energetic Na\u021bional. Prima turbin\u0103 pe gaz a fost pornit\u0103 joi, un pas important spre finalizarea uneia dintre cele mai mari investi\u021bii energetice din Rom\u00e2nia, a anun\u021bat premierul interimar Ilie Bolojan.<\/strong><\/p>\n<p data-index=\"2\">Premierul interimar Ilie Bolojan anun\u0163\u0103 c\u0103, joi, la Mintia, a avut loc prima aprindere a turbinei pe gaz nr. 1 din noua central\u0103, dup\u0103 care urmeaz\u0103 finalizarea testelor \u015fi sincronizarea cu re\u0163eaua, iar apoi primii megawa\u0163i vor fi livra\u0163i \u00een Sistemul Energetic Na\u0163ional. Dup\u0103 finalizarea ciclului combinat, centrala va avea o capacitate instalat\u0103 de circa 1.700 MW.<\/p>\n<p data-index=\"3\">\u201eAst\u0103zi, la Mintia, a avut loc prima aprindere a turbinei pe gaz nr. 1 din noua central\u0103. Este o etap\u0103 tehnic\u0103 important\u0103 pentru una dintre cele mai importante investi\u0163ii energetice ale Rom\u00e2niei din ultimii ani. \u00cen iunie, c\u00e2nd am fost pe \u015fantier, proiectul era realizat \u00een propor\u0163ie de peste 80%. De atunci, lucr\u0103rile au avansat pas cu pas: pe 15 iunie au fost puse sub tensiune instala\u0163iile prin care turbina se racordeaz\u0103 la re\u0163ea, iar ast\u0103zi turbina a func\u0163ionat pentru prima dat\u0103 pe gaz natural. Urmeaz\u0103 finalizarea testelor, sincronizarea cu re\u0163eaua \u015fi primii megawa\u0163i livra\u0163i \u00een Sistemul Energetic Na\u0163ional. Cele dou\u0103 turbine pe gaz vor avea \u00eempreun\u0103 aproximativ 1.100 MW\u201d, a ar\u0103tat Ilie Bolojan, joi sear\u0103, \u00eentr-o postare pe Facebook.<\/p>\n<p data-index=\"4\">El a explicat c\u0103, dup\u0103 finalizarea ciclului combinat, centrala va avea o capacitate instalat\u0103 de circa 1.700 MW, printr-o investi\u0163ie privat\u0103 de peste 1,2 miliarde de euro, pe locul fostei termocentrale pe c\u0103rbune.<\/p>\n<p data-index=\"5\">\u201ePentru Rom\u00e2nia, asta \u00eenseamn\u0103 mai mult\u0103 energie produs\u0103 \u00een \u0163ar\u0103, mai pu\u0163ine importuri \u015fi o capacitate mai bun\u0103 de a acoperi consumul \u00een perioadele dificile, mai ales seara \u015fi iarna. De anul viitor, \u00eempreun\u0103 cu centrala de la Iernut, aceste capacit\u0103\u0163i noi pe gaz vor \u00eent\u0103ri siguran\u0163a sistemului energetic\u201d, a ad\u0103ugat premierul interimar.<\/p>\n<p class=\"gdpr-placeholder gdpr-social-media gdpr-iframe-fix\" data-index=\"7\"> Setarile tale privind cookie-urile nu permit afisarea continutul din aceasta sectiune. Poti actualiza setarile modulelor coookie direct din browser sau de <a class=\"ot-sdk-show-settings\" data-skip-linkfix=\"1\">aici<\/a> \u2013 e nevoie sa accepti cookie-urile social media<\/p>\n<p data-index=\"8\">Bolojan a mul\u0163umit echipelor investitorului \u015fi autorit\u0103\u0163ilor care au contribuit la avansarea proiectului. \u201eEste esen\u0163ial ca toate institu\u0163iile s\u0103 colaboreze \u00een continuare, astfel \u00eenc\u00e2t testele \u015fi etapele urm\u0103toare s\u0103 fie realizate f\u0103r\u0103 \u00eent\u00e2rzieri suplimentare. \u00cen energie, investi\u0163iile \u00ee\u015fi arat\u0103 rezultatele \u00een timp. Rom\u00e2nia are nevoie de capacit\u0103\u0163i noi de produc\u0163ie, de infrastructur\u0103 modern\u0103 \u015fi de proiecte duse p\u00e2n\u0103 la cap\u0103t. Fiecare etap\u0103 finalizat\u0103 la Mintia este un pas \u00een aceast\u0103 direc\u0163ie\u201d, a conchis Ilie Bolojan.<\/p>\n<p> Editor : <a href=\"https:\/\/www.digi24.ro\/autor\/maria-isopescu\"> M.I. <\/a><\/p>\n<\/div>\n<p>[analyse_source url=&#8221;https:\/\/www.digi24.ro\/stiri\/economie\/energie\/prima-turbina-pe-gaz-a-centralei-mintia-a-fost-pornita-bolojan-mai-multa-energie-produsa-in-tara-mai-putine-importuri-3984549&#8243;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/s.iw.ro\/gateway\/g\/ZmlsZVNvdXJjZT1odHRwJTNBJTJGJTJG\/c3RvcmFnZTA4dHJhbnNjb2Rlci5yY3Mt\/cmRzLnJvJTJGc3RvcmFnZSUyRjIwMjYl\/MkYxMCUyRjA4JTJGMzAwNDU0M18zMDA0\/NTQzX21pbnRpYS5qcGVnJnc9MTIwMCZo\/PTYzMCZ6Yz0xJmhhc2g9NWNkY2Q5NTI5MGQ1NGZlMjRkOWQ4NDg3ZDU5OTg3MWQ=.thumb.jpg&#8221;] Noua central\u0103 de la Mintia, construit\u0103 pe amplasamentul fostei termocentrale pe c\u0103rbune, se apropie de momentul \u00een care va livra primii megawa\u021bi \u00een Sistemul Energetic Na\u021bional. Prima turbin\u0103 pe gaz a fost pornit\u0103 joi, un pas important spre finalizarea uneia dintre cele mai mari investi\u021bii energetice din Rom\u00e2nia, a anun\u021bat premierul interimar [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[226,11],"class_list":["post-2186181","post","type-post","status-publish","format-standard","hentry","category-romania","tag-crawlmanager","tag-digi24"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2186181","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2186181"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2186181\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2186181"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2186181"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2186181"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}