{"id":2111545,"date":"2026-08-24T21:00:00","date_gmt":"2026-08-24T18:00:00","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=2111545"},"modified":"2026-08-24T21:00:00","modified_gmt":"2026-08-24T18:00:00","slug":"cresterea-eficientei-energetice-a-blocurilor-de-locuinte-din-orasul-marasesti-judetul-vrancea-etapa-iii","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=2111545","title":{"rendered":"Cresterea eficien\u021bei energetice a blocurilor de locuin\u021be din ora\u0219ul M\u0103r\u0103\u0219e\u0219ti, Jude\u021bul Vrancea \u2013 etapa III"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/www.monitoruldevrancea.ro\/wp-content\/uploads\/2026\/08\/AddText_07-23-10.52.03-scaled.jpg&#8221;]<\/p>\n<div class=\"td_block_wrap tdb_single_content tdi_123 td-pb-border-top td_block_template_1 td-post-content tagdiv-type\" data-td-block-uid=\"tdi_123\">\n<div class=\"tdb-block-inner td-fix-index\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"331\" src=\"https:\/\/www.monitoruldevrancea.ro\/wp-content\/uploads\/2026\/08\/31901-1024x331.jpg\" alt class=\"wp-image-728419\"><\/figure>\n<p><strong>UAT Ora\u0219ul M\u0103r\u0103\u0219e\u0219ti, jude\u021bul Vrancea<\/strong>, anun\u021b\u0103 finalizarea implement\u0103rii proiectului cu titlul\u00a0 \u201eCre\u0219terea eficien\u021bei energetice a blocurilor de locuin\u021be din ora\u0219ul M\u0103r\u0103\u0219e\u0219ti, Jude\u021bul Vrancea \u2013 etapa III\u201d cod proiect C5-A3.1-415, conform contractului de finan\u021bare nr. 137562\/21.12.2022, din cadrul apelului de proiecte PNRR\/2022\/C5\/1\/A3.1\/1 , Runda 1.<\/p>\n<p><strong>Perioada de implementare:\u00a0<\/strong><\/p>\n<ul class=\"wp-block-list\">\n<li>Dat\u0103 \u00eencepere implementare proiect: 21.12.2022<\/li>\n<li>Dat\u0103 finalizare implementare proiect: 03.11.2025<\/li>\n<\/ul>\n<p><strong>Obiectivul proiectului<\/strong> a constat\u00a0 in cre\u0219terea eficien\u021bei energetice a cl\u0103dirilor reziden\u021biale multifamiliale din ora\u0219ul M\u0103r\u0103\u0219e\u0219ti, jude\u021bul Vrancea, prin realizarea unor lucr\u0103ri de renovare energetic\u0103 moderat\u0103 asupra blocurilor de locuin\u021be B2, B3, B4, situate pe strada E. Grigorescu, precum \u0219i asupra blocului 135, situat pe strada Republicii.Prin implementarea investi\u021biei se urm\u0103re\u0219te \u00eembun\u0103t\u0103\u021birea performan\u021bei energetice a unui fond construit cu o suprafa\u021b\u0103 desf\u0103\u0219urat\u0103 total\u0103 de 2.458 mp, contribuind la modernizarea cl\u0103dirilor reziden\u021biale \u0219i la cre\u0219terea calit\u0103\u021bii acestora.<\/p>\n<p><strong>Impactul proiectului<\/strong>: Implementarea proiectului are un impact pozitiv asupra fondului locativ din ora\u0219ul M\u0103r\u0103\u0219e\u0219ti, prin renovarea energetic\u0103 a celor patru cl\u0103diri reziden\u021biale multifamiliale incluse \u00een investi\u021bie. Lucr\u0103rile au contribuit la cre\u0219terea eficien\u021bei energetice a cl\u0103dirilor, reducerea necesarului de energie pentru exploatarea acestora \u0219i \u00eembun\u0103t\u0103\u021birea condi\u021biilor de confort pentru locatari.Totodat\u0103, proiectul a contribuit la procesul de modernizare \u0219i eficientizare energetic\u0103 a cl\u0103dirilor reziden\u021biale din ora\u0219ul M\u0103r\u0103\u0219e\u0219ti, \u00een concordan\u021b\u0103 cu obiectivele Componentei C5 \u2013 Valul Renov\u0103rii din Planul Na\u021bional de Redresare \u0219i Rezilien\u021b\u0103.<\/p>\n<p><strong>Indicatorii proiectului:<\/strong><\/p>\n<p>Bloc B2: 8 unit\u0103\u021bi locative \u0219i 545 mp construi\u021bi.<\/p>\n<p>Bloc B3: 8 \u00a0unit\u0103\u021bi locative \u0219i 545 mp construi\u021bi.<\/p>\n<p>Bloc B4: 8 unit\u0103\u021bi locative \u0219i 545 mp construi\u021bi.<\/p>\n<p>Bloc 135: 12 de unit\u0103\u021bi locative \u0219i 823 mp construi\u021bi.<\/p>\n<p><strong>Valoarea total\u0103<\/strong> a proiectului este de 3.500.467,59 lei cu TVA. Componenta asisten\u021bei tehnice financiare nerambursabile din cadrul PNRR a fost de 2.419.999,32 lei f\u0103r\u0103 TVA, la care s-a adaugat TVA eligibil \u00een valoare de 459.799,87 lei. Cheltuielile\u00a0\u00a0 neeligibile necesare implement\u0103rii proiectului au fost asigurate de UAT Ora\u0219ul M\u0103r\u0103\u0219e\u0219ti.<\/p>\n<p>Persoan\u0103 de contact:Todera\u0219c Adrian<br \/>E-mail: <a href=\"https:\/\/www.monitoruldevrancea.ro\/cdn-cgi\/l\/email-protection#98e8eaf1f5f9eaf1f9d8e8eaf1f5f9eaf1f9f5f9eaf9ebfdebecf1b6eaf7\"><span class=\"__cf_email__\" data-cfemail=\"b1c1c3d8dcd0c3d8d0f1c1c3d8dcd0c3d8d0dcd0c3d0c2d4c2c5d89fc3de\">[email\u00a0protected]<\/span><\/a><\/p>\n<p>Telefon 0237260150<\/p>\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"320\" src=\"https:\/\/www.monitoruldevrancea.ro\/wp-content\/uploads\/2026\/08\/Screenshot_20260825_160750_Word-1024x320.jpg\" alt class=\"wp-image-728406\"><\/figure>\n<\/div>\n<\/div>\n<p>[analyse_source url=&#8221;https:\/\/www.monitoruldevrancea.ro\/2026\/08\/25\/cresterea-eficientei-energetice-a-blocurilor-de-locuinte-din-orasul-marasesti-judetul-vrancea-etapa-iii-2\/&#8221;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/www.monitoruldevrancea.ro\/wp-content\/uploads\/2026\/08\/AddText_07-23-10.52.03-scaled.jpg&#8221;] UAT Ora\u0219ul M\u0103r\u0103\u0219e\u0219ti, jude\u021bul Vrancea, anun\u021b\u0103 finalizarea implement\u0103rii proiectului cu titlul\u00a0 \u201eCre\u0219terea eficien\u021bei energetice a blocurilor de locuin\u021be din ora\u0219ul M\u0103r\u0103\u0219e\u0219ti, Jude\u021bul Vrancea \u2013 etapa III\u201d cod proiect C5-A3.1-415, conform contractului de finan\u021bare nr. 137562\/21.12.2022, din cadrul apelului de proiecte PNRR\/2022\/C5\/1\/A3.1\/1 , Runda 1. Perioada de implementare:\u00a0 Dat\u0103 \u00eencepere implementare proiect: 21.12.2022 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[226,209],"class_list":["post-2111545","post","type-post","status-publish","format-standard","hentry","category-romania","tag-crawlmanager","tag-monitoruldevrancea-ro"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2111545","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2111545"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2111545\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2111545"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2111545"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2111545"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}