{"id":2128420,"date":"2026-09-04T07:30:24","date_gmt":"2026-09-04T04:30:24","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=2128420"},"modified":"2026-09-04T07:30:24","modified_gmt":"2026-09-04T04:30:24","slug":"baza-sportiva-costica-radulescu-din-timisoara-receptionata-cand-ar-putea-fi-deschisa","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=2128420","title":{"rendered":"Baza sportiv\u0103 \u201eCostic\u0103 R\u0103dulescu\u201d din Timi\u0219oara, recep\u021bionat\u0103. C\u00e2nd ar putea fi deschis\u0103"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/www.banatulazi.ro\/wp-content\/uploads\/2026\/09\/IMG_6400.jpeg&#8221;]<\/p>\n<div class=\"td_block_wrap tdb_single_content tdi_64 td-pb-border-top td_block_template_1 td-post-content tagdiv-type\" data-td-block-uid=\"tdi_64\">\n<div class=\"tdb-block-inner td-fix-index\">\n<p><strong>O nou\u0103 baz\u0103 sportiv\u0103 este aproape s\u0103 fie deschis\u0103 timi\u0219orenilor. Prim\u0103ria Timi\u0219oara a finalizat recep\u021bia bazei sportive \u201eCostic\u0103 R\u0103dulescu\u201d, dup\u0103 \u0219ase ani de la semnarea primului contract pentru realizarea investi\u021biei.<\/strong><\/p>\n<p>Complexul se afl\u0103 la intersec\u021bia str\u0103zilor Costic\u0103 R\u0103dulescu \u0219i Cerna. Investi\u021bia a fost realizat\u0103 prin Compania Na\u021bional\u0103 de Investi\u021bii, iar acum municipalitatea preg\u0103te\u0219te ultimii pa\u0219i \u00eenainte ca baza s\u0103 poat\u0103 fi folosit\u0103.<\/p>\n<p>Noua baz\u0103 sportiv\u0103 are un teren de fotbal cu nocturn\u0103 \u0219i o tribun\u0103 cu 500 de locuri. Complexul include \u0219i un teren multifunc\u021bional, care poate fi folosit pentru minifotbal, handbal \u0219i baschet.<\/p>\n<p>Pe l\u00e2ng\u0103 terenuri, baza dispune de vestiare, spa\u021bii administrative, parcare \u0219i zone verzi. Potrivit municipalit\u0103\u021bii, spa\u021biul va fi pus at\u00e2t la dispozi\u021bia cluburilor sportive, c\u00e2t \u0219i a comunit\u0103\u021bii.<\/p>\n<p>\u201eAm \u00eencheiat recep\u021bia noii baze sportive \u00abCostic\u0103 R\u0103dulescu\u00bb \u0219i continu\u0103m cu pa\u0219ii necesari pentru ca aceasta s\u0103 poat\u0103 fi deschis\u0103 c\u00e2t mai rapid pentru iubitorii de sport din Timi\u0219oara\u201d, a transmis Prim\u0103ria Timi\u0219oara.<\/p>\n<p>Proiectul are \u00eens\u0103 o istorie mai lung\u0103. Primul contract pentru construirea bazei a fost semnat \u00een 2020. Autoriza\u021bia de construire a fost emis\u0103 \u00een decembrie 2021, iar termenul ini\u021bial de execu\u021bie era de doar nou\u0103 luni.<\/p>\n<p>Lucr\u0103rile au ajuns la aproximativ 70-80% \u00een 2023, dup\u0103 care \u0219antierul a fost abandonat. Baza a r\u0103mas nefolosit\u0103 mai bine de doi ani. Pentru finalizarea investi\u021biei a fost organizat\u0103 o nou\u0103 licita\u021bie, iar contractul a fost semnat la \u00eenceputul acestui an.<\/p>\n<p>\u00cen luna iunie, lucr\u0103rile erau finalizate \u00een propor\u021bie de aproximativ 90%. Atunci mai erau necesare interven\u021bii la interior \u0219i exterior, precum \u0219i preg\u0103tiri pentru racordarea la re\u021beaua de gaze.<\/p>\n<p>Acum, dup\u0103 recep\u021bie, municipalitatea mai are de parcurs c\u00e2teva formalit\u0103\u021bi \u00eenainte ca baza sportiv\u0103 s\u0103 fie deschis\u0103. Primele activit\u0103\u021bi sportive ar putea avea loc aici \u00een perioada urm\u0103toare.<\/p>\n<p>Pentru Timi\u0219oara, noul complex \u00eenseamn\u0103 un spa\u021biu suplimentar pentru sport, at\u00e2t pentru cluburile locale, c\u00e2t \u0219i pentru cei care vor s\u0103 practice mi\u0219care \u00een aer liber.<\/p>\n<div id=\"gallery-1\" class=\"gallery galleryid-416636 gallery-columns-3 gallery-size-thumbnail\">\n<figure class=\"gallery-item\">\n<div class=\"gallery-icon portrait\"><a href=\"https:\/\/www.banatulazi.ro\/baza-sportiva-costica-radulescu-din-timisoara-receptionata-cand-ar-putea-fi-deschisa\/img_6401\/\"><img decoding=\"async\" loading=\"lazy\" width=\"150\" height=\"150\" src=\"https:\/\/www.banatulazi.ro\/wp-content\/uploads\/2026\/09\/IMG_6401-150x150.jpeg\" class=\"attachment-thumbnail size-thumbnail\" alt><\/a><\/div>\n<\/figure>\n<figure class=\"gallery-item\">\n<div class=\"gallery-icon landscape\"><a href=\"https:\/\/www.banatulazi.ro\/?attachment_id=416633\"><img decoding=\"async\" loading=\"lazy\" width=\"150\" height=\"150\" src=\"https:\/\/www.banatulazi.ro\/wp-content\/uploads\/2026\/09\/IMG_6403-150x150.jpeg\" class=\"attachment-thumbnail size-thumbnail\" alt><\/a><\/div>\n<\/figure>\n<figure class=\"gallery-item\">\n<div class=\"gallery-icon landscape\"><a href=\"https:\/\/www.banatulazi.ro\/?attachment_id=416634\"><img decoding=\"async\" loading=\"lazy\" width=\"150\" height=\"150\" src=\"https:\/\/www.banatulazi.ro\/wp-content\/uploads\/2026\/09\/IMG_6402-150x150.jpeg\" class=\"attachment-thumbnail size-thumbnail\" alt><\/a><\/div>\n<\/figure>\n<figure class=\"gallery-item\">\n<div class=\"gallery-icon landscape\"><a href=\"https:\/\/www.banatulazi.ro\/?attachment_id=416632\"><img decoding=\"async\" loading=\"lazy\" width=\"150\" height=\"150\" src=\"https:\/\/www.banatulazi.ro\/wp-content\/uploads\/2026\/09\/IMG_6404-150x150.jpeg\" class=\"attachment-thumbnail size-thumbnail\" alt><\/a><\/div>\n<\/figure>\n<\/div>\n<\/div>\n<\/div>\n<p>[analyse_source url=&#8221;https:\/\/www.banatulazi.ro\/baza-sportiva-costica-radulescu-din-timisoara-receptionata-cand-ar-putea-fi-deschisa\/&#8221;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/www.banatulazi.ro\/wp-content\/uploads\/2026\/09\/IMG_6400.jpeg&#8221;] O nou\u0103 baz\u0103 sportiv\u0103 este aproape s\u0103 fie deschis\u0103 timi\u0219orenilor. Prim\u0103ria Timi\u0219oara a finalizat recep\u021bia bazei sportive \u201eCostic\u0103 R\u0103dulescu\u201d, dup\u0103 \u0219ase ani de la semnarea primului contract pentru realizarea investi\u021biei. Complexul se afl\u0103 la intersec\u021bia str\u0103zilor Costic\u0103 R\u0103dulescu \u0219i Cerna. Investi\u021bia a fost realizat\u0103 prin Compania Na\u021bional\u0103 de Investi\u021bii, iar acum municipalitatea [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[185,226],"class_list":["post-2128420","post","type-post","status-publish","format-standard","hentry","category-romania","tag-banatulazi-ro","tag-crawlmanager"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2128420","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2128420"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2128420\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2128420"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2128420"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2128420"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}