{"id":2139947,"date":"2026-09-09T14:53:56","date_gmt":"2026-09-09T11:53:56","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=2139947"},"modified":"2026-09-09T14:53:56","modified_gmt":"2026-09-09T11:53:56","slug":"avanseaza-lucrarile-la-pasajul-slavici-polona-se-intervine-la-rampele-de-acces-si-structurile-peste-calea-ferata","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=2139947","title":{"rendered":"Avanseaza lucrarile la pasajul Slavici \u2013 Polona! Se intervine la rampele de acces si structurile peste calea ferata"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/09\/5-3-scaled-e1788968829238.jpg&#8221;]<\/p>\n<div class=\"post-content-bd\">\n<p>Avanseaz\u0103 lucr\u0103rile pe \u015fantierul deschis la pasajul Slavici \u2013 Polon\u0103. Potrivit Prim\u0103riei Timi\u015foara,\u00a0constructorul intervine \u00een aceast\u0103 etap\u0103 pe rampele de acces \u0219i la cele dou\u0103 pasaje peste infrastructura feroviar\u0103. P\u00e2n\u0103 \u00een prezent, au fost executate lucr\u0103ri de terasamente, a fost forat\u0103 o parte semnificativ\u0103 dintre pilo\u021bi \u0219i au fost realizate o parte dintre zidurile de sprijin \u0219i funda\u021biile necesare structurii viitorului pasaj.<\/p>\n<p><em>\u201cPe rampele pasajului, lucr\u0103rile pentru extinderea \u0219i consolidarea drumurilor sunt realizate \u00een propor\u021bie de aproximativ 80%. Au fost finalizate lucr\u0103rile de forare pentru structurile de sus\u021binere pe dou\u0103 dintre rampe, iar pe cea de-a treia urmeaz\u0103 s\u0103 fie fora\u021bi \u00eenc\u0103 14 pilo\u021bi. \u00cen paralel, constructorul preg\u0103te\u0219te arm\u0103turile pentru urm\u0103toarea etap\u0103 de construc\u021bie \u0219i a realizat ziduri de sprijin pe strada Polon\u0103, strada Wilhelm Tell \u0219i pe rampele din zona Ovidiu Cotru\u0219. La cele dou\u0103 pasaje care vor traversa infrastructura feroviar\u0103, lucr\u0103rile de forare sunt realizate \u00een propor\u021bie de aproximativ 75%\u201d<\/em>, a informat Prim\u0103ria Timi\u015foara.<\/p>\n<p>Pentru desf\u0103\u0219urarea lucr\u0103rilor au fost demontate \u0219i elementele de infrastructur\u0103 existente: parapetele carosabile \u0219i pietonale, corpurile de iluminat \u0219i cablurile de alimentare aferente, precum \u0219i \u0219ina de tramvai.<\/p>\n<p>Pasajul Slavici\u2013Polon\u0103 este o leg\u0103tur\u0103 rutier\u0103 direct\u0103 \u00eentre strada Ovidiu Cotru\u0219 \u0219i zona Freidorf\u2013Calea \u0218agului, peste infrastructura feroviar\u0103. Proiectul cuprinde \u0219i lucr\u0103ri pentru l\u0103rgirea pasajului existent, pentru a permite accesul spre \u0219i dinspre Ovidiu Cotru\u0219 pe c\u00e2te dou\u0103 benzi pe sens. Scopul este eliminarea g\u00e2tuirii actuale.<\/p>\n<p><em>\u201cLucr\u0103rile au \u00eenceput \u00een luna iunie 2026 \u0219i fac parte din investi\u021biile majore de infrastructur\u0103 ale Prim\u0103riei Timi\u0219oara pentru modernizarea infrastructurii vechi, \u00eembun\u0103t\u0103\u021birea conexiunilor dintre cartiere \u0219i reducerea blocajelor de trafic din ora\u0219\u201d<\/em>, a transmis Prim\u0103ria Timi\u015foara.<\/p>\n<p>Valoarea contractului de execu\u021bie este de peste 49 de milioane de lei, f\u0103r\u0103 TVA, iar investi\u021bia este finan\u021bat\u0103 integral din bugetul local. Lucr\u0103rile sunt realizate de asocierea format\u0103 din Freyrom S.A., Procons Group S.R.L., Inginerie Drumuri \u0219i Poduri S.R.L. \u0219i Integrated Road Solutions S.R.L.<\/p>\n<div id=\"gallery-1\" class=\"gallery galleryid-190696 gallery-columns-3 gallery-size-thumbnail\">\n<figure class=\"gallery-item\">\n<div class=\"gallery-icon landscape\"><a href=\"https:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/09\/polona-3-scaled-e1788968783690.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/09\/polona-3-150x150.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/09\/polona-3-150x150.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt><\/a><\/div>\n<\/figure>\n<figure class=\"gallery-item\">\n<div class=\"gallery-icon landscape\"><a href=\"https:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/09\/6-5-scaled-e1788968736991.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/09\/6-5-150x150.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/09\/6-5-150x150.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt><\/a><\/div>\n<\/figure>\n<figure class=\"gallery-item\">\n<div class=\"gallery-icon landscape\"><a href=\"https:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/09\/4-4-scaled-e1788968700669.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/09\/4-4-150x150.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt><img decoding=\"async\" loading=\"lazy\" width=\"150\" height=\"150\" src=\"https:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/09\/4-4-150x150.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt><\/a><\/div>\n<\/figure>\n<\/div>\n<\/div>\n<p>[analyse_source url=&#8221;https:\/\/www.banatulmeu.ro\/avanseaza-lucrarile-la-pasajul-slavici-polona-se-intervine-la-rampele-de-acces-si-structurile-peste-calea-ferata\/&#8221;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/09\/5-3-scaled-e1788968829238.jpg&#8221;] Avanseaz\u0103 lucr\u0103rile pe \u015fantierul deschis la pasajul Slavici \u2013 Polon\u0103. Potrivit Prim\u0103riei Timi\u015foara,\u00a0constructorul intervine \u00een aceast\u0103 etap\u0103 pe rampele de acces \u0219i la cele dou\u0103 pasaje peste infrastructura feroviar\u0103. P\u00e2n\u0103 \u00een prezent, au fost executate lucr\u0103ri de terasamente, a fost forat\u0103 o parte semnificativ\u0103 dintre pilo\u021bi \u0219i au fost realizate o parte [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[204,226],"class_list":["post-2139947","post","type-post","status-publish","format-standard","hentry","category-romania","tag-banatulmeu-ro","tag-crawlmanager"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2139947","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2139947"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2139947\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2139947"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2139947"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2139947"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}