{"id":2083025,"date":"2026-08-06T21:00:00","date_gmt":"2026-08-06T18:00:00","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=2083025"},"modified":"2026-08-06T21:00:00","modified_gmt":"2026-08-06T18:00:00","slug":"video-planul-de-pregatire-pentru-riscuri-in-domeniul-energiei-electrice-aprobat-prin-hotarare-de-guvern","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=2083025","title":{"rendered":"VIDEO! Planul de preg\u0103tire pentru riscuri \u00een domeniul energiei electrice, aprobat prin hot\u0103r\u00e2re de guvern"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/www.monitoruldevrancea.ro\/wp-content\/uploads\/2026\/08\/Planul-de-pregatire.jpeg&#8221;]<\/p>\n<div class=\"td_block_wrap tdb_single_content tdi_123 td-pb-border-top td_block_template_1 td-post-content tagdiv-type\" data-td-block-uid=\"tdi_123\">\n<div class=\"tdb-block-inner td-fix-index\">\n<iframe loading=\"lazy\" src=\"https:\/\/www.facebook.com\/plugins\/video.php?height=314&amp;href=https%3A%2F%2Fwww.facebook.com%2Fguv.ro%2Fvideos%2F1717550979457248%2F&amp;show_text=false&amp;width=560&amp;t=0\" width=\"560\" height=\"314\" scrolling=\"no\" frameborder allowfullscreen=\"true\" allow=\"autoplay; clipboard-write; encrypted-media; picture-in-picture; web-share\"><\/iframe><\/p>\n<p>Guvernul a aprobat, \u00een \u0219edin\u021ba de joi, o hot\u0103r\u00e2re pentru aprobarea Planului de preg\u0103tire pentru riscuri \u00een domeniul energiei electrice. Conform unui comunicat al Executivului, Planul de preg\u0103tire pentru riscuri \u00een domeniul energiei electrice este un document-cadru care stabile\u0219te m\u0103surile na\u021bionale de prevenire, preg\u0103tire, gestionare \u0219i atenuare a efectelor unor eventuale crize de energie electric\u0103, precum \u0219i m\u0103surile necesare pentru restaurarea func\u021bion\u0103rii \u00een siguran\u021b\u0103 a Sistemului Electroenergetic Na\u021bional.<\/p>\n<p>Planul a fost elaborat de Ministerul Energiei, \u00een calitate de autoritate competent\u0103, \u00een aplicarea Regulamentului (UE) 2019\/941 al Parlamentului European \u0219i al Consiliului din 5 iunie 2019 privind preg\u0103tirea pentru riscuri \u00een sectorul energiei electrice, a precizat sursa citat\u0103. \u2018Aprobarea Planului nu echivaleaz\u0103 cu declararea unei crize de energie electric\u0103 \u0219i nu introduce automat limit\u0103ri ale consumului sau ale schimburilor transfrontaliere. Planul stabile\u0219te cadrul de preg\u0103tire, responsabilit\u0103\u021bile institu\u021bionale \u0219i succesiunea m\u0103surilor care pot fi aplicate \u00eentr-o situa\u021bie de criz\u0103. Numai dac\u0103 evolu\u021bia Sistemului Electroenergetic Na\u021bional o impune, dup\u0103 aplicarea m\u0103surilor prealabile prev\u0103zute de legisla\u021bie, limitarea \u00een tran\u0219e a consumului clien\u021bilor finali inclu\u0219i \u00een Normativul de limit\u0103ri poate fi dispus\u0103 printr-o hot\u0103r\u00e2re distinct\u0103 a Guvernului, \u00een condi\u021biile art. 5 alin. (6) din Legea nr. 123\/2012\u2019, precizeaz\u0103 comunicatul Guvernului.<\/p>\n<p>Limitarea \u00een tran\u0219e nu vizeaz\u0103 automat popula\u021bia sau to\u021bi consumatorii industriali, ci numai clien\u021bii finali c\u0103rora li se aplic\u0103 Normativul de limit\u0103ri, \u00een condi\u021biile \u0219i potrivit procedurii stabilite de legisla\u021bia \u00een vigoare. Planul \u0219i documentele din dosar confirm\u0103 caracterul distinct al eventualei hot\u0103r\u00e2ri privind limitarea consumului, potrivit sursei citate.<\/p>\n<p>Documentul analizeaz\u0103 nou\u0103 scenarii de risc relevante la nivel na\u021bional, care pot afecta siguran\u021ba aliment\u0103rii cu energie electric\u0103: atac cibernetic asupra activelor care fac parte din re\u021beaua electric\u0103; val de frig; evenimente extreme cauzate de condi\u021bii meteorologice de iarn\u0103; criz\u0103 \u00een asigurarea combustibililor fosili; greve, revolte \u0219i ac\u021biuni de protest ale angaja\u021bilor; pandemie; secet\u0103; cutremur; conflict militar sau r\u0103zboi.<\/p>\n<p>Pentru fiecare scenariu, Planul descrie condi\u021biile de apari\u021bie \u0219i evolu\u021bia posibil\u0103, efectele asupra produc\u021biei, transportului \u0219i distribu\u021biei energiei electrice, m\u0103surile na\u021bionale de prevenire \u0219i interven\u021bie, precum \u0219i mecanismele regionale \u0219i bilaterale de comunicare, coordonare \u0219i asisten\u021b\u0103 convenite cu operatorii de transport \u0219i de sistem din statele vecine. Planul stabile\u0219te rolurile \u0219i responsabilit\u0103\u021bile Ministerului Energiei, ale CNTEE Transelectrica SA, ale operatorilor de distribu\u021bie, produc\u0103torilor de energie electric\u0103, ANRE \u0219i ale celorlalte autorit\u0103\u021bi \u0219i entit\u0103\u021bi implicate \u00een gestionarea Sistemului Electroenergetic Na\u021bional.<\/p>\n<p>Documentul stabile\u0219te, de asemenea, fluxurile de informare, coordonarea \u00een caz de criz\u0103, m\u0103surile de ap\u0103rare \u0219i restaurare, precum \u0219i testarea periodic\u0103 a echipamentelor, capacit\u0103\u021bilor \u0219i centrelor de dispecer relevante.<\/p>\n<p>\u00cen scenariul de secet\u0103, Planul are \u00een vedere, gradual \u0219i \u00een ordinea stabilit\u0103, m\u0103suri precum:<\/p>\n<p>* aplicarea m\u0103surilor de salvgardare prev\u0103zute \u00een Regulamentul aprobat prin Ordinul ANRE nr. 142\/2014;<\/p>\n<p>* \u00eenc\u0103rcarea grupurilor aflate \u00een func\u021biune p\u00e2n\u0103 la puterea maxim\u0103 disponibil\u0103 \u0219i, dac\u0103 este necesar, utilizarea grupurilor aflate \u00een rezerv\u0103;<\/p>\n<p>* reducerea consumului dispecerizabil declarat ca ofert\u0103 de \u00eenc\u0103rcare pe pia\u021ba de echilibrare;<\/p>\n<p>* redarea \u00eenainte de termen \u00een exploatare, \u00een condi\u021bii de siguran\u021b\u0103 \u0219i dac\u0103 este posibil din punct de vedere tehnic, a unor unit\u0103\u021bi de produc\u021bie aflate \u00een repara\u021bie;<\/p>\n<p>* cre\u0219terea disponibilit\u0103\u021bii echipamentelor din re\u021belele de transport \u0219i distribu\u021bie, inclusiv prin reprogramarea unor retrageri din exploatare;<\/p>\n<p>* func\u021bionarea re\u021belelor de distribu\u021bie \u00een zona inferioar\u0103 a benzii admise de tensiune;<\/p>\n<p>* solicitarea de energie electric\u0103 de urgen\u021b\u0103 de la operatorii de transport \u0219i de sistem din statele vecine, \u00een limita capacit\u0103\u021bilor de interconexiune \u0219i a disponibilit\u0103\u021bii acestora;<\/p>\n<p>* dac\u0103 m\u0103surile anterioare sunt insuficiente, reducerea sau anularea capacit\u0103\u021bii disponibile de interconexiune \u0219i a schimburilor notificate pe direc\u021bia export, \u00een condi\u021biile legisla\u021biei na\u021bionale \u0219i europene.<\/p>\n<p>\u2018M\u0103surile cu impact asupra func\u021bion\u0103rii pie\u021bei \u0219i, \u00een special, m\u0103surile care nu se bazeaz\u0103 pe pia\u021b\u0103 sunt utilizate numai dup\u0103 epuizarea sau dovedirea insuficien\u021bei op\u021biunilor bazate pe pia\u021b\u0103. Acestea trebuie s\u0103 fie necesare, propor\u021bionale, nediscriminatorii \u0219i limitate \u00een timp. Obiectivul Planului este consolidarea rezilien\u021bei Sistemului Electroenergetic Na\u021bional, men\u021binerea continuit\u0103\u021bii aliment\u0103rii \u00een m\u0103sura posibilului, reducerea duratei \u0219i amplorii eventualelor \u00eentreruperi \u0219i restaurarea rapid\u0103 \u0219i sigur\u0103 a func\u021bion\u0103rii sistemului\u2019, mai precizeaz\u0103 Executivul.<\/p>\n<p>Planul se coreleaz\u0103 cu mecanismele na\u021bionale de management al situa\u021biilor de urgen\u021b\u0103, precum \u0219i cu planurile de ap\u0103rare \u0219i restaurare a Sistemului Electroenergetic Na\u021bional, contribuind la cre\u0219terea securit\u0103\u021bii aliment\u0103rii cu energie electric\u0103 a Rom\u00e2niei.<\/p>\n<p><strong>Premierul interimar Ilie Bolojan a declarat joi c\u0103, cel pu\u021bin \u00een urm\u0103toarele zile, nu vor exista consumatori industriali afecta\u021bi, at\u00e2ta timp c\u00e2t Grupul 2 de la Cernavod\u0103 va fi \u00een func\u021biune. <\/strong>\u2018\u00cen ceea ce prive\u0219te aspectele legate de compensa\u021bii, \u00een aceast\u0103 conjunctur\u0103 \u00een care ne g\u0103sim, \u00een momentul actual \u0219i cel pu\u021bin zilele urm\u0103toare, estim\u0103m 5-7 zile, c\u00e2t timp este asigurat\u0103 conform previziunilor legate de debit func\u021bionarea grupului 2 de la Cernavod\u0103, nu vom avea consumatori industriali afecta\u021bi. \u00cen ceea ce prive\u0219te o posibil\u0103 etap\u0103 \u00een care am putea s\u0103 intr\u0103m \u00een care vor fi luate m\u0103suri de limitare a consumurilor, nici \u00een aceast\u0103 perioad\u0103 nu se pune problema acord\u0103rii unor compensa\u021bii, pentru c\u0103 reducerea de putere asigurat\u0103 se face pe baza unor analize pe care Transelectrica le face, care \u00een mod cert \u021bin de datele legate de tipul de consumator, de tehnologia pe care o folose\u0219te, \u00een a\u0219a fel \u00eenc\u00e2t reducerile care se fac s\u0103 nu afecteze activitatea de baz\u0103\u2019, a declarat premierul interimar la Guvern, \u00eentrebat dac\u0103 vor exista m\u0103suri compensatorii \u00een aceast\u0103 perioad\u0103 de criz\u0103 energetic\u0103.<\/p>\n<p>El a precizat c\u0103 se afl\u0103 \u00een leg\u0103tur\u0103 cu principalii consumatori industriali, comunicarea fiind una permanent\u0103. \u2018De asemenea, am comunicat cu principalii consumatori industriali, at\u00e2t prin teleconferin\u021be, am participat personal la aceste teleconferin\u021be, dar mai ales prin contactele pe care furnizorii Transelectrica le au \u00een mod direct cu fiecare consumator. \u0218i, la \u00eent\u00e2lnirea pe care am avut-o \u0219i cu furnizorii i-am rugat pe fiecare s\u0103 ia leg\u0103tura, s\u0103 verifice care sunt consumurile, ce se poate face. \u0218i chiar ast\u0103zi vom comunica cu to\u021bi cei care sunt implica\u021bi, \u00een a\u0219a fel \u00eenc\u00e2t acolo unde se estimeaz\u0103 reduceri, acele reduceri s\u0103 fie anun\u021bate pentru ca furnizorul de energie electric\u0103 \u0219tiind c\u0103 va trebui s\u0103 livreze o cantitate mai mic\u0103, s\u0103 poat\u0103 sau s\u0103 duc\u0103 acele economii pe pia\u021ba zilnic\u0103, ca s\u0103 creasc\u0103 oferta pe pia\u021ba zilnic sau s\u0103 nu le achizi\u021bioneze de pe pia\u021ba zilnic\u0103 pentru a nu crea o presiune suplimentar\u0103, dac\u0103 nu le are pe pre\u021bul legat de pia\u021b\u0103 zilnic. Deci, \u00een momentul de fa\u021b\u0103, nu se pune problema s\u0103 existe astfel de situa\u021bii. Dac\u0103 s-ar ajunge la o decuplare manual\u0103 care ar \u00eensemna o decuplarea f\u0103r\u0103 notific\u0103ri, sigur s-ar pune o astfel de problem\u0103, dar \u00een momentul de fa\u021b\u0103 nu se pune aceast\u0103 problem\u0103\u2019, a transmis Bolojan.<\/p>\n<p><strong>Bolojan: A fost aprobat programul \u2018Diaspora investe\u0219te acas\u0103\u2019<\/strong><\/p>\n<p>Premierul interimar Ilie Bolojan a declarat joi c\u0103 Guvernul a aprobat \u0219i programul \u2018Diaspora investe\u0219te acas\u0103\u2019, care va fi pus \u00een practic\u0103 de Banca de Investi\u021bii \u0219i Dezvoltare, program ce are un buget de 100 de milioane de euro. \u2018Un alt punct de pe ordinea de zi a fost legat de aprobarea programului \u2018Diaspora investe\u0219te acas\u0103\u2019 \u0219i mandatarea B\u0103ncii de Investi\u021bii \u0219i Dezvoltare s\u0103 sus\u021bin\u0103 acest proiect. El este destinat rom\u00e2nilor din Diaspora care doresc s\u0103-\u0219i \u00eenfiin\u021beze afaceri \u00een Rom\u00e2nia. Bugetul programului este de 100 de milioane de euro \u0219i este un efect al ordonan\u021bei 8 care a fost aprobat\u0103 \u00een prim\u0103vara acestui an\u2019, a spus Bolojan la Palatul Victoria.<\/p>\n<p>El a ad\u0103ugat c\u0103 Banca de Investi\u021bii \u0219i Dezvoltare va pune \u00een practic\u0103 aceast\u0103 schem\u0103 de ajutor \u00een baza unei conven\u021bii care va fi semnat\u0103 \u00een urm\u0103toarele 30 de zile cu Ministerul de Finan\u021be. \u2018Cet\u0103\u021benilor rom\u00e2ni care au avut re\u0219edin\u021ba sau domiciliu \u00een str\u0103in\u0103tate \u00een ultimele 9 luni li se va pune la dispozi\u021bie un credit de maximum 200.000 de euro, care ar reprezenta un grant \u00eentr-o pondere de 60% din valoarea creditului total pe care l-ar putea contracta. Asta \u00eenseamn\u0103 c\u0103 ace\u0219ti bani vor putea fi folosi\u021bi pentru reintegrarea economic\u0103 a rom\u00e2nilor din Diaspora \u00een \u021bar\u0103 prin cre\u0219terea accesului la finan\u021bare pentru afacerile nou \u00eenfiin\u021bate, prin valorificarea experien\u021bei acestora pe care au c\u00e2\u0219tigat-o \u00een str\u0103in\u0103tate, iar condi\u021bia va fi ca activele care vor fi achizi\u021bionate s\u0103 fie men\u021binute cel pu\u021bin 3 ani de zile de la data finaliz\u0103rii investi\u021biei \u00een func\u021biune\u2019, a men\u021bionat premierul interimar.<\/p>\n<p>Foto: gov.ro<\/p>\n<\/div>\n<\/div>\n<p>[analyse_source url=&#8221;https:\/\/www.monitoruldevrancea.ro\/2026\/08\/07\/video-planul-de-pregatire-pentru-riscuri-in-domeniul-energiei-electrice-aprobat-prin-hotarare-de-guvern\/&#8221;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/www.monitoruldevrancea.ro\/wp-content\/uploads\/2026\/08\/Planul-de-pregatire.jpeg&#8221;] Guvernul a aprobat, \u00een \u0219edin\u021ba de joi, o hot\u0103r\u00e2re pentru aprobarea Planului de preg\u0103tire pentru riscuri \u00een domeniul energiei electrice. Conform unui comunicat al Executivului, Planul de preg\u0103tire pentru riscuri \u00een domeniul energiei electrice este un document-cadru care stabile\u0219te m\u0103surile na\u021bionale de prevenire, preg\u0103tire, gestionare \u0219i atenuare a efectelor unor eventuale crize [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[226,209],"class_list":["post-2083025","post","type-post","status-publish","format-standard","hentry","category-romania","tag-crawlmanager","tag-monitoruldevrancea-ro"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2083025","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2083025"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2083025\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2083025"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2083025"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2083025"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}