{"id":2098677,"date":"2026-08-17T06:00:40","date_gmt":"2026-08-17T03:00:40","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=2098677"},"modified":"2026-08-17T06:00:40","modified_gmt":"2026-08-17T03:00:40","slug":"pas-in-viitor-comuna-stejaru-devine-inteligenta-printr-o-investitie-pnrr-de-peste-2-milioane-de-lei","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=2098677","title":{"rendered":"Pas \u00een viitor: Comuna Stejaru devine \u201einteligent\u0103\u201d printr-o investi\u0163ie PNRR de peste 2 milioane de lei &#8211;"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/ziaruldelta.ro\/wp-content\/uploads\/2026\/08\/pas-in-viitor.jpg&#8221;]<\/p>\n<article id=\"post-38004\" class=\"module single-post-module post-38004 post type-post status-publish format-standard has-post-thumbnail hentry category-politica-administratie et-has-post-format-content et_post_format-et-post-format-standard\">\n<div class=\"post-header\">\n<h1 class=\"entry-title\">Pas \u00een viitor: Comuna Stejaru devine \u201einteligent\u0103\u201d printr-o investi\u0163ie PNRR de peste 2 milioane de lei<\/h1>\n<div class=\"post-meta vcard\">\n<p>Posted by <a href=\"https:\/\/ziaruldelta.ro\/author\/rasvan-dinca\/\" class=\"url fn\" title=\"Posts by Rasvan DINCA\" rel=\"author\">Rasvan DINCA<\/a> | <span class=\"updated\">Aug 17, 2026<\/span> | <a href=\"https:\/\/ziaruldelta.ro\/category\/politica-administratie\/\" rel=\"tag\">Politica &#8211; Administratie<\/a> | <\/p>\n<\/div>\n<\/div>\n<div class=\"post-thumbnail header\"><img decoding=\"async\" src=\"https:\/\/ziaruldelta.ro\/wp-content\/uploads\/2026\/08\/pas-in-viitor.jpg\" alt=\"Pas \u00een viitor: Comuna Stejaru devine \u201einteligent\u0103\u201d printr-o investi\u0163ie PNRR de peste 2 milioane de lei\"><\/div>\n<div class=\"post-wrap\">\n<div class=\"post-content entry-content\">\n<p><strong>\u00a0Comuna Stejaru finalizeaz\u0103 un amplu proiect de modernizare digital\u0103 \u015fi tranzi\u0163ie verde. Printr-o finan\u0163are nerambursabil\u0103 de 2.195.407,53 lei ob\u0163inut\u0103 prin Planul Na\u0163ional de Redresare \u015fi Rezilien\u0163\u0103 (PNRR), administra\u0163ia local\u0103 a implementat sisteme inteligente de management local \u015fi infrastructur\u0103 pentru vehicule electrice. Proiectul, derulat \u00een baza contractului de finan\u0163are nr. 1054\/05.01.2023 cu Ministerul Dezvolt\u0103rii, Lucr\u0103rilor Publice \u015fi Administra\u0163iei, a fost finalizat efectiv pe 6 noiembrie 2025, devans\u00e2nd termenul ini\u0163ial din ianuarie 2026.<\/strong><\/p>\n<p><strong>Digitalizare complet\u0103: de la Cloud la \u201eFunc\u0163ionarul Virtual\u201d<\/strong><\/p>\n<p>Proiectul finan\u0163eaz\u0103 modernizarea administra\u0163iei locale cu peste 1,5 milioane lei, implement\u00e2nd o platform\u0103 cloud, echipamente IT noi, un centru de monitorizare a traficului, un muzeu virtual \u015fi o platform\u0103 de \u201efunc\u0163ionar virtual\u201d pentru debirocratizare. Suplimentar,\u00a0 au fost instalate dou\u0103 sta\u0163ii de re\u00eenc\u0103rcare pentru vehicule electrice, oferind trei puncte de \u00eenc\u0103rcare lent\u0103 (22 kW) \u015fi unul rapid (50 kW) pe strada Principal\u0103 din Stejaru.<\/p>\n<p>Noua infrastructur\u0103 TIC optimizeaz\u0103 gestionarea situa\u0163iilor de urgen\u0163\u0103 \u015fi faciliteaz\u0103 accesul cet\u0103\u0163enilor la serviciile publice.<\/p>\n<p>\u00a0<\/p>\n<\/div>\n<\/div>\n<div class=\"post-footer\">\n<div class=\"social-icons ed-social-share-icons\">\n<p class=\"share-title\">Share:<\/p>\n<\/div>\n<div class=\"rating-stars\">\n<p id=\"rate-title\" class=\"rate-title\">Rate:<\/p>\n<\/div>\n<\/div>\n<\/article>\n<div class=\"post-content entry-content\">\n<p><strong>\u00a0Comuna Stejaru finalizeaz\u0103 un amplu proiect de modernizare digital\u0103 \u015fi tranzi\u0163ie verde. Printr-o finan\u0163are nerambursabil\u0103 de 2.195.407,53 lei ob\u0163inut\u0103 prin Planul Na\u0163ional de Redresare \u015fi Rezilien\u0163\u0103 (PNRR), administra\u0163ia local\u0103 a implementat sisteme inteligente de management local \u015fi infrastructur\u0103 pentru vehicule electrice. Proiectul, derulat \u00een baza contractului de finan\u0163are nr. 1054\/05.01.2023 cu Ministerul Dezvolt\u0103rii, Lucr\u0103rilor Publice \u015fi Administra\u0163iei, a fost finalizat efectiv pe 6 noiembrie 2025, devans\u00e2nd termenul ini\u0163ial din ianuarie 2026.<\/strong><\/p>\n<p><strong>Digitalizare complet\u0103: de la Cloud la \u201eFunc\u0163ionarul Virtual\u201d<\/strong><\/p>\n<p>Proiectul finan\u0163eaz\u0103 modernizarea administra\u0163iei locale cu peste 1,5 milioane lei, implement\u00e2nd o platform\u0103 cloud, echipamente IT noi, un centru de monitorizare a traficului, un muzeu virtual \u015fi o platform\u0103 de \u201efunc\u0163ionar virtual\u201d pentru debirocratizare. Suplimentar,\u00a0 au fost instalate dou\u0103 sta\u0163ii de re\u00eenc\u0103rcare pentru vehicule electrice, oferind trei puncte de \u00eenc\u0103rcare lent\u0103 (22 kW) \u015fi unul rapid (50 kW) pe strada Principal\u0103 din Stejaru.<\/p>\n<p>Noua infrastructur\u0103 TIC optimizeaz\u0103 gestionarea situa\u0163iilor de urgen\u0163\u0103 \u015fi faciliteaz\u0103 accesul cet\u0103\u0163enilor la serviciile publice.<\/p>\n<p>\u00a0<\/p>\n<\/div>\n<div class=\"post-content entry-content\">\n<p><strong>\u00a0Comuna Stejaru finalizeaz\u0103 un amplu proiect de modernizare digital\u0103 \u015fi tranzi\u0163ie verde. Printr-o finan\u0163are nerambursabil\u0103 de 2.195.407,53 lei ob\u0163inut\u0103 prin Planul Na\u0163ional de Redresare \u015fi Rezilien\u0163\u0103 (PNRR), administra\u0163ia local\u0103 a implementat sisteme inteligente de management local \u015fi infrastructur\u0103 pentru vehicule electrice. Proiectul, derulat \u00een baza contractului de finan\u0163are nr. 1054\/05.01.2023 cu Ministerul Dezvolt\u0103rii, Lucr\u0103rilor Publice \u015fi Administra\u0163iei, a fost finalizat efectiv pe 6 noiembrie 2025, devans\u00e2nd termenul ini\u0163ial din ianuarie 2026.<\/strong><\/p>\n<p><strong>Digitalizare complet\u0103: de la Cloud la \u201eFunc\u0163ionarul Virtual\u201d<\/strong><\/p>\n<p>Proiectul finan\u0163eaz\u0103 modernizarea administra\u0163iei locale cu peste 1,5 milioane lei, implement\u00e2nd o platform\u0103 cloud, echipamente IT noi, un centru de monitorizare a traficului, un muzeu virtual \u015fi o platform\u0103 de \u201efunc\u0163ionar virtual\u201d pentru debirocratizare. Suplimentar,\u00a0 au fost instalate dou\u0103 sta\u0163ii de re\u00eenc\u0103rcare pentru vehicule electrice, oferind trei puncte de \u00eenc\u0103rcare lent\u0103 (22 kW) \u015fi unul rapid (50 kW) pe strada Principal\u0103 din Stejaru.<\/p>\n<p>Noua infrastructur\u0103 TIC optimizeaz\u0103 gestionarea situa\u0163iilor de urgen\u0163\u0103 \u015fi faciliteaz\u0103 accesul cet\u0103\u0163enilor la serviciile publice.<\/p>\n<p>\u00a0<\/p>\n<\/div>\n<p>[analyse_source url=&#8221;https:\/\/ziaruldelta.ro\/2026\/08\/17\/pas-in-viitor-comuna-stejaru-devine-inteligenta-printr-o-investitie-pnrr-de-peste-2-milioane-de-lei\/&#8221;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/ziaruldelta.ro\/wp-content\/uploads\/2026\/08\/pas-in-viitor.jpg&#8221;] Pas \u00een viitor: Comuna Stejaru devine \u201einteligent\u0103\u201d printr-o investi\u0163ie PNRR de peste 2 milioane de lei Posted by Rasvan DINCA | Aug 17, 2026 | Politica &#8211; Administratie | \u00a0Comuna Stejaru finalizeaz\u0103 un amplu proiect de modernizare digital\u0103 \u015fi tranzi\u0163ie verde. Printr-o finan\u0163are nerambursabil\u0103 de 2.195.407,53 lei ob\u0163inut\u0103 prin Planul Na\u0163ional de [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[226,206],"class_list":["post-2098677","post","type-post","status-publish","format-standard","hentry","category-romania","tag-crawlmanager","tag-ziaruldelta-ro"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2098677","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2098677"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2098677\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2098677"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2098677"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2098677"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}