{"id":2136997,"date":"2026-09-09T08:47:59","date_gmt":"2026-09-09T05:47:59","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=2136997"},"modified":"2026-09-09T08:47:59","modified_gmt":"2026-09-09T05:47:59","slug":"au-inceput-lucrarile-la-noua-hala-de-tramvaie-din-timisoara-va-fi-gata-in-10-luni","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=2136997","title":{"rendered":"Au \u00eenceput lucr\u0103rile la noua hal\u0103 de tramvaie din Timi\u0219oara. Va fi gata \u00een 10 luni"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/www.banatulazi.ro\/wp-content\/uploads\/2026\/09\/hala-stpt1.png&#8221;]<\/p>\n<div class=\"td_block_wrap tdb_single_content tdi_64 td-pb-border-top td_block_template_1 td-post-content tagdiv-type\" data-td-block-uid=\"tdi_64\">\n<div class=\"tdb-block-inner td-fix-index\">\n<p><strong>Noua hal\u0103 de mentenan\u021b\u0103 pentru tramvaiele din Timi\u0219oara prinde contur. Lucr\u0103rile au \u00eenceput, iar constructorul a trecut deja la s\u0103p\u0103turile pentru funda\u021bia viitoarei cl\u0103diri. <a href=\"https:\/\/www.instagram.com\/presspectiva\/\">Presspectiva<\/a> a publicat pe Instagram imagini de pe \u0219antier, surprinz\u00e2nd stadiul actual al investi\u021biei.<\/strong><\/p>\n<p>Potrivit Prim\u0103riei Timi\u0219oara, terenul a fost eliberat de Societatea de Transport Public, iar constructorul a \u00eenceput lucr\u0103rile pentru funda\u021bia halei. Cl\u0103direa va avea aproximativ 90 de metri lungime \u0219i o suprafa\u021b\u0103 de 860 de metri p\u0103tra\u021bi.<\/p>\n<p>Investi\u021bia este destinat\u0103 \u00eentre\u021binerii noii flote de tramvaie a Timi\u0219oarei. Noua hal\u0103 va permite efectuarea simultan\u0103 a lucr\u0103rilor de verificare, \u00eentre\u021binere \u0219i repara\u021bii pentru mai multe tramvaie.<\/p>\n<p>Proiectul prevede o cale de rulare, un pod rulant cu o capacitate de cinci tone, o groap\u0103 tehnic\u0103 \u0219i 12 elevatoare. Aceste dot\u0103ri vor permite echipelor tehnice s\u0103 ajung\u0103 mai u\u0219or la principalele componente ale tramvaielor.<\/p>\n<p>Accesul \u00een hal\u0103 va fi realizat at\u00e2t din bulevardul D\u00e2mbovi\u021ba, c\u00e2t \u0219i din strada Ardealului. Municipalitatea estimeaz\u0103 c\u0103 noua infrastructur\u0103 va reduce timpul \u00een care tramvaiele sunt retrase din circula\u021bie pentru lucr\u0103ri \u0219i va cre\u0219te disponibilitatea acestora pentru transportul c\u0103l\u0103torilor.<\/p>\n<p>Contractul pentru proiectarea \u0219i execu\u021bia halei are o valoare de 12 milioane de lei, f\u0103r\u0103 TVA. Termenul de execu\u021bie este de 10 luni. Lucr\u0103rile sunt realizate de asocierea ZARON SRL, \u00een calitate de lider, \u0219i EN ELECTRIC PROIECT OFFICE SRL.<\/p>\n<p>Investi\u021bia vine dup\u0103 mai multe \u00eent\u00e2rzieri \u00een realizarea infrastructurii necesare noii flote de tramvaie. Acum, \u0219antierul este deschis, iar primele lucr\u0103ri sunt deja vizibile \u00een teren.<\/p>\n<p>Imaginile publicate de Presspectiva arat\u0103 zona \u00een care sunt sta\u021bionate tramvaiele \u0219i evolu\u021bia lucr\u0103rilor pentru viitoarea hal\u0103. Dac\u0103 lucr\u0103rile respect\u0103 termenul anun\u021bat de municipalitate, noua construc\u021bie ar urma s\u0103 fie finalizat\u0103 \u00een aproximativ zece luni.<\/p>\n<p>Noua hal\u0103 este una dintre investi\u021biile necesare pentru ca tramvaiele noi ale Timi\u0219oarei s\u0103 poat\u0103 beneficia de condi\u021bii adecvate de \u00eentre\u021binere \u0219i repara\u021bii.<\/p>\n<p>\u00a0<\/p>\n<\/div>\n<\/div>\n<p>[analyse_source url=&#8221;https:\/\/www.banatulazi.ro\/au-inceput-lucrarile-la-noua-hala-de-tramvaie-din-timisoara-va-fi-gata-in-10-luni\/&#8221;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/www.banatulazi.ro\/wp-content\/uploads\/2026\/09\/hala-stpt1.png&#8221;] Noua hal\u0103 de mentenan\u021b\u0103 pentru tramvaiele din Timi\u0219oara prinde contur. Lucr\u0103rile au \u00eenceput, iar constructorul a trecut deja la s\u0103p\u0103turile pentru funda\u021bia viitoarei cl\u0103diri. Presspectiva a publicat pe Instagram imagini de pe \u0219antier, surprinz\u00e2nd stadiul actual al investi\u021biei. Potrivit Prim\u0103riei Timi\u0219oara, terenul a fost eliberat de Societatea de Transport Public, iar constructorul [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[185,226],"class_list":["post-2136997","post","type-post","status-publish","format-standard","hentry","category-romania","tag-banatulazi-ro","tag-crawlmanager"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2136997","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2136997"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2136997\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2136997"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2136997"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2136997"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}