{"id":2123802,"date":"2026-09-02T06:49:45","date_gmt":"2026-09-02T03:49:45","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=2123802"},"modified":"2026-09-02T06:49:45","modified_gmt":"2026-09-02T03:49:45","slug":"cum-se-imparte-avansul-de-25-miliarde-de-euro-din-safe-guvernul-anunta-cine-are-acces-la-bani","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=2123802","title":{"rendered":"Cum se \u00eemparte avansul de 2,5 miliarde de euro din SAFE. Guvernul anun\u021b\u0103 cine are acces la bani"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/s.iw.ro\/gateway\/g\/ZmlsZVNvdXJjZT1odHRwJTNBJTJGJTJG\/c3RvcmFnZTA4dHJhbnNjb2Rlci5yY3Mt\/cmRzLnJvJTJGc3RvcmFnZSUyRjIwMjYl\/MkYwOSUyRjAyJTJGMjkzNDcxNV8yOTM0\/NzE1X1kyVmtZak15TUdWaVl6TTBZelEy\/TkRnM016azJNamhoWmpRMU16WTNaR01f\/dGh1bWJfLmpwZyZ3PTEyMDAmaD02MzAm\/emM9MSZoYXNoPTU3ODQwM2RjYzc1OTI0MjNiODk5Y2UzZjU0OGY4NDU4.thumb.jpg&#8221;]<\/p>\n<div class=\"entry data-app-meta data-app-meta-article\" data-embed-base-url-canonical=\"https:\/\/www.digi24.ro\/embed\/stiri\/actualitate\/politica\/cum-se-imparte-avansul-de-25-miliarde-de-euro-din-safe-guvernul-anunta-cine-are-acces-la-bani-3931507\">\n<p data-index=\"1\"><strong>Avansul de 2,5 miliarde de euro din programul SAFE nu va fi distribuit automat c\u0103tre cele 35 de proiecte din planul de investi\u0163ii al Rom\u00e2niei, au anun\u021bar miercuri reprezentan\u0163ii Guvernului. Pl\u0103\u0163ile se vor face \u00een func\u0163ie de stadiul de implementare al fiec\u0103rui proiect \u015fi de derularea procedurilor \u015fi contractelor de achizi\u0163ie de c\u0103tre institu\u0163iile responsabile.<\/strong><\/p>\n<p data-index=\"2\">Viteza cu care vor face achizi\u0163iile sau vor realiza investi\u0163iile este principalul criteriu de acces la prima tran\u015f\u0103, de 2,5 miliarde de euro, primit\u0103 de Rom\u00e2nia \u00een cadrul <a href=\"https:\/\/www.digi24.ro\/stiri\/economie\/rezervele-valutare-ale-bnr-au-crescut-la-649-miliarde-de-euro-in-august-intrarile-au-inclus-25-miliarde-de-euro-din-safe-3930331\" target=\"_blank\" rel=\"noopener\" data-skip-linkfix=\"1\">programului de ap\u0103rare<\/a> \u201eAc\u0163iunea pentru securitatea Europei\u201d (SAFE). Transmi\u015fi pe 26 august, banii reprezint\u0103 15 % din alocarea total\u0103 de 16,7 miliarde EUR.<\/p>\n<p data-index=\"3\">Planul include 35 de proiecte iar aproximativ trei sferturi din valoare are drept scop achizi\u0163ia de echipamente militare, ordine public\u0103 \u015fi ap\u0103rare civil\u0103. Diferen\u0163a de 25% vizeaz\u0103 infrastructura de transport rutier de interes national, de exemplu conectarea Moldovei la marile coridoare europene, precum Pa\u015fcani\u2013Suceava\u2013Siret \u015fi T\u00e2rgu Neam\u0163\u2013Ia\u015fi\u2013Ungheni.<\/p>\n<p>\u201eFinan\u0163area efectiv\u0103 a proiectelor nu se realizeaz\u0103 prin distribuirea automat\u0103 a prefinan\u0163\u0103rii de 2,5 miliarde de euro c\u0103tre companii\u201d, a transmis pentru News.ro Direc\u0163ia Comunicare \u015fi Rela\u0163ii cu Presa de la Cancelaria Prim-Ministrului. Explica\u0163ia vine ca r\u0103spuns la \u00eentrebarea referitoare la companiile, sumele defalcate \u015fi investi\u0163iile ori proiectele punctuale care vor beneficia de aceast\u0103 prim\u0103 tran\u015f\u0103.<\/p>\n<h2 id=\"highlight-3931507-1\">Cum se \u00eempart banii<\/h2>\n<p data-index=\"4\">Conform mecanismului, contractele de achizi\u0163ii din Planul SAFE sunt finan\u0163ate de institu\u0163iile responsabile cu implementarea acestora din creditele alocate de la bugetul de stat.<\/p>\n<p>\u201eCheltuielile astfel efectuate pe durata implement\u0103rii Planului, p\u00e2n\u0103 la 31 decembrie 2030, cu respectarea legisla\u0163iei \u00een vigoare stau la baza justific\u0103rii sumelor \u00eemprumutului. \u00cen consecin\u0163\u0103, nu exist\u0103 o defalcare a prefinan\u0163\u0103rii de 2,5 miliarde de euro pe companii \u015fi investi\u0163ii punctuale. Beneficiarii contractuali \u015fi pl\u0103\u0163ile aferente rezult\u0103 din implementarea fiec\u0103rui proiect \u015fi din derularea procedurilor \u015fi contractelor de achizi\u0163ie de c\u0103tre institu\u0163iile responsabile\u201d, a mai a transmis pentru News.ro Direc\u0163ia Comunicare \u015fi Rela\u0163ii cu Presa de la Cancelaria Prim-Ministrului.<\/p>\n<p>\u201eFinan\u0163area total\u0103 nu este \u00eens\u0103 acordat\u0103 integral \u015fi necondi\u0163ionat de la \u00eenceput\u201d, arat\u0103 \u015fi Ministerul Finan\u0163elor (MF) \u00eentr-un comunicat de pres\u0103 publicat pe 26 august, data ob\u0163inerii avansului de 2,5 miliarde de euro.<\/p>\n<p>\u201eSumele SAFE sunt puse la dispozi\u0163ia Rom\u00e2niei \u00een tran\u015fe, iar accesarea lor este legat\u0103 de \u00eendeplinirea unor jaloane asociate proiectelor \u015fi achizi\u0163iilor asumate prin Planul de investi\u0163ii.<br \/>Acest mecanism ofer\u0103 Rom\u00e2niei at\u00e2t acces la finan\u0163are, c\u00e2t \u015fi o disciplin\u0103 clar\u0103 de implementare: proiectele trebuie s\u0103 avanseze conform calendarului \u015fi angajamentelor asumate pentru ca urm\u0103toarele tran\u015fe s\u0103 poat\u0103 fi accesate\u201d, explic\u0103 reprezentan\u0163ii MF.<\/p>\n<p>Ministerul Finan\u0163elor va gestiona fondurile acordate Rom\u00e2niei prin SAFE. Coordonarea general\u0103 a Planului revine Cancelariei Prim-Ministrului iar institu\u0163iile beneficiare \u2013 \u00eentre care Ministerul Ap\u0103r\u0103rii Na\u0163ionale, Ministerul Afacerilor Interne \u015fi Ministerul Transporturilor \u015fi Infrastructurii \u2013 r\u0103spund de implementarea proiectelor \u015fi achizi\u0163iilor din domeniile lor.<\/p>\n<p>\u201eSAFE ne permite s\u0103 r\u0103spundem simultan mai multor nevoi strategice: s\u0103 cre\u015ftem capacitatea de ap\u0103rare a Rom\u00e2niei, s\u0103 dezvolt\u0103m industria \u015fi tehnologia din sectoarele de securitate \u015fi s\u0103 acceler\u0103m infrastructura esen\u0163ial\u0103. Dar accesul la finan\u0163are vine \u015fi cu o responsabilitate foarte clar\u0103. Fiecare tran\u015f\u0103 urm\u0103toare depinde de \u00eendeplinirea jaloanelor asumate. Trebuie s\u0103 transform\u0103m aceste resurse \u00een proiecte realizate, contracte implementate \u015fi investi\u0163ii care r\u0103m\u00e2n \u00een economia Rom\u00e2niei\u201d, a declarat ministrul Finan\u0163elor, Alexandru Nazare.<\/p>\n<p>Reprezentan\u0163ii Comisiei Europene arat\u0103 c\u0103 \u201eprefinan\u0163area va ajuta Rom\u00e2nia s\u0103 accelereze investi\u0163iile prioritare \u00een domeniul ap\u0103r\u0103rii, s\u0103 \u00ee\u015fi \u00eent\u0103reasc\u0103 rezilien\u0163a \u015fi s\u0103 \u00ee\u015fi modernizeze capabilit\u0103\u0163ile militare \u00een conformitate cu obiectivele europene comune\u201d. Accesarea celor 16,7 miliarde de euro nu se va face necondi\u0163ionat, avertizeaz\u0103 ei.<\/p>\n<p>\u201eVor urma \u015fi alte pl\u0103\u0163i, pe m\u0103sur\u0103 ce sunt \u00eendeplinite jaloanele convenite \u015fi implementarea\u201d, au transmis reprezentan\u0163ii Comisiei Europene.<\/p>\n<p> Editor : <a href=\"https:\/\/www.digi24.ro\/autor\/claudia-bancas\"> C.L.B. <\/a><\/p>\n<\/div>\n<p>[analyse_source url=&#8221;https:\/\/www.digi24.ro\/stiri\/actualitate\/politica\/cum-se-imparte-avansul-de-25-miliarde-de-euro-din-safe-guvernul-anunta-cine-are-acces-la-bani-3931507&#8243;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/s.iw.ro\/gateway\/g\/ZmlsZVNvdXJjZT1odHRwJTNBJTJGJTJG\/c3RvcmFnZTA4dHJhbnNjb2Rlci5yY3Mt\/cmRzLnJvJTJGc3RvcmFnZSUyRjIwMjYl\/MkYwOSUyRjAyJTJGMjkzNDcxNV8yOTM0\/NzE1X1kyVmtZak15TUdWaVl6TTBZelEy\/TkRnM016azJNamhoWmpRMU16WTNaR01f\/dGh1bWJfLmpwZyZ3PTEyMDAmaD02MzAm\/emM9MSZoYXNoPTU3ODQwM2RjYzc1OTI0MjNiODk5Y2UzZjU0OGY4NDU4.thumb.jpg&#8221;] Avansul de 2,5 miliarde de euro din programul SAFE nu va fi distribuit automat c\u0103tre cele 35 de proiecte din planul de investi\u0163ii al Rom\u00e2niei, au anun\u021bar miercuri reprezentan\u0163ii Guvernului. Pl\u0103\u0163ile se vor face \u00een func\u0163ie de stadiul de implementare al fiec\u0103rui proiect \u015fi de derularea procedurilor \u015fi contractelor de achizi\u0163ie de [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[226,11],"class_list":["post-2123802","post","type-post","status-publish","format-standard","hentry","category-romania","tag-crawlmanager","tag-digi24"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2123802","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2123802"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2123802\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2123802"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2123802"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2123802"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}