{"id":2128094,"date":"2026-09-04T14:56:00","date_gmt":"2026-09-04T11:56:00","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=2128094"},"modified":"2026-09-04T14:56:00","modified_gmt":"2026-09-04T11:56:00","slug":"anre-a-aprobat-planul-de-investitii-al-transelectrica-pana-in-2035-si-cere-urgentarea-legaturilor-cu","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=2128094","title":{"rendered":"ANRE a aprobat planul de investi\u021bii al Transelectrica p\u00e2n\u0103 \u00een 2035 \u0219i cere urgentarea leg\u0103turilor cu&#8230;"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/s.iw.ro\/gateway\/g\/ZmlsZVNvdXJjZT1odHRwJTNBJTJGJTJG\/c3RvcmFnZTA3dHJhbnNjb2Rlci5yY3Mt\/cmRzLnJvJTJGc3RvcmFnZSUyRjIwMTcl\/MkYwMSUyRjEzJTJGNzI4ODc3XzcyODg3\/N190cmFuc2VsZWN0cmljYS5qcGcmdz0x\/MjAwJmg9NjMwJnpjPTEmaGFzaD1mZDE5\/N2Q2ZjU0Y2I0NTMxOTQwY2MwNzU5OTc5YmJmYQ==.thumb.jpg&#8221;]<\/p>\n<div class=\"entry data-app-meta data-app-meta-article\" data-embed-base-url-canonical=\"https:\/\/www.digi24.ro\/embed\/stiri\/economie\/energie\/anre-a-aprobat-planul-de-investitii-al-transelectrica-pana-in-2035-si-cere-urgentarea-legaturilor-cu-ungaria-si-bulgaria-3935233\">\n<p data-index=\"1\"><strong>Autoritatea Na\u021bional\u0103 de Reglementare \u00een Domeniul Energiei (ANRE) a aprobat planul Transelectrica pentru dezvoltarea re\u021belei electrice de transport \u00een perioada 2026-2035. Documentul cuprinde 117 lucr\u0103ri de investi\u021bii, iar compania trebuie s\u0103 prezinte, \u00een termen de 30 de zile, un program pentru accelerarea proiectelor nefinalizate care contribuie la cre\u0219terea capacit\u0103\u021bii de schimb al energiei cu Ungaria \u0219i Bulgaria.<\/strong><\/p>\n<p data-index=\"2\">Planul de dezvoltare a re\u021belei electrice de transport stabile\u0219te investi\u021biile pe care Transelectrica trebuie s\u0103 le realizeze \u00een urm\u0103torul deceniu. Din cele 117 lucr\u0103ri incluse \u00een document, 25 reprezint\u0103 obiective complet noi.<\/p>\n<p data-index=\"3\">Investi\u021biile vizeaz\u0103 modernizarea liniilor \u0219i a sta\u021biilor electrice, \u00eenchiderea inelului na\u021bional de 400 kV, cre\u0219terea capacit\u0103\u021bii de transport \u0219i de interconectare, precum \u0219i digitalizarea re\u021belei.<\/p>\n<p data-index=\"4\">\u201eAm aprobat un plan care nu este doar o list\u0103 de investi\u021bii, ci un angajament de a preg\u0103ti re\u021beaua rom\u00e2neasc\u0103 de transport pentru economia energetic\u0103 a urm\u0103torului deceniu. Obiectivele sunt mai mult\u0103 produc\u021bie regenerabil\u0103, mai mult\u0103 stocare \u0219i mai pu\u021bine blocaje \u00een sistem\u201d, a declarat pre\u0219edintele ANRE, George Niculescu.<\/p>\n<h2 id=\"highlight-3935233-1\">Transelectrica trebuie s\u0103 prezinte un program de accelerare \u00een 30 de zile<\/h2>\n<p data-index=\"5\">O aten\u021bie special\u0103 este acordat\u0103 lucr\u0103rilor care ar trebui s\u0103 creasc\u0103 posibilit\u0103\u021bile Rom\u00e2niei de a importa \u0219i exporta energie. ANRE a impus Transelectrica s\u0103 accelereze proiectele nefinalizate incluse at\u00e2t \u00een planul de dezvoltare a re\u021belei, c\u00e2t \u0219i \u00een Planul de ac\u021biuni pentru cre\u0219terea capacit\u0103\u021bii transfrontaliere.<\/p>\n<p data-index=\"6\">Programul de accelerare trebuie transmis Autorit\u0103\u021bii \u00een cel mult 30 de zile \u0219i va fi verificat trimestrial. Documentul va trebui s\u0103 arate \u0219i \u00een ce m\u0103sur\u0103 pot contribui tehnologiile moderne la cre\u0219terea capacit\u0103\u021bii disponibile pentru comer\u021bul transfrontalier. Printre solu\u021biile avute \u00een vedere se num\u0103r\u0103 monitorizarea dinamic\u0103 a capacit\u0103\u021bii liniilor \u0219i utilizarea conductoarelor de \u00eenalt\u0103 temperatur\u0103.<\/p>\n<p data-index=\"7\">\u201eRom\u00e2nia a dep\u0103\u0219it \u021binta european\u0103 legat\u0103 de gradul de interconectare, dar lec\u021biile recente ne arat\u0103 c\u00e2t de important\u0103 este capacitatea de interconectare pentru a dep\u0103\u0219i momente delicate pentru Sistemul Energetic Na\u021bional, precum cele \u00een care este nevoie, temporar, de un volum mai ridicat al importurilor de energie electric\u0103. Astfel, obiectivul nu trebuie s\u0103 fie doar \u021binta UE, ci c\u00e2t mai mult din capacitatea transfrontalier\u0103\u201d, a explicat George Niculescu.<\/p>\n<h2 id=\"highlight-3935233-2\">Rom\u00e2nia a dep\u0103\u0219it \u021binta UE de interconectare, dar nu \u0219i toate obiectivele privind schimburile de energie<\/h2>\n<p data-index=\"8\">Gradul de interconectare al Rom\u00e2niei a ajuns la 18,5% \u00een 2024, dep\u0103\u0219ind \u021binta european\u0103 de 15%. Acest indicator arat\u0103 raportul dintre capacitatea de schimb transfrontalier \u0219i capacitatea instalat\u0103 de produc\u021bie din \u021bar\u0103.<\/p>\n<p data-index=\"9\">Separat, raportul de monitorizare pentru 2025 arat\u0103 c\u0103 Rom\u00e2nia nu a atins integral, la frontierele cu Ungaria \u0219i Bulgaria, obiectivul privind punerea la dispozi\u021bia comer\u021bului transfrontalier a cel pu\u021bin 70% din capacitatea elementelor critice ale re\u021belei.<\/p>\n<p data-index=\"10\">Din acest motiv, ANRE solicit\u0103 accelerarea lucr\u0103rilor care pot elimina blocajele \u0219i pot cre\u0219te cantitatea de energie care poate fi transferat\u0103 efectiv peste grani\u021b\u0103.<\/p>\n<p data-index=\"11\">Planul urm\u0103re\u0219te racordarea \u0219i integrarea noilor capacit\u0103\u021bi de produc\u021bie \u0219i stocare, precum \u0219i transportarea energiei din zonele cu resurse regenerabile ridicate c\u0103tre marile centre de consum.<\/p>\n<p data-index=\"12\">Investi\u021biile ar trebui s\u0103 reduc\u0103 aglomerarea re\u021belei, s\u0103 ofere mai mult\u0103 flexibilitate produc\u0103torilor, operatorilor de stocare \u0219i consumatorilor \u0219i s\u0103 creasc\u0103 siguran\u021ba sistemului energetic. ANRE sus\u021bine c\u0103 dezvoltarea infrastructurii va permite \u0219i integrarea mai profund\u0103 a Rom\u00e2niei \u00een pia\u021ba european\u0103 de energie, oferind totodat\u0103 mai mult\u0103 predictibilitate investitorilor \u0219i consumatorilor industriali.<\/p>\n<p data-index=\"13\">Planul transpune \u00een proiecte concrete angajamentele asumate de Rom\u00e2nia prin Strategia energetic\u0103 na\u021bional\u0103, Planul na\u021bional integrat \u00een domeniul energiei \u0219i schimb\u0103rilor climatice \u0219i planul european de dezvoltare a re\u021belei pentru urm\u0103torii zece ani.<\/p>\n<p data-index=\"14\">Opt dintre proiectele incluse \u00een document, care reunesc 25 de lucr\u0103ri, sunt proiecte europene de interes comun sau mutual, dezvoltate \u00een cadrul planific\u0103rii coordonate de Re\u021beaua European\u0103 a Operatorilor de Transport \u0219i de Sistem pentru Energie Electric\u0103.<\/p>\n<p data-index=\"15\">Printre acestea se num\u0103r\u0103 interconectarea dintre Rom\u00e2nia \u0219i Ungaria \u0219i proiectul de re\u021bea inteligent\u0103 CARMEN, care presupune folosirea unor tehnologii avansate pentru monitorizarea, automatizarea \u0219i controlul fluxurilor de energie.<\/p>\n<p> Editor : <a href=\"https:\/\/www.digi24.ro\/autor\/andreea-dobra\"> A.D. <\/a><\/p>\n<\/div>\n<p>[analyse_source url=&#8221;https:\/\/www.digi24.ro\/stiri\/economie\/energie\/anre-a-aprobat-planul-de-investitii-al-transelectrica-pana-in-2035-si-cere-urgentarea-legaturilor-cu-ungaria-si-bulgaria-3935233&#8243;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/s.iw.ro\/gateway\/g\/ZmlsZVNvdXJjZT1odHRwJTNBJTJGJTJG\/c3RvcmFnZTA3dHJhbnNjb2Rlci5yY3Mt\/cmRzLnJvJTJGc3RvcmFnZSUyRjIwMTcl\/MkYwMSUyRjEzJTJGNzI4ODc3XzcyODg3\/N190cmFuc2VsZWN0cmljYS5qcGcmdz0x\/MjAwJmg9NjMwJnpjPTEmaGFzaD1mZDE5\/N2Q2ZjU0Y2I0NTMxOTQwY2MwNzU5OTc5YmJmYQ==.thumb.jpg&#8221;] Autoritatea Na\u021bional\u0103 de Reglementare \u00een Domeniul Energiei (ANRE) a aprobat planul Transelectrica pentru dezvoltarea re\u021belei electrice de transport \u00een perioada 2026-2035. Documentul cuprinde 117 lucr\u0103ri de investi\u021bii, iar compania trebuie s\u0103 prezinte, \u00een termen de 30 de zile, un program pentru accelerarea proiectelor nefinalizate care contribuie la cre\u0219terea capacit\u0103\u021bii de schimb al [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[226,11],"class_list":["post-2128094","post","type-post","status-publish","format-standard","hentry","category-romania","tag-crawlmanager","tag-digi24"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2128094","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2128094"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2128094\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2128094"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2128094"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2128094"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}