{"id":2185717,"date":"2026-10-07T20:19:45","date_gmt":"2026-10-07T17:19:45","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=2185717"},"modified":"2026-10-07T20:19:45","modified_gmt":"2026-10-07T17:19:45","slug":"piata-romanilor-din-timisoara-a-intrat-in-santier-se-schimba-reteaua-de-termoficare","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=2185717","title":{"rendered":"Pia\u021ba Romanilor din Timi\u0219oara a intrat \u00een \u0219antier. Se schimb\u0103 re\u021beaua de termoficare"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/www.banatulazi.ro\/wp-content\/uploads\/2026\/10\/Traian-800&#215;479-1.jpg&#8221;]<\/p>\n<div class=\"td_block_wrap tdb_single_content tdi_64 td-pb-border-top td_block_template_1 td-post-content tagdiv-type\" data-td-block-uid=\"tdi_64\">\n<div class=\"tdb-block-inner td-fix-index\">\n<p><strong>Pia\u021ba Romanilor din Timi\u0219oara a intrat \u00een \u0219antier. \u00cen aceast\u0103 perioad\u0103 sunt \u00eenlocuite conductele vechi \u0219i uzate ale re\u021belei de termoficare, \u00eentr-o nou\u0103 etap\u0103 a proiectului de regenerare urban\u0103 din zona Traian.<\/strong><\/p>\n<p>Lucr\u0103rile fac parte dintr-un proiect mult mai amplu, prin care Prim\u0103ria Timi\u0219oara vrea s\u0103 transforme zona istoric\u0103 a cartierului Fabric. Interven\u021biile se desf\u0103\u0219oar\u0103 \u00een mai multe puncte, iar infrastructura edilitar\u0103 este una dintre primele etape.<\/p>\n<p>\u00cen Pia\u021ba Romanilor sunt schimbate acum conductele de termoficare. \u00cen paralel, pe Bulevardul 3 August 1919 se lucreaz\u0103 la noua linie de tramvai. Abia dup\u0103 finalizarea acestor interven\u021bii va \u00eencepe amenajarea propriu-zis\u0103 a spa\u021biilor publice.<\/p>\n<h3>Pia\u021ba Romanilor va avea mai mult spa\u021biu verde<\/h3>\n<p>Schimbarea nu se va opri \u00eens\u0103 la re\u021belele \u00eengropate sub pia\u021b\u0103. Proiectul prevede o transformare important\u0103 a \u00eentregului spa\u021biu.<\/p>\n<p>Pia\u021ba Romanilor are aproape 6.900 de metri p\u0103tra\u021bi. Aproximativ 3.100 de metri p\u0103tra\u021bi vor fi transforma\u021bi \u00een spa\u021bii verzi.<\/p>\n<p>Vor fi planta\u021bi arbori de talie mare \u0219i medie, printre care tei, cire\u0219i ornamentali \u0219i magnolii. Sunt prev\u0103zute \u0219i suprafe\u021be cu gazon \u0219i plante decorative.<\/p>\n<p>Noua pia\u021b\u0103 va avea \u0219i zone pentru relaxare \u0219i socializare. Proiectul include o pist\u0103 pentru alergare \u0219i un spa\u021biu de joac\u0103 pentru copii.<\/p>\n<p>Una dintre modific\u0103rile importante \u00eei va viza \u0219i pe \u0219oferi.<\/p>\n<p>Pe latura vestic\u0103 a pie\u021bei, accesul auto va fi restric\u021bionat. Pe latura estic\u0103, circula\u021bia va fi \u00eentr-un singur sens, spre nord, \u00eentr-un sistem de tip \u201eshared space\u201d.<\/p>\n<p>Practic, pia\u021ba ar urma s\u0103 fie mai pu\u021bin dominat\u0103 de ma\u0219ini \u0219i s\u0103 ofere mai mult loc pietonilor \u0219i activit\u0103\u021bilor \u00een aer liber.<\/p>\n<h3>O investi\u021bie de 34 de milioane de euro<\/h3>\n<p>Pia\u021ba Romanilor este doar una dintre zonele incluse \u00een proiectul de regenerare urban\u0103 a cartierului Traian.<\/p>\n<p>Investi\u021bia acoper\u0103 aproximativ 60.000 de metri p\u0103tra\u021bi \u0219i include modernizarea a patru pie\u021be \u0219i a 12 str\u0103zi din Fabric.<\/p>\n<p>Valoarea total\u0103 a proiectului este de aproximativ 34 de milioane de euro. Din aceast\u0103 sum\u0103, Prim\u0103ria Timi\u0219oara a ob\u021binut peste 14 milioane de euro finan\u021bare european\u0103 nerambursabil\u0103, prin Programul Regional Vest 2021\u20132027.<\/p>\n<p>Viceprimarul cu atribu\u021bii de primar, Ruben La\u021bc\u0103u, spune c\u0103 lucr\u0103rile avanseaz\u0103 \u00een mai multe zone ale cartierului.<\/p>\n<p>\u201e\u00cen Pia\u021ba Romanilor, de exemplu, \u00eenlocuim acum conductele vechi de termoficare, iar pe Bulevardul 3 August 1919 construim noua linie de tramvai\u201d, a transmis acesta.<\/p>\n<p>Potrivit municipalit\u0103\u021bii, obiectivul este ca lucr\u0103rile din Pia\u021ba Traian s\u0103 ava<\/p>\n<\/div>\n<\/div>\n<p>[analyse_source url=&#8221;https:\/\/www.banatulazi.ro\/piata-romanilor-din-timisoara-a-intrat-in-santier-se-schimba-reteaua-de-termoficare\/&#8221;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/www.banatulazi.ro\/wp-content\/uploads\/2026\/10\/Traian-800&#215;479-1.jpg&#8221;] Pia\u021ba Romanilor din Timi\u0219oara a intrat \u00een \u0219antier. \u00cen aceast\u0103 perioad\u0103 sunt \u00eenlocuite conductele vechi \u0219i uzate ale re\u021belei de termoficare, \u00eentr-o nou\u0103 etap\u0103 a proiectului de regenerare urban\u0103 din zona Traian. Lucr\u0103rile fac parte dintr-un proiect mult mai amplu, prin care Prim\u0103ria Timi\u0219oara vrea s\u0103 transforme zona istoric\u0103 a cartierului Fabric. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[185,226],"class_list":["post-2185717","post","type-post","status-publish","format-standard","hentry","category-romania","tag-banatulazi-ro","tag-crawlmanager"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2185717","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2185717"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2185717\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2185717"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2185717"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2185717"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}