{"id":2158166,"date":"2026-09-22T16:48:17","date_gmt":"2026-09-22T13:48:17","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=2158166"},"modified":"2026-09-22T16:48:17","modified_gmt":"2026-09-22T13:48:17","slug":"constantin-toma-drumul-orbital-al-buzaului-devine-realitate","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=2158166","title":{"rendered":"Constantin Toma: Drumul Orbital al Buz\u0103ului devine realitate!"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/buzaumedia.ro\/wp-content\/uploads\/2026\/09\/1790086545_Constantin-Toma-INFORMARE.jpghttps:\/\/buzaumedia.ro\/wp-content\/uploads\/2026\/09\/1790086545_Constantin-Toma-INFORMARE.jpg&#8221;]<\/p>\n<div class=\"entry-content rbct clearfix is-highlight-shares\">\n<p>Dragi buzoieni,<\/p>\n<p>Drumul Orbital al Buz\u0103ului devine realitate!<\/p>\n<p>Guvernul a aprobat indicatorii tehnico-economici pentru primele trei tronsoane ale Drumului Orbital, o investi\u021bie de peste 200 de milioane de euro, pentru realizarea a peste 13 kilometri de drum, din cei 24 de kilometri c\u00e2t va avea \u00eentreaga centur\u0103 ocolitoare a Buz\u0103ului.<\/p>\n<p>Este un proiect pentru care am muncit ani de zile \u0219i \u00een care am crezut de la \u00eenceput. \u00cen 2022, Prim\u0103ria Buz\u0103u a \u00eencheiat parteneriatul cu CNAIR pentru preg\u0103tirea \u0219i implementarea lui. Au urmat studiile, proiectarea, avizele, aprobarea Studiului de Fezabilitate \u0219i toate demersurile necesare pentru ob\u021binerea finan\u021b\u0103rii. Am insistat \u0219i am mers \u00eenainte pentru c\u0103 am \u0219tiut c\u00e2t de important este acest drum pentru viitorul Buz\u0103ului.<\/p>\n<p>Acum, odat\u0103 cu decizia Guvernului, facem pasul decisiv de la proiect la investi\u021bia care poate schimba fundamental dezvoltarea ora\u0219ului nostru.<\/p>\n<p>Drumul Orbital nu este doar o nou\u0103 centur\u0103 a Buz\u0103ului. Este o investi\u021bie strategic\u0103 \u00een economia ora\u0219ului. Va conecta Buz\u0103ul la A7, DN2B \u0219i viitorul Drum Expres Buz\u0103u\u2013Br\u0103ila, va scoate o parte important\u0103 din traficul greu din ora\u0219 \u0219i va deschide noi zone pentru investi\u021bii \u0219i dezvoltare.<\/p>\n<p>\u00cen jurul marilor infrastructuri se dezvolt\u0103 companii, apar locuri de munc\u0103 \u0219i cresc comunit\u0103\u021bile. Iar Buz\u0103ul are un avantaj extraordinar prin pozi\u021bia sa, pe care trebuie s\u0103 \u0219tim s\u0103 \u00eel valorific\u0103m.<\/p>\n<p>Am spus mereu c\u0103 Buz\u0103ul trebuie g\u00e2ndit pentru urm\u0103toarele decenii, nu doar pentru urm\u0103torii c\u00e2\u021biva ani. Drumul Orbital este parte din aceast\u0103 viziune.<\/p>\n<p>Un proiect mare se construie\u0219te cu r\u0103bdare, perseveren\u021b\u0103 \u0219i foarte mult\u0103 munc\u0103. Ast\u0103zi suntem mai aproape ca oric\u00e2nd s\u0103 \u00eel vedem realizat.<\/p>\n<p>Responsabilitatea acestui proiect a fost \u00een sarcina doamnei Raluca Bobescu, arhitecta \u0219ef\u0103 a Prim\u0103riei Buz\u0103u, care \u0219i-a f\u0103cut bine treaba \u0219i \u00eei mul\u021bumesc mult.<\/p>\n<p>Mul\u021bumesc Guvernului \u0219i \u00een mod special premierului Ilie Bolojan pentru c\u0103 a pus prima piatr\u0103 la implementarea acestui proiect strategic pentru dezvoltarea economic\u0103 a zonei.<\/p>\n<p>Buz\u0103ul merge \u00eenainte!<\/p>\n<p>Constantin Toma, primarul municipiului Buz\u0103u<\/p>\n<\/div>\n<p>[analyse_source url=&#8221;https:\/\/buzaumedia.ro\/stiri-buzau\/constantin-toma-drumul-orbital-al-buzaului-devine-realitate\/&#8221;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/buzaumedia.ro\/wp-content\/uploads\/2026\/09\/1790086545_Constantin-Toma-INFORMARE.jpghttps:\/\/buzaumedia.ro\/wp-content\/uploads\/2026\/09\/1790086545_Constantin-Toma-INFORMARE.jpg&#8221;] Dragi buzoieni, Drumul Orbital al Buz\u0103ului devine realitate! Guvernul a aprobat indicatorii tehnico-economici pentru primele trei tronsoane ale Drumului Orbital, o investi\u021bie de peste 200 de milioane de euro, pentru realizarea a peste 13 kilometri de drum, din cei 24 de kilometri c\u00e2t va avea \u00eentreaga centur\u0103 ocolitoare a Buz\u0103ului. Este un [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[66,226],"class_list":["post-2158166","post","type-post","status-publish","format-standard","hentry","category-politics","tag-buzaumedia-ro","tag-crawlmanager"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2158166","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2158166"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2158166\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2158166"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2158166"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2158166"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}