{"id":2104089,"date":"2026-08-20T12:03:59","date_gmt":"2026-08-20T09:03:59","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=2104089"},"modified":"2026-08-20T12:03:59","modified_gmt":"2026-08-20T09:03:59","slug":"foto-lucrari-pe-calea-ferata-timisoara-lugoj-inainte-de-redeschidere","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=2104089","title":{"rendered":"FOTO. Lucr\u0103ri pe calea ferat\u0103 Timi\u0219oara \u2013 Lugoj, \u00eenainte de redeschidere"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/www.banatulazi.ro\/wp-content\/uploads\/2026\/08\/779201220_1092822219765321_2847915592239884817_n.jpg&#8221;]<\/p>\n<div class=\"td_block_wrap tdb_single_content tdi_64 td-pb-border-top td_block_template_1 td-post-content tagdiv-type\" data-td-block-uid=\"tdi_64\">\n<div class=\"tdb-block-inner td-fix-index\">\n<p><strong>Lucr\u0103rile de modernizare a tronsonului de cale ferat\u0103 dintre Timi\u0219oara Est \u0219i Lugoj intr\u0103 \u00een ultima etap\u0103 \u00eenaintea redeschiderii circula\u021biei feroviare. Trenurile sunt programate s\u0103 revin\u0103 pe traseu la sf\u00e2r\u0219itul lunii august, dup\u0103 aproape trei luni \u00een care traficul a fost suspendat pentru interven\u021bii complexe la infrastructur\u0103.<\/strong><\/p>\n<p>Pe \u0219antierul feroviar dintre Timi\u0219oara \u0219i Lugoj se lucreaz\u0103 \u00een continuare la infrastructura care face parte din proiectul de modernizare a liniei feroviare Caransebe\u0219 \u2013 Timi\u0219oara \u2013 Arad, Lotul 2 Lugoj \u2013 Timi\u0219oara Est.<\/p>\n<p>Circula\u021bia trenurilor \u00eentre cele dou\u0103 sta\u021bii a fost suspendat\u0103 \u00eencep\u00e2nd cu 2 iunie, pentru ca lucr\u0103rile s\u0103 poat\u0103 fi executate \u00eentr-un ritm mai rapid \u0219i f\u0103r\u0103 traficul feroviar obi\u0219nuit. CFR C\u0103l\u0103tori a anun\u021bat atunci mai multe modific\u0103ri de trasee, anul\u0103ri \u0219i transbord\u0103ri auto.<\/p>\n<h2>Calea ferat\u0103, \u00een lucru \u00eenainte de redeschidere<\/h2>\n<p>Imaginile de pe \u0219antier surprind muncitorii \u0219i utilajele care lucreaz\u0103 la noua infrastructur\u0103 feroviar\u0103. Sunt executate interven\u021bii la terasamente, la suprastructura c\u0103ii ferate \u0219i \u00een zonele \u00een care este ref\u0103cut\u0103 configura\u021bia liniilor.<\/p>\n<p>Lucr\u0103rile fac parte dintr-un proiect amplu de modernizare a coridorului feroviar Caransebe\u0219 \u2013 Timi\u0219oara \u2013 Arad. Lotul Lugoj \u2013 Timi\u0219oara Est urm\u0103re\u0219te modernizarea infrastructurii \u0219i cre\u0219terea vitezei \u0219i capacit\u0103\u021bii de circula\u021bie.<\/p>\n<p>O parte dintre lucr\u0103rile de pe acest lot au fost deja finalizate. \u00cen februarie, CFR a anun\u021bat deschiderea circula\u021biei pe aproximativ 10 kilometri de cale ferat\u0103 modernizat\u0103 \u00een zona sta\u021biei Topolov\u0103\u021b, inclusiv pe firul II \u0219i pe liniile 3 \u0219i 4 din sta\u021bie.<\/p>\n<h2>Trenurile ar urma s\u0103 revin\u0103 pe traseu la 31 august<\/h2>\n<p>Suspendarea circula\u021biei \u00eentre Lugoj \u0219i Timi\u0219oara Est a fost anun\u021bat\u0103 pentru perioada 2 iunie \u2013 31 august 2026.<\/p>\n<p>\u00cen aceast\u0103 perioad\u0103, mai multe trenuri au circulat pe trasee modificate. Unele garnituri au fost anulate pe anumite por\u021biuni, iar pentru altele c\u0103l\u0103torii au fost transporta\u021bi cu mijloace auto.<\/p>\n<p>Printre trenurile afectate s-au num\u0103rat \u0219i garniturile interna\u021bionale Bucure\u0219ti Nord \u2013 Budapesta, care au avut trasee modificate pe rela\u021bia cu Timi\u0219oara.<\/p>\n<p>Dac\u0103 lucr\u0103rile se \u00eencheie conform calendarului anun\u021bat, 31 august este data la care circula\u021bia feroviar\u0103 dintre Timi\u0219oara Est \u0219i Lugoj ar urma s\u0103 fie reluat\u0103.<\/p>\n<h2>Un proiect pentru modernizarea c\u0103ii ferate din vestul \u021b\u0103rii<\/h2>\n<p>Modernizarea Lotului 2 Lugoj \u2013 Timi\u0219oara Est face parte din proiectul mai amplu de modernizare a liniei feroviare Caransebe\u0219 \u2013 Timi\u0219oara \u2013 Arad.<\/p>\n<p>Investi\u021bia urm\u0103re\u0219te \u00eembun\u0103t\u0103\u021birea infrastructurii, cre\u0219terea vitezei de circula\u021bie \u0219i a capacit\u0103\u021bii de transport, precum \u0219i sporirea nivelului de siguran\u021b\u0103 pe acest coridor feroviar.<\/p>\n<p>Pentru c\u0103l\u0103torii care circul\u0103 \u00eentre Timi\u0219oara \u0219i Lugoj, redeschiderea tronsonului va \u00eensemna revenirea trenurilor pe ruta direct\u0103, dup\u0103 perioada \u00een care lucr\u0103rile au impus modific\u0103ri importante \u00een transportul feroviar.<\/p>\n<div id=\"tdi_65\" class=\"td-gallery td-slide-on-2-columns\">\n<div class=\"post_td_gallery\">\n<div class=\"td-gallery-slide-top\">\n<div class=\"td-gallery-title\">FOTO. Lucr\u0103ri pe calea ferat\u0103 Timi\u0219oara \u2013 Lugoj, \u00eenainte de redeschidere<\/div>\n<div class=\"td-gallery-controls-wrapper\">\n<div class=\"td-gallery-slide-count\"><span class=\"td-gallery-slide-item-focus\">1<\/span> de 4<\/div>\n<\/div>\n<\/div>\n<div class=\"td-doubleSlider-1 \">\n<div class=\"td-slider\">\n<div class=\"td-slide-item td-item1\">\n<figure class=\"td-slide-galery-figure td-slide-popup-gallery\"><a class=\"slide-gallery-image-link\" href=\"https:\/\/www.banatulazi.ro\/wp-content\/uploads\/2026\/08\/778401228_1092822309765312_7105453824437372383_n.jpg\" title=\"778401228_1092822309765312_7105453824437372383_n\" data-caption=\"FOTO: Buletin de Timi\u0219oara\" data-description><img decoding=\"async\" src=\"https:\/\/www.banatulazi.ro\/wp-content\/uploads\/2026\/08\/778401228_1092822309765312_7105453824437372383_n-630x420.jpg\" alt><\/a><figcaption class=\"td-slide-caption td-gallery-slide-content\">\n<div class=\"td-gallery-slide-copywrite\">FOTO: Buletin de Timi\u0219oara<\/div>\n<\/figcaption><\/figure>\n<\/div>\n<div class=\"td-slide-item td-item2\">\n<figure class=\"td-slide-galery-figure td-slide-popup-gallery\"><a class=\"slide-gallery-image-link\" href=\"https:\/\/www.banatulazi.ro\/wp-content\/uploads\/2026\/08\/782344995_1092822396431970_5768048172523445044_n.jpg\" title=\"782344995_1092822396431970_5768048172523445044_n\" data-caption=\"FOTO: Buletin de Timi\u0219oara\" data-description><img decoding=\"async\" src=\"https:\/\/www.banatulazi.ro\/wp-content\/uploads\/2026\/08\/782344995_1092822396431970_5768048172523445044_n-630x420.jpg\" alt><\/a><figcaption class=\"td-slide-caption td-gallery-slide-content\">\n<div class=\"td-gallery-slide-copywrite\">FOTO: Buletin de Timi\u0219oara<\/div>\n<\/figcaption><\/figure>\n<\/div>\n<div class=\"td-slide-item td-item3\">\n<figure class=\"td-slide-galery-figure td-slide-popup-gallery\"><a class=\"slide-gallery-image-link\" href=\"https:\/\/www.banatulazi.ro\/wp-content\/uploads\/2026\/08\/780619909_1092822349765308_8422685679203640516_n.jpg\" title=\"780619909_1092822349765308_8422685679203640516_n\" data-caption=\"FOTO: Buletin de Timi\u0219oara\" data-description><img decoding=\"async\" src=\"https:\/\/www.banatulazi.ro\/wp-content\/uploads\/2026\/08\/780619909_1092822349765308_8422685679203640516_n-630x420.jpg\" alt><\/a><figcaption class=\"td-slide-caption td-gallery-slide-content\">\n<div class=\"td-gallery-slide-copywrite\">FOTO: Buletin de Timi\u0219oara<\/div>\n<\/figcaption><\/figure>\n<\/div>\n<div class=\"td-slide-item td-item4\">\n<figure class=\"td-slide-galery-figure td-slide-popup-gallery\"><a class=\"slide-gallery-image-link\" href=\"https:\/\/www.banatulazi.ro\/wp-content\/uploads\/2026\/08\/778985963_1092822279765315_8783952743321693936_n.jpg\" title=\"778985963_1092822279765315_8783952743321693936_n\" data-caption=\"FOTO: Buletin de Timi\u0219oara\" data-description><img decoding=\"async\" src=\"https:\/\/www.banatulazi.ro\/wp-content\/uploads\/2026\/08\/778985963_1092822279765315_8783952743321693936_n-630x420.jpg\" alt><\/a><figcaption class=\"td-slide-caption td-gallery-slide-content\">\n<div class=\"td-gallery-slide-copywrite\">FOTO: Buletin de Timi\u0219oara<\/div>\n<\/figcaption><\/figure>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<p>\u00a0<\/p>\n<\/div>\n<\/div>\n<p>[analyse_source url=&#8221;https:\/\/www.banatulazi.ro\/foto-lucrari-pe-calea-ferata-timisoara-lugoj-inainte-de-redeschidere\/&#8221;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/www.banatulazi.ro\/wp-content\/uploads\/2026\/08\/779201220_1092822219765321_2847915592239884817_n.jpg&#8221;] Lucr\u0103rile de modernizare a tronsonului de cale ferat\u0103 dintre Timi\u0219oara Est \u0219i Lugoj intr\u0103 \u00een ultima etap\u0103 \u00eenaintea redeschiderii circula\u021biei feroviare. Trenurile sunt programate s\u0103 revin\u0103 pe traseu la sf\u00e2r\u0219itul lunii august, dup\u0103 aproape trei luni \u00een care traficul a fost suspendat pentru interven\u021bii complexe la infrastructur\u0103. Pe \u0219antierul feroviar dintre Timi\u0219oara [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[185,226],"class_list":["post-2104089","post","type-post","status-publish","format-standard","hentry","category-romania","tag-banatulazi-ro","tag-crawlmanager"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2104089","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2104089"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2104089\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2104089"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2104089"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2104089"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}