{"id":2170855,"date":"2026-09-28T14:20:00","date_gmt":"2026-09-28T11:20:00","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=2170855"},"modified":"2026-09-28T14:20:00","modified_gmt":"2026-09-28T11:20:00","slug":"o-singura-oferta-pentru-finalizarea-noii-crese-din-lipovei","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=2170855","title":{"rendered":"O singur\u0103 ofert\u0103 pentru finalizarea noii cre\u0219e din Lipovei"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/www.tion.ro\/wp-content\/uploads\/2026\/05\/+otf\/1200&#215;630\/Um1F1kuiHWYvk3jZ2Vo1tk5PVF9WRVJZX1NFQwVlemrfp9MjjGgWOfSeJOF5yo6d5eqAbzKyXZaLarkxfgFtfK3sTz09eaJSxgfimngz9KqKkTjfRyeuCPkDUbQ=\/9866870cresalugoj4.png&#8221;]<\/p>\n<article id=\"post-2361726\" class>\n<div class=\"entry-content clearfix\">\n<div class=\"enewsArticleContent\">\n<p>Prim\u0103ria Timi\u0219oara vrea s\u0103 finalizeze \u0219i cre\u0219a de pe strada Ion Ionescu de la Brad, zona Lipovei. Dup\u0103 ce primul constructor a abandonat lucr\u0103rile prematur, municipalitatea a lansat o nou\u0103 licita\u021bie pentru proiectarea \u0219i execu\u021bia acestora. Contractul de 6,3 milioane de lei, f\u0103r\u0103 TVA, a atras o singur\u0103 ofert\u0103 \u2013 CONSTRUCTIM S.A. (lider) \u2013 PRODAO-ING.<\/p>\n<blockquote>\n<p>\u201eNoua cre\u0219\u0103 este destinat\u0103 copiilor cu v\u00e2rste \u00eentre 3 luni \u0219i 3 ani \u0219i va avea o capacitate de 29 de locuri. Cl\u0103direa va avea parter \u0219i dou\u0103 etaje \u0219i va include spa\u021bii moderne \u0219i adaptate nevoilor celor mici\u201d, precizeaz\u0103 reprezentan\u021bii prim\u0103riei.<\/p>\n<\/blockquote>\n<p>Mai precis, proiectul municipalit\u0103\u021bii prevede ca la parter s\u0103 fie amenajate s\u0103li spa\u021bioase pentru grupele de copii, dormitoare, zone pentru servirea mesei \u0219i grupuri sanitare adaptate v\u00e2rstei, precum \u0219i un cabinet medical. La etajele superioare vor fi amenajate o buc\u0103t\u0103rie complet echipat\u0103, o sal\u0103 multifunc\u021bional\u0103, o sp\u0103l\u0103torie, precum \u0219i birouri \u0219i spa\u021bii tehnice.<\/p>\n<p>\u00cen exterior, investi\u021bia Prim\u0103riei Timi\u0219oara include o zon\u0103 dedicat\u0103 copiilor, cu locuri de joac\u0103, spa\u021bii umbrite \u0219i alei pietonale, precum \u0219i o zon\u0103 separat\u0103, unde vor fi amenajate nou\u0103 locuri de parcare. Contractul prevede un termen de 15 luni, \u00een care sunt incluse at\u00e2t proiectarea, c\u00e2t \u0219i execu\u021bia.<\/p>\n<h3><strong>Trei licita\u021bii \u2013 dou\u0103 e\u0219uate \u0219i un contract reziliat<\/strong><\/h3>\n<p>V\u0103 amintim, \u00een 2021, contractul fusese atribuit la a doua \u00eencercare <strong><a href=\"https:\/\/www.tion.ro\/stirile-judetului-timis\/primaria-tot-n-are-lipici-la-firme-o-singura-oferta-pentru-noua-cresa-din-lipovei-la-a-doua-licitatie-1404246\/\" target=\"_blank\" rel=\"noopener\">singurei firme \u00eenscrise \u2013 AVASI PRODCOM<\/a><\/strong> care venise cu o ofert\u0103 de 6,6 milioane de lei. Aceasta, \u00eens\u0103, nu s-a \u021binut de treab\u0103, iar \u00een\u021belegerea a fost reziliat\u0103. \u00cen noiembrie, <strong><a href=\"https:\/\/www.tion.ro\/stirile-judetului-timis\/foto-noua-cresa-din-zona-bucovina-finalizata-va-intra-in-circuitul-scolar-din-toamna-anului-viitor-2191084\/\" target=\"_blank\" rel=\"noopener\">la momentul recep\u021biei noii cre\u0219e din zona Bucovina<\/a><\/strong>, fostul primar Dominic Fritz spunea c\u0103 la cre\u0219a din Lipovei, lucr\u0103rile nu au avansat mai mult de 20-25%.<\/p>\n<p><strong><a href=\"https:\/\/www.tion.ro\/stirile-judetului-timis\/o-noua-cresa-va-fi-construita-in-zona-de-nord-a-timisoarei-2204476\/\" target=\"_blank\" rel=\"noopener\">A treia licita\u021bie a fost lansat\u0103 p\u00e2n\u0103 la urm\u0103 pe 30 decembrie 2025<\/a><\/strong>. Au fost<strong><a href=\"https:\/\/www.tion.ro\/stirile-judetului-timis\/patru-oferte-pentru-construirea-dupa-ani-buni-a-cresei-din-zona-lipovei-2224084\/\" target=\"_blank\" rel=\"noopener\"> \u00eenscrise patru oferte<\/a><\/strong>, \u00eens\u0103, p\u00e2n\u0103 la urm\u0103, toate au fost \u201eneconforme\u201d, au concluzionat reprezentan\u021bii prim\u0103riei.<\/p>\n<p>Altfel, recent,<strong><a href=\"https:\/\/www.tion.ro\/stirile-judetului-timis\/se-face-o-noua-cresa-in-timisoara-licitatie-pentru-finalizarea-uneia-dintre-cele-doua-abandonate-de-primul-constructor-2334108\/\" target=\"_blank\" rel=\"noopener\"> Prim\u0103ria Timi\u0219oara a lansat \u0219i licita\u021bia pentru continuarea lucr\u0103rilor la cre\u0219a din cartierul Ciarda Ro\u0219ie<\/a><\/strong>, investi\u021bie prin care vor fi disponibile 38 de locuri. Pentru aceasta, este estimat un cost de 7,3 milioane de lei, f\u0103r\u0103 TVA. \u0218i aceasta este tot \u00een faza de evaluare a ofertelor \u2013 a fost depus\u0103 <strong><a href=\"https:\/\/www.tion.ro\/stirile-judetului-timis\/o-singura-oferta-pentru-finalizarea-cresei-din-ciarda-rosie-abandonata-la-30-de-primul-constructor-2353719\/\" target=\"_blank\" rel=\"noopener\">tot o singur\u0103 ofert\u0103<\/a><\/strong>, din partea asocierii ALEX-DIA CONSTRUCT S.R.L. (lider) \u2013 ATELIERUL ARHITEXT.<\/p>\n<p>\u00a0<\/p>\n<div class=\"fbShareLikeTwitterAndEmailContainer\">\n<div class=\"wrapper\">\n<div class=\"email\">\n<div id=\"mailto-pop\" class=\"pop-form pop-form-mailto\">\n<div class=\"pop-form-header\">\n<h4>Trimite articolul<\/h4>\n<p><a class=\"pop-form-close\">X<\/a><\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"tagsContainer\">\n<div class=\"tagsLabel\">Taguri:<\/div>\n<div class=\"tags\">\n<div class=\"tag\"><a href=\"https:\/\/www.tion.ro\/cimke\/constructim\" rel=\"tag\"><span class=\"link\">constructim<\/span><span class=\"separator\">,<\/span><\/a><\/div>\n<div class=\"tag\"><a href=\"https:\/\/www.tion.ro\/cimke\/cresa-lipovei\" rel=\"tag\"><span class=\"link\">cresa lipovei<\/span><span class=\"separator\">,<\/span><\/a><\/div>\n<div class=\"tag\"><a href=\"https:\/\/www.tion.ro\/cimke\/licitatie-pmt\" rel=\"tag\"><span class=\"link\">licitatie pmt<\/span><\/a><\/div>\n<\/div>\n<\/div>\n<div class=\"comments\">\n<div class=\"top\">\n<div class=\"commentsNumber\"><span class=\"number\">0<\/span><span class=\"text\">Comentarii<\/span><\/div>\n<\/div>\n<div class=\"center\">\n<div id=\"respond\" class=\"comment-respond\">\n<h3 id=\"reply-title\" class=\"comment-reply-title\"><small><a rel=\"nofollow\" id=\"cancel-comment-reply-link\" href=\"https:\/\/www.tion.ro\/stirile-judetului-timis\/o-singura-oferta-pentru-finalizarea-noii-crese-din-lipovei-2361726\/#respond\">Cancel reply<\/a><\/small><\/h3>\n<p class=\"comment-notes\"><span id=\"email-notes\">Your email address will not be published.<\/span><span class=\"required-field-message\">Required fields are marked <span class=\"required\">*<\/span><\/span><\/p>\n<p class=\"commentFormComment\"><span id=\"commentFormCount\"><br \/>\n                            inca<br \/>\n                            <span id=\"countCommentText\">1000<\/span><br \/>\n                            caractere ramase<br \/>\n                        <\/span><\/p>\n<\/div>\n<\/div>\n<div class=\"bottom\">\n<p class=\"forumDisclaimerHuRo\">\n            Citi\u021bi principiile noastre de moderare <a href=\"https:\/\/www.tion.ro\/reguli-postare-comentarii\/\" target=\"_blank\">aici<\/a>!\n        <\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/article>\n<div class=\"entry-content clearfix\">\n<div class=\"enewsArticleContent\">\n<p>Prim\u0103ria Timi\u0219oara vrea s\u0103 finalizeze \u0219i cre\u0219a de pe strada Ion Ionescu de la Brad, zona Lipovei. Dup\u0103 ce primul constructor a abandonat lucr\u0103rile prematur, municipalitatea a lansat o nou\u0103 licita\u021bie pentru proiectarea \u0219i execu\u021bia acestora. Contractul de 6,3 milioane de lei, f\u0103r\u0103 TVA, a atras o singur\u0103 ofert\u0103 \u2013 CONSTRUCTIM S.A. (lider) \u2013 PRODAO-ING.<\/p>\n<blockquote>\n<p>\u201eNoua cre\u0219\u0103 este destinat\u0103 copiilor cu v\u00e2rste \u00eentre 3 luni \u0219i 3 ani \u0219i va avea o capacitate de 29 de locuri. Cl\u0103direa va avea parter \u0219i dou\u0103 etaje \u0219i va include spa\u021bii moderne \u0219i adaptate nevoilor celor mici\u201d, precizeaz\u0103 reprezentan\u021bii prim\u0103riei.<\/p>\n<\/blockquote>\n<p>Mai precis, proiectul municipalit\u0103\u021bii prevede ca la parter s\u0103 fie amenajate s\u0103li spa\u021bioase pentru grupele de copii, dormitoare, zone pentru servirea mesei \u0219i grupuri sanitare adaptate v\u00e2rstei, precum \u0219i un cabinet medical. La etajele superioare vor fi amenajate o buc\u0103t\u0103rie complet echipat\u0103, o sal\u0103 multifunc\u021bional\u0103, o sp\u0103l\u0103torie, precum \u0219i birouri \u0219i spa\u021bii tehnice.<\/p>\n<p>\u00cen exterior, investi\u021bia Prim\u0103riei Timi\u0219oara include o zon\u0103 dedicat\u0103 copiilor, cu locuri de joac\u0103, spa\u021bii umbrite \u0219i alei pietonale, precum \u0219i o zon\u0103 separat\u0103, unde vor fi amenajate nou\u0103 locuri de parcare. Contractul prevede un termen de 15 luni, \u00een care sunt incluse at\u00e2t proiectarea, c\u00e2t \u0219i execu\u021bia.<\/p>\n<h3><strong>Trei licita\u021bii \u2013 dou\u0103 e\u0219uate \u0219i un contract reziliat<\/strong><\/h3>\n<p>V\u0103 amintim, \u00een 2021, contractul fusese atribuit la a doua \u00eencercare <strong><a href=\"https:\/\/www.tion.ro\/stirile-judetului-timis\/primaria-tot-n-are-lipici-la-firme-o-singura-oferta-pentru-noua-cresa-din-lipovei-la-a-doua-licitatie-1404246\/\" target=\"_blank\" rel=\"noopener\">singurei firme \u00eenscrise \u2013 AVASI PRODCOM<\/a><\/strong> care venise cu o ofert\u0103 de 6,6 milioane de lei. Aceasta, \u00eens\u0103, nu s-a \u021binut de treab\u0103, iar \u00een\u021belegerea a fost reziliat\u0103. \u00cen noiembrie, <strong><a href=\"https:\/\/www.tion.ro\/stirile-judetului-timis\/foto-noua-cresa-din-zona-bucovina-finalizata-va-intra-in-circuitul-scolar-din-toamna-anului-viitor-2191084\/\" target=\"_blank\" rel=\"noopener\">la momentul recep\u021biei noii cre\u0219e din zona Bucovina<\/a><\/strong>, fostul primar Dominic Fritz spunea c\u0103 la cre\u0219a din Lipovei, lucr\u0103rile nu au avansat mai mult de 20-25%.<\/p>\n<p><strong><a href=\"https:\/\/www.tion.ro\/stirile-judetului-timis\/o-noua-cresa-va-fi-construita-in-zona-de-nord-a-timisoarei-2204476\/\" target=\"_blank\" rel=\"noopener\">A treia licita\u021bie a fost lansat\u0103 p\u00e2n\u0103 la urm\u0103 pe 30 decembrie 2025<\/a><\/strong>. Au fost<strong><a href=\"https:\/\/www.tion.ro\/stirile-judetului-timis\/patru-oferte-pentru-construirea-dupa-ani-buni-a-cresei-din-zona-lipovei-2224084\/\" target=\"_blank\" rel=\"noopener\"> \u00eenscrise patru oferte<\/a><\/strong>, \u00eens\u0103, p\u00e2n\u0103 la urm\u0103, toate au fost \u201eneconforme\u201d, au concluzionat reprezentan\u021bii prim\u0103riei.<\/p>\n<p>Altfel, recent,<strong><a href=\"https:\/\/www.tion.ro\/stirile-judetului-timis\/se-face-o-noua-cresa-in-timisoara-licitatie-pentru-finalizarea-uneia-dintre-cele-doua-abandonate-de-primul-constructor-2334108\/\" target=\"_blank\" rel=\"noopener\"> Prim\u0103ria Timi\u0219oara a lansat \u0219i licita\u021bia pentru continuarea lucr\u0103rilor la cre\u0219a din cartierul Ciarda Ro\u0219ie<\/a><\/strong>, investi\u021bie prin care vor fi disponibile 38 de locuri. Pentru aceasta, este estimat un cost de 7,3 milioane de lei, f\u0103r\u0103 TVA. \u0218i aceasta este tot \u00een faza de evaluare a ofertelor \u2013 a fost depus\u0103 <strong><a href=\"https:\/\/www.tion.ro\/stirile-judetului-timis\/o-singura-oferta-pentru-finalizarea-cresei-din-ciarda-rosie-abandonata-la-30-de-primul-constructor-2353719\/\" target=\"_blank\" rel=\"noopener\">tot o singur\u0103 ofert\u0103<\/a><\/strong>, din partea asocierii ALEX-DIA CONSTRUCT S.R.L. (lider) \u2013 ATELIERUL ARHITEXT.<\/p>\n<p>\u00a0<\/p>\n<div class=\"fbShareLikeTwitterAndEmailContainer\">\n<div class=\"wrapper\">\n<div class=\"email\">\n<div id=\"mailto-pop\" class=\"pop-form pop-form-mailto\">\n<div class=\"pop-form-header\">\n<h4>Trimite articolul<\/h4>\n<p><a class=\"pop-form-close\">X<\/a><\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"tagsContainer\">\n<div class=\"tagsLabel\">Taguri:<\/div>\n<div class=\"tags\">\n<div class=\"tag\"><a href=\"https:\/\/www.tion.ro\/cimke\/constructim\" rel=\"tag\"><span class=\"link\">constructim<\/span><span class=\"separator\">,<\/span><\/a><\/div>\n<div class=\"tag\"><a href=\"https:\/\/www.tion.ro\/cimke\/cresa-lipovei\" rel=\"tag\"><span class=\"link\">cresa lipovei<\/span><span class=\"separator\">,<\/span><\/a><\/div>\n<div class=\"tag\"><a href=\"https:\/\/www.tion.ro\/cimke\/licitatie-pmt\" rel=\"tag\"><span class=\"link\">licitatie pmt<\/span><\/a><\/div>\n<\/div>\n<\/div>\n<div class=\"comments\">\n<div class=\"top\">\n<div class=\"commentsNumber\"><span class=\"number\">0<\/span><span class=\"text\">Comentarii<\/span><\/div>\n<\/div>\n<div class=\"center\">\n<div id=\"respond\" class=\"comment-respond\">\n<h3 id=\"reply-title\" class=\"comment-reply-title\"><small><a rel=\"nofollow\" id=\"cancel-comment-reply-link\" href=\"https:\/\/www.tion.ro\/stirile-judetului-timis\/o-singura-oferta-pentru-finalizarea-noii-crese-din-lipovei-2361726\/#respond\">Cancel reply<\/a><\/small><\/h3>\n<p class=\"comment-notes\"><span id=\"email-notes\">Your email address will not be published.<\/span><span class=\"required-field-message\">Required fields are marked <span class=\"required\">*<\/span><\/span><\/p>\n<p class=\"commentFormComment\"><span id=\"commentFormCount\"><br \/>\n                            inca<br \/>\n                            <span id=\"countCommentText\">1000<\/span><br \/>\n                            caractere ramase<br \/>\n                        <\/span><\/p>\n<\/div>\n<\/div>\n<div class=\"bottom\">\n<p class=\"forumDisclaimerHuRo\">\n            Citi\u021bi principiile noastre de moderare <a href=\"https:\/\/www.tion.ro\/reguli-postare-comentarii\/\" target=\"_blank\">aici<\/a>!\n        <\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<p>[analyse_source url=&#8221;https:\/\/www.tion.ro\/stirile-judetului-timis\/o-singura-oferta-pentru-finalizarea-noii-crese-din-lipovei-2361726\/&#8221;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/www.tion.ro\/wp-content\/uploads\/2026\/05\/+otf\/1200&#215;630\/Um1F1kuiHWYvk3jZ2Vo1tk5PVF9WRVJZX1NFQwVlemrfp9MjjGgWOfSeJOF5yo6d5eqAbzKyXZaLarkxfgFtfK3sTz09eaJSxgfimngz9KqKkTjfRyeuCPkDUbQ=\/9866870cresalugoj4.png&#8221;] Prim\u0103ria Timi\u0219oara vrea s\u0103 finalizeze \u0219i cre\u0219a de pe strada Ion Ionescu de la Brad, zona Lipovei. Dup\u0103 ce primul constructor a abandonat lucr\u0103rile prematur, municipalitatea a lansat o nou\u0103 licita\u021bie pentru proiectarea \u0219i execu\u021bia acestora. Contractul de 6,3 milioane de lei, f\u0103r\u0103 TVA, a atras o singur\u0103 ofert\u0103 \u2013 CONSTRUCTIM S.A. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[226,191],"class_list":["post-2170855","post","type-post","status-publish","format-standard","hentry","category-romania","tag-crawlmanager","tag-tion-ro"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2170855","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2170855"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2170855\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2170855"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2170855"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2170855"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}