{"id":2105328,"date":"2026-08-21T09:53:18","date_gmt":"2026-08-21T06:53:18","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=2105328"},"modified":"2026-08-21T09:53:18","modified_gmt":"2026-08-21T06:53:18","slug":"reabilitarea-cu-bani-europeni-a-spitalului-din-nehoiu-in-pericol","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=2105328","title":{"rendered":"Reabilitarea cu bani europeni a Spitalului din Nehoiu, \u00een pericol!"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/buzaumedia.ro\/wp-content\/uploads\/2026\/08\/spital-2.jpghttps:\/\/buzaumedia.ro\/wp-content\/uploads\/2026\/08\/spital-2.jpg&#8221;]<\/p>\n<div class=\"entry-content rbct clearfix is-highlight-shares\">\n<p>O investi\u021bie important\u0103 derulat\u0103, \u00een jude\u021bul Buz\u0103u, cu bani prin<br \/>\nPlanul Na\u021bional de Redresare \u0219i Rezilien\u021b\u0103, se afl\u0103 \u00eentr-un punct<br \/>\ncritic. Este vorba despre proiectul de reabilitare a Spitalului<br \/>\nOr\u0103\u0219enesc Nehoiu, o investi\u021bie de peste 24 de milioane de lei<br \/>\nfinan\u021bat\u0103 prin PNRR. De\u0219i lucr\u0103rile din teren au ajuns la un stadiu<br \/>\nfizic de 85%, o eroare de interpretare a termenelui de finalizare a<br \/>\nlucr\u0103rilor pune \u00een pericol \u00eentreaga finan\u021bare europen\u0103.<br \/>\nMai pr\u00e9cis, de\u0219i termenul de finalizare ar fi trebuit s\u0103 fie 31<br \/>\naugust, pentru a nu pierde banii europeni, constructorii credeau c\u0103<br \/>\nlucr\u0103rile trebuie finalizate p\u00e2n\u0103 la 31 decembrie. \u00cen aceste condi\u021bii,<br \/>\nf\u0103r\u0103 o solu\u021bie administrativ\u0103 de urgen\u021b\u0103 aplicat\u0103 p\u00e2n\u0103 la finalul<br \/>\nacestei luni, Prim\u0103ria Nehoiu risc\u0103 nu doar s\u0103 piard\u0103 diferen\u021ba de<br \/>\nbani, ci \u0219i s\u0103 fie obligat\u0103 s\u0103 restituie \u0219i banii \u00eencasa\u021bi p\u00e2n\u0103 \u00een<br \/>\nprezent.<br \/>\nSitua\u021bia a fost analizat\u0103 la Prefectura Buz\u0103u, iar singura solu\u021bie<br \/>\ng\u0103sit\u0103 vizeaz\u0103 \u00eenc\u0103rcarea rapid\u0103 \u00een platforma electronic\u0103 a unui<br \/>\nproces-verbal de recep\u021bie par\u021bial\u0103 p\u00e2n\u0103 la sf\u00e2r\u0219itul acestei luni.<br \/>\nAstfel, structura principal\u0103 a spitalului ar putea fi recep\u021bionat\u0103,<br \/>\nurm\u00e2nd a se acorda un termen extins, de p\u00e2n\u0103 la 120 de zile, pentru<br \/>\najust\u0103rile finale, f\u0103r\u0103 pierderea fondurilor.<br \/>\nValoarea total\u0103 a proiectului de reabilitare a Spitalului Or\u0103\u0219enesc<br \/>\neste de 24,3 milioane de lei, iar Prim\u0103ria Nehoiu a atras deja din<br \/>\nfonduri europene suma de 20,7 milioane de lei.<\/p>\n<div id=\"gallery-1\" class=\"gallery galleryid-189204 gallery-columns-3 gallery-size-thumbnail\">\n<figure class=\"gallery-item\">\n<div class=\"gallery-icon landscape\"><a href=\"https:\/\/buzaumedia.ro\/stiri-buzau\/fwd-reabilitarea-cu-bani-europeni-a-spitalului-din-nehoiu-in-pericol\/attachment\/spital-2-4\/\"><img loading=\"lazy\" decoding=\"async\" width=\"128\" height=\"96\" src=\"https:\/\/buzaumedia.ro\/wp-content\/uploads\/2026\/08\/spital-2.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt><img decoding=\"async\" loading=\"lazy\" width=\"128\" height=\"96\" src=\"https:\/\/buzaumedia.ro\/wp-content\/uploads\/2026\/08\/spital-2.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt><\/a><\/div>\n<\/figure>\n<\/div>\n<\/div>\n<p>[analyse_source url=&#8221;https:\/\/buzaumedia.ro\/stiri-buzau\/fwd-reabilitarea-cu-bani-europeni-a-spitalului-din-nehoiu-in-pericol\/&#8221;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/buzaumedia.ro\/wp-content\/uploads\/2026\/08\/spital-2.jpghttps:\/\/buzaumedia.ro\/wp-content\/uploads\/2026\/08\/spital-2.jpg&#8221;] O investi\u021bie important\u0103 derulat\u0103, \u00een jude\u021bul Buz\u0103u, cu bani prin Planul Na\u021bional de Redresare \u0219i Rezilien\u021b\u0103, se afl\u0103 \u00eentr-un punct critic. Este vorba despre proiectul de reabilitare a Spitalului Or\u0103\u0219enesc Nehoiu, o investi\u021bie de peste 24 de milioane de lei finan\u021bat\u0103 prin PNRR. De\u0219i lucr\u0103rile din teren au ajuns la un stadiu [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[66,226],"class_list":["post-2105328","post","type-post","status-publish","format-standard","hentry","category-politics","tag-buzaumedia-ro","tag-crawlmanager"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2105328","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2105328"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2105328\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2105328"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2105328"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2105328"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}