{"id":2091462,"date":"2026-08-13T09:43:34","date_gmt":"2026-08-13T06:43:34","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=2091462"},"modified":"2026-08-13T09:43:34","modified_gmt":"2026-08-13T06:43:34","slug":"alti-16-kilometri-din-dj-684-intra-in-reabilitare-cj-timis-a-semnat-contractul-pentru-tronsonul-pana-la-limita-cu-caras-severin","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=2091462","title":{"rendered":"Al\u021bi 16 kilometri din DJ 684 intr\u0103 \u00een reabilitare. CJ Timi\u0219 a semnat contractul pentru tronsonul p\u00e2n\u0103 la limita cu Cara\u0219-Severin"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/www.tion.ro\/wp-content\/uploads\/2026\/08\/+otf\/1200&#215;630\/CTdH1fJBb1i__bgKfpZgL105PVF9WRVJZX1NFQz2KKeME1Aq__z9UHFDaodwRwV__QKXrT7rTNeaQ2VuzERTri6EbVzMbmXhaf__jPVcwMY3QGTNQ2g4TMznw27rV7s=\/6614120WhatsAppImage20260813at124046.jpeg&#8221;]<\/p>\n<article id=\"post-2333616\" class>\n<div class=\"entry-content clearfix\">\n<div class=\"enewsArticleContent\">\n<p>Lucr\u0103rile vor fi realizate de asocierea Drumuri \u0219i Poduri Banat SRL \u2013 General Trust Arge\u0219 SRL \u0219i vor dura 20 de luni de la emiterea ordinului de \u00eencepere.<\/p>\n<p>Pe acest sector va fi modernizat carosabilul \u0219i vor fi construite patru poduri. Tronsonul reprezint\u0103 continuarea sectorului Co\u0219ava \u2013 Tome\u0219ti \u2013 Luncanii de Jos, pentru care <strong><a href=\"https:\/\/www.tion.ro\/stirile-judetului-timis\/modernizarea-dj-684-avanseaza-cj-timis-a-semnat-contractul-de-executie-pentru-primul-tronson-2316423\/\" target=\"_blank\" rel=\"noopener\">CJ Timi\u0219 a semnat deja un contract de execu\u021bie \u00een luna iulie<\/a><\/strong>.<\/p>\n<h3><strong>Peste 26 de kilometri de drum \u00een jude\u021bul Timi\u0219<\/strong><\/h3>\n<p>Primul contract vizeaz\u0103 aproximativ 10,4 kilometri, \u00eentre km 8+800 \u0219i km 19+189, pe traseul Co\u0219ava \u2013 Tome\u0219ti \u2013 Luncanii de Jos. Contractul are o valoare de peste 52 de milioane de lei (aproximativ 9,9 milioane de euro), iar lucr\u0103rile sunt realizate de aceea\u0219i asociere de firme.<\/p>\n<p>Prin cele dou\u0103 contracte, modernizarea DJ 684 va continua pe aproximativ 26 de kilometri \u00een jude\u021bul Timi\u0219, de la Co\u0219ava p\u00e2n\u0103 la limita cu jude\u021bul Cara\u0219-Severin.<\/p>\n<p>Lucr\u0103rile fac parte dintr-un proiect mai amplu, realizat \u00een parteneriat de consiliile jude\u021bene Timi\u0219, Cara\u0219-Severin \u0219i Hunedoara. Proiectul regional urm\u0103re\u0219te modernizarea a aproximativ <strong><a href=\"https:\/\/www.tion.ro\/stirile-judetului-timis\/proiect-de-peste-446-de-milioane-de-lei-pentru-modernizarea-drumului-dj-684-care-leaga-judetele-timis-caras-severin-si-hunedoara-2253637\/\" target=\"_blank\" rel=\"noopener\">56 de kilometri de drum \u0219i crearea unei leg\u0103turi rutiere \u00eentre cele trei jude\u021be<\/a><\/strong>.<\/p>\n<p>Traseul va continua din Timi\u0219 prin Ru\u0219chi\u021ba \u0219i Voislova, \u00een jude\u021bul Cara\u0219-Severin, cu o leg\u0103tur\u0103 spre Hunedoara, la DJ 687D. Consiliul Jude\u021bean Timi\u0219 este liderul proiectului.<\/p>\n<p>Valoarea total\u0103 a investi\u021biei regionale este de aproximativ 88 de milioane de euro, dintre care aproape 48 de milioane de euro reprezint\u0103 fonduri nerambursabile prin Programul Regional Vest.<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-large wp-image-2333625\" src=\"https:\/\/www.tion.ro\/wp-content\/uploads\/2026\/08\/6614119WhatsAppImage20260813at124052.jpeg\" alt width=\"1024\" height=\"576\"><\/p>\n<p>\u00a0<\/p>\n<div class=\"fbShareLikeTwitterAndEmailContainer\">\n<div class=\"wrapper\">\n<div class=\"email\">\n<div id=\"mailto-pop\" class=\"pop-form pop-form-mailto\">\n<div class=\"pop-form-header\">\n<h4>Trimite articolul<\/h4>\n<p><a class=\"pop-form-close\">X<\/a><\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"comments\">\n<div class=\"top\">\n<div class=\"commentsNumber\"><span class=\"number\">0<\/span><span class=\"text\">Comentarii<\/span><\/div>\n<\/div>\n<div class=\"center\">\n<div id=\"respond\" class=\"comment-respond\">\n<h3 id=\"reply-title\" class=\"comment-reply-title\"><small><a rel=\"nofollow\" id=\"cancel-comment-reply-link\" href=\"https:\/\/www.tion.ro\/stirile-judetului-timis\/alti-16-kilometri-din-dj-684-intra-in-reabilitare-cj-timis-a-semnat-contractul-pentru-tronsonul-pana-la-limita-cu-caras-severin-2333616\/#respond\">Cancel reply<\/a><\/small><\/h3>\n<p class=\"comment-notes\"><span id=\"email-notes\">Your email address will not be published.<\/span><span class=\"required-field-message\">Required fields are marked <span class=\"required\">*<\/span><\/span><\/p>\n<p class=\"commentFormComment\"><span id=\"commentFormCount\"><br \/>\n                            inca<br \/>\n                            <span id=\"countCommentText\">1000<\/span><br \/>\n                            caractere ramase<br \/>\n                        <\/span><\/p>\n<\/div>\n<\/div>\n<div class=\"bottom\">\n<p class=\"forumDisclaimerHuRo\">\n            Citi\u021bi principiile noastre de moderare <a href=\"https:\/\/www.tion.ro\/reguli-postare-comentarii\/\" target=\"_blank\">aici<\/a>!\n        <\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/article>\n<div class=\"entry-content clearfix\">\n<div class=\"enewsArticleContent\">\n<p>Lucr\u0103rile vor fi realizate de asocierea Drumuri \u0219i Poduri Banat SRL \u2013 General Trust Arge\u0219 SRL \u0219i vor dura 20 de luni de la emiterea ordinului de \u00eencepere.<\/p>\n<p>Pe acest sector va fi modernizat carosabilul \u0219i vor fi construite patru poduri. Tronsonul reprezint\u0103 continuarea sectorului Co\u0219ava \u2013 Tome\u0219ti \u2013 Luncanii de Jos, pentru care <strong><a href=\"https:\/\/www.tion.ro\/stirile-judetului-timis\/modernizarea-dj-684-avanseaza-cj-timis-a-semnat-contractul-de-executie-pentru-primul-tronson-2316423\/\" target=\"_blank\" rel=\"noopener\">CJ Timi\u0219 a semnat deja un contract de execu\u021bie \u00een luna iulie<\/a><\/strong>.<\/p>\n<h3><strong>Peste 26 de kilometri de drum \u00een jude\u021bul Timi\u0219<\/strong><\/h3>\n<p>Primul contract vizeaz\u0103 aproximativ 10,4 kilometri, \u00eentre km 8+800 \u0219i km 19+189, pe traseul Co\u0219ava \u2013 Tome\u0219ti \u2013 Luncanii de Jos. Contractul are o valoare de peste 52 de milioane de lei (aproximativ 9,9 milioane de euro), iar lucr\u0103rile sunt realizate de aceea\u0219i asociere de firme.<\/p>\n<p>Prin cele dou\u0103 contracte, modernizarea DJ 684 va continua pe aproximativ 26 de kilometri \u00een jude\u021bul Timi\u0219, de la Co\u0219ava p\u00e2n\u0103 la limita cu jude\u021bul Cara\u0219-Severin.<\/p>\n<p>Lucr\u0103rile fac parte dintr-un proiect mai amplu, realizat \u00een parteneriat de consiliile jude\u021bene Timi\u0219, Cara\u0219-Severin \u0219i Hunedoara. Proiectul regional urm\u0103re\u0219te modernizarea a aproximativ <strong><a href=\"https:\/\/www.tion.ro\/stirile-judetului-timis\/proiect-de-peste-446-de-milioane-de-lei-pentru-modernizarea-drumului-dj-684-care-leaga-judetele-timis-caras-severin-si-hunedoara-2253637\/\" target=\"_blank\" rel=\"noopener\">56 de kilometri de drum \u0219i crearea unei leg\u0103turi rutiere \u00eentre cele trei jude\u021be<\/a><\/strong>.<\/p>\n<p>Traseul va continua din Timi\u0219 prin Ru\u0219chi\u021ba \u0219i Voislova, \u00een jude\u021bul Cara\u0219-Severin, cu o leg\u0103tur\u0103 spre Hunedoara, la DJ 687D. Consiliul Jude\u021bean Timi\u0219 este liderul proiectului.<\/p>\n<p>Valoarea total\u0103 a investi\u021biei regionale este de aproximativ 88 de milioane de euro, dintre care aproape 48 de milioane de euro reprezint\u0103 fonduri nerambursabile prin Programul Regional Vest.<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-large wp-image-2333625\" src=\"https:\/\/www.tion.ro\/wp-content\/uploads\/2026\/08\/6614119WhatsAppImage20260813at124052.jpeg\" alt width=\"1024\" height=\"576\"><\/p>\n<p>\u00a0<\/p>\n<div class=\"fbShareLikeTwitterAndEmailContainer\">\n<div class=\"wrapper\">\n<div class=\"email\">\n<div id=\"mailto-pop\" class=\"pop-form pop-form-mailto\">\n<div class=\"pop-form-header\">\n<h4>Trimite articolul<\/h4>\n<p><a class=\"pop-form-close\">X<\/a><\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"comments\">\n<div class=\"top\">\n<div class=\"commentsNumber\"><span class=\"number\">0<\/span><span class=\"text\">Comentarii<\/span><\/div>\n<\/div>\n<div class=\"center\">\n<div id=\"respond\" class=\"comment-respond\">\n<h3 id=\"reply-title\" class=\"comment-reply-title\"><small><a rel=\"nofollow\" id=\"cancel-comment-reply-link\" href=\"https:\/\/www.tion.ro\/stirile-judetului-timis\/alti-16-kilometri-din-dj-684-intra-in-reabilitare-cj-timis-a-semnat-contractul-pentru-tronsonul-pana-la-limita-cu-caras-severin-2333616\/#respond\">Cancel reply<\/a><\/small><\/h3>\n<p class=\"comment-notes\"><span id=\"email-notes\">Your email address will not be published.<\/span><span class=\"required-field-message\">Required fields are marked <span class=\"required\">*<\/span><\/span><\/p>\n<p class=\"commentFormComment\"><span id=\"commentFormCount\"><br \/>\n                            inca<br \/>\n                            <span id=\"countCommentText\">1000<\/span><br \/>\n                            caractere ramase<br \/>\n                        <\/span><\/p>\n<\/div>\n<\/div>\n<div class=\"bottom\">\n<p class=\"forumDisclaimerHuRo\">\n            Citi\u021bi principiile noastre de moderare <a href=\"https:\/\/www.tion.ro\/reguli-postare-comentarii\/\" target=\"_blank\">aici<\/a>!\n        <\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<p>[analyse_source url=&#8221;https:\/\/www.tion.ro\/stirile-judetului-timis\/alti-16-kilometri-din-dj-684-intra-in-reabilitare-cj-timis-a-semnat-contractul-pentru-tronsonul-pana-la-limita-cu-caras-severin-2333616\/&#8221;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/www.tion.ro\/wp-content\/uploads\/2026\/08\/+otf\/1200&#215;630\/CTdH1fJBb1i__bgKfpZgL105PVF9WRVJZX1NFQz2KKeME1Aq__z9UHFDaodwRwV__QKXrT7rTNeaQ2VuzERTri6EbVzMbmXhaf__jPVcwMY3QGTNQ2g4TMznw27rV7s=\/6614120WhatsAppImage20260813at124046.jpeg&#8221;] Lucr\u0103rile vor fi realizate de asocierea Drumuri \u0219i Poduri Banat SRL \u2013 General Trust Arge\u0219 SRL \u0219i vor dura 20 de luni de la emiterea ordinului de \u00eencepere. Pe acest sector va fi modernizat carosabilul \u0219i vor fi construite patru poduri. Tronsonul reprezint\u0103 continuarea sectorului Co\u0219ava \u2013 Tome\u0219ti \u2013 Luncanii de Jos, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[226,191],"class_list":["post-2091462","post","type-post","status-publish","format-standard","hentry","category-romania","tag-crawlmanager","tag-tion-ro"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2091462","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2091462"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2091462\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2091462"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2091462"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2091462"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}