{"id":2117267,"date":"2026-08-28T11:43:49","date_gmt":"2026-08-28T08:43:49","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=2117267"},"modified":"2026-08-28T11:43:49","modified_gmt":"2026-08-28T08:43:49","slug":"presedintele-cj-suceava-castigatorul-licitatiei-pentru-centura-gura-humorului-ar-urma-sa-fie-desemnat-pana-la-sfarsitul-lunii-septembrie","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=2117267","title":{"rendered":"Pre\u0219edintele CJ Suceava: \u201eC\u00e2\u0219tig\u0103torul licita\u021biei pentru centura Gura Humorului ar urma s\u0103 fie desemnat p\u00e2n\u0103 la sf\u00e2r\u0219itul lunii septembrie\u201d"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/img.svnews.ro\/foto\/2025\/07\/23\/0efc9002e3ce9787622e8aae6.jpeg&#8221;]<\/p>\n<div class=\"entry\"><img loading=\"lazy\" decoding=\"async\" width=\"650\" height=\"325\" src=\"https:\/\/img.svnews.ro\/foto\/2025\/07\/23\/0efc9002e3ce9787622e8aae606500325.jpeg\" alt><\/p>\n<div class=\"entry_content\">\n<p>Pre\u0219edintele Consiliului Jude\u021bean Suceava, Gheorghe \u0218oldan, anun\u021b\u0103 c\u0103 procedura de licita\u021bie pentru varianta ocolitoare a ora\u0219ului Gura Humorului a intrat \u00een etapa de evaluare a ofertelor financiare, iar c\u00e2\u0219tig\u0103torul ar putea fi desemnat dup\u0103 15 septembrie, p\u00e2n\u0103 la finalul lunii. El a amintit c\u0103 proiectul variantei ocolitoare de la Gura Humorului, estimat la aproximativ 160 de milioane de euro \u0219i se afl\u0103 \u00een prezent \u00een procedura de evaluare a ofertelor financiare. Potrivit pre\u0219edintelui Consiliului Jude\u021bean Suceava, peste 130 de operatori economici s-au \u00eenscris la licita\u021bie, iar procedura a fost \u00eent\u00e2rziat\u0103 de o contesta\u021bie depus\u0103 la Consiliul Na\u021bional de Solu\u021bionare a Contesta\u021biilor (CNSC) de o companie din China. Gheorghe \u0218oldan a precizat c\u0103 CNSC a respins contesta\u021bia, d\u00e2nd c\u00e2\u0219tig de cauz\u0103 autorit\u0103\u021bii jude\u021bene, \u00eens\u0103 demersul a dus la \u00eent\u00e2rzierea procedurii. \u201eDin p\u0103cate, n-au reu\u0219it dec\u00e2t s\u0103 ne blocheze ca \u0219i timp p\u00e2n\u0103 \u00een acest moment\u201d, a declarat \u0218oldan.<\/p>\n<p>El sus\u021bine c\u0103 institu\u021bia analizeaz\u0103, \u00eempreun\u0103 cu juri\u0219tii, posibilitatea elabor\u0103rii unei documenta\u021bii prin care companiile care formuleaz\u0103 contesta\u021bii nejustificate s\u0103 suporte costurile generate de \u00eent\u00e2rzierea proiectelor. \u201eLucr\u0103m la o parte din documenta\u021bie, ca pe viitor, anumite firme care contest\u0103 licita\u021biile sau blocheaz\u0103 licita\u021biile, f\u0103r\u0103 un motiv anume dec\u00e2t doar pentru a \u00eent\u00e2rzia procedurile, s\u0103 pl\u0103teasc\u0103 timpul pentru care a fost blocat un proiect\u201d, a explicat \u0218oldan.<\/p>\n<p>\u00cen ceea ce prive\u0219te proiectul de la Gura Humorului, \u0219eful administra\u021biei jude\u021bene estimeaz\u0103 c\u0103 desemnarea c\u00e2\u0219tig\u0103torului ar putea avea loc dup\u0103 data de 15 septembrie, cel t\u00e2rziu p\u00e2n\u0103 la sf\u00e2r\u0219itul aceleia\u0219i luni. \u201eVestea bun\u0103 pentru jude\u021bul Suceava e c\u0103 suntem \u00een evaluarea ofertelor. Asta \u00eenseamn\u0103 c\u0103 dup\u0103 15 septembrie p\u00e2n\u0103 la finalul lunii septembrie vom desemna c\u00e2\u0219tig\u0103torul proiectului variantei ocolitoare de la Gura Humorului\u201d, a spus pre\u0219edintele CJ Suceava. Contractul prevede at\u00e2t proiectarea, c\u00e2t \u0219i execu\u021bia lucr\u0103rilor, cu o durat\u0103 de 24 de luni. El sper\u0103 ca lucr\u0103rile s\u0103 poat\u0103 \u00eencepe \u00een acest an \u0219i ca investi\u021bia s\u0103 fie finalizat\u0103 p\u00e2n\u0103 \u00een 2028. \u201eA\u0219a cum am promis, am deblocat un proiect blocat zeci de ani de zile \u0219i sper\u0103m c\u0103 vom reu\u0219i s\u0103-l finaliz\u0103m p\u00e2n\u0103 \u00een 2028\u201d, a afirmat Gheorghe \u0218oldan. Pre\u0219edintele CJ Suceava a subliniat c\u0103 proiectul este unul important pentru jude\u021b, \u00een condi\u021biile \u00een care procedurile pentru realizarea variantei ocolitoare de la Gura Humorului au avansat cu dificultate. El a mai spus c\u0103 procedura de licita\u021bie a fost lansat\u0103 \u00een decembrie 2025, iar la aproape nou\u0103 luni distan\u021b\u0103 autorit\u0103\u021bile se afl\u0103 \u00een etapa de evaluare a ofertelor \u0219i se preg\u0103tesc pentru desemnarea c\u00e2\u0219tig\u0103torului.<\/p>\n<\/div>\n<div>\n<div>VN:F [1.9.22_1171]<\/div>\n<div class=\"ratingblock \">\n<div class=\"ratingstars \">\n<div id=\"article_loader_556404\" class=\"ratingloaderarticle\">\n<div class=\"loader arrows \">\n<div class=\"loaderinner\">se actualizeaz\u0103&#8230;<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"ratingtext \">\n<div id=\"gdr_text_a556404\">Rating: 0.0\/<strong>10<\/strong> (0 votes cast)<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"entry_content\">\n<p>Pre\u0219edintele Consiliului Jude\u021bean Suceava, Gheorghe \u0218oldan, anun\u021b\u0103 c\u0103 procedura de licita\u021bie pentru varianta ocolitoare a ora\u0219ului Gura Humorului a intrat \u00een etapa de evaluare a ofertelor financiare, iar c\u00e2\u0219tig\u0103torul ar putea fi desemnat dup\u0103 15 septembrie, p\u00e2n\u0103 la finalul lunii. El a amintit c\u0103 proiectul variantei ocolitoare de la Gura Humorului, estimat la aproximativ 160 de milioane de euro \u0219i se afl\u0103 \u00een prezent \u00een procedura de evaluare a ofertelor financiare. Potrivit pre\u0219edintelui Consiliului Jude\u021bean Suceava, peste 130 de operatori economici s-au \u00eenscris la licita\u021bie, iar procedura a fost \u00eent\u00e2rziat\u0103 de o contesta\u021bie depus\u0103 la Consiliul Na\u021bional de Solu\u021bionare a Contesta\u021biilor (CNSC) de o companie din China. Gheorghe \u0218oldan a precizat c\u0103 CNSC a respins contesta\u021bia, d\u00e2nd c\u00e2\u0219tig de cauz\u0103 autorit\u0103\u021bii jude\u021bene, \u00eens\u0103 demersul a dus la \u00eent\u00e2rzierea procedurii. \u201eDin p\u0103cate, n-au reu\u0219it dec\u00e2t s\u0103 ne blocheze ca \u0219i timp p\u00e2n\u0103 \u00een acest moment\u201d, a declarat \u0218oldan.<\/p>\n<p>El sus\u021bine c\u0103 institu\u021bia analizeaz\u0103, \u00eempreun\u0103 cu juri\u0219tii, posibilitatea elabor\u0103rii unei documenta\u021bii prin care companiile care formuleaz\u0103 contesta\u021bii nejustificate s\u0103 suporte costurile generate de \u00eent\u00e2rzierea proiectelor. \u201eLucr\u0103m la o parte din documenta\u021bie, ca pe viitor, anumite firme care contest\u0103 licita\u021biile sau blocheaz\u0103 licita\u021biile, f\u0103r\u0103 un motiv anume dec\u00e2t doar pentru a \u00eent\u00e2rzia procedurile, s\u0103 pl\u0103teasc\u0103 timpul pentru care a fost blocat un proiect\u201d, a explicat \u0218oldan.<\/p>\n<p>\u00cen ceea ce prive\u0219te proiectul de la Gura Humorului, \u0219eful administra\u021biei jude\u021bene estimeaz\u0103 c\u0103 desemnarea c\u00e2\u0219tig\u0103torului ar putea avea loc dup\u0103 data de 15 septembrie, cel t\u00e2rziu p\u00e2n\u0103 la sf\u00e2r\u0219itul aceleia\u0219i luni. \u201eVestea bun\u0103 pentru jude\u021bul Suceava e c\u0103 suntem \u00een evaluarea ofertelor. Asta \u00eenseamn\u0103 c\u0103 dup\u0103 15 septembrie p\u00e2n\u0103 la finalul lunii septembrie vom desemna c\u00e2\u0219tig\u0103torul proiectului variantei ocolitoare de la Gura Humorului\u201d, a spus pre\u0219edintele CJ Suceava. Contractul prevede at\u00e2t proiectarea, c\u00e2t \u0219i execu\u021bia lucr\u0103rilor, cu o durat\u0103 de 24 de luni. El sper\u0103 ca lucr\u0103rile s\u0103 poat\u0103 \u00eencepe \u00een acest an \u0219i ca investi\u021bia s\u0103 fie finalizat\u0103 p\u00e2n\u0103 \u00een 2028. \u201eA\u0219a cum am promis, am deblocat un proiect blocat zeci de ani de zile \u0219i sper\u0103m c\u0103 vom reu\u0219i s\u0103-l finaliz\u0103m p\u00e2n\u0103 \u00een 2028\u201d, a afirmat Gheorghe \u0218oldan. Pre\u0219edintele CJ Suceava a subliniat c\u0103 proiectul este unul important pentru jude\u021b, \u00een condi\u021biile \u00een care procedurile pentru realizarea variantei ocolitoare de la Gura Humorului au avansat cu dificultate. El a mai spus c\u0103 procedura de licita\u021bie a fost lansat\u0103 \u00een decembrie 2025, iar la aproape nou\u0103 luni distan\u021b\u0103 autorit\u0103\u021bile se afl\u0103 \u00een etapa de evaluare a ofertelor \u0219i se preg\u0103tesc pentru desemnarea c\u00e2\u0219tig\u0103torului.<\/p>\n<\/div>\n<p>[analyse_source url=&#8221;https:\/\/www.svnews.ro\/presedintele-cj-suceava-castigatorul-licitatiei-pentru-centura-gura-humorului-ar-urma-sa-fie-desemnat-pana-la-sfarsitul-lunii-septembrie\/556404\/&#8221;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/img.svnews.ro\/foto\/2025\/07\/23\/0efc9002e3ce9787622e8aae6.jpeg&#8221;] Pre\u0219edintele Consiliului Jude\u021bean Suceava, Gheorghe \u0218oldan, anun\u021b\u0103 c\u0103 procedura de licita\u021bie pentru varianta ocolitoare a ora\u0219ului Gura Humorului a intrat \u00een etapa de evaluare a ofertelor financiare, iar c\u00e2\u0219tig\u0103torul ar putea fi desemnat dup\u0103 15 septembrie, p\u00e2n\u0103 la finalul lunii. El a amintit c\u0103 proiectul variantei ocolitoare de la Gura Humorului, estimat [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[226,175],"class_list":["post-2117267","post","type-post","status-publish","format-standard","hentry","category-romania","tag-crawlmanager","tag-svnews-ro"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2117267","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2117267"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2117267\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2117267"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2117267"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2117267"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}