{"id":2082952,"date":"2026-08-04T21:09:08","date_gmt":"2026-08-04T18:09:08","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=2082952"},"modified":"2026-08-04T21:09:08","modified_gmt":"2026-08-04T18:09:08","slug":"reabilitarea-203k-plaiul-nucului-nehoiu-si-a-inceput-parcursul-birocratic","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=2082952","title":{"rendered":"Reabilitarea 203K Plaiul Nucului-Nehoiu \u0219i-a \u00eenceput parcursul\u2026 birocratic"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/opiniabuzau.ro\/wp-content\/uploads\/2026\/08\/dj-2023-k-plaiul-nucului.webp&#8221;]<\/p>\n<div class=\"entry-content entry clearfix\">\n<blockquote>\n<p><strong>Proiectul pentru reabilitarea Drumului Jude\u021bean 203K, cel mai lung drum dintr-o astfel de categorie, nu numai din jude\u021b ci chiar din \u021bar\u0103, a intrat \u00een faza final\u0103 de execu\u021bie, \u00een sensul c\u0103 cel de-al patrulea tronson, Plaiul Nucului-Nehoiu, ultimul, a primit un prim vot din partea consilierilor jude\u021beni, care \u00een \u0219edin\u021ba arondat\u0103 lunii iulie au aprobat, la ini\u021biativa pre\u0219edintelui Marcel Ciolacu, documenta\u021bia tehnico-economic\u0103, faza de avizare a lucr\u0103rilor de interven\u021bii pentru obiectivul amintit.<\/strong><\/p>\n<\/blockquote>\n<p>De asemenea, plenul Consiliului Jude\u021bean a aprobat \u0219i indicatorii care \u021bin de partea financiar\u0103, av\u00e2nd \u00een vedere c\u0103 proiectul pentru reabilitarea tronsonului Plaiul Nucului-Nehoiu este inclus deja la finan\u021bare pe un program regional, derulat de Agen\u021bia de Dezvoltare Regional\u0103 Sud-Est (ADR-SE Br\u0103ila). Valoarea total\u0103 a investi\u021biei este de 284.346.621,16 lei, sum\u0103 care include TVA. Speciali\u0219tii care au \u00eentocmit documenta\u021biile aprobate de consilierii jude\u021beni spun c\u0103 durata viitoarei investi\u021bii ar trebui s\u0103 fie de 18 luni.<\/p>\n<p>\u00centre timp, dup\u0103 cum a recunoscut \u0219i pre\u0219edintele Ciolacu, cel de-al treilea tronson, Podu Muncii (M\u00e2nz\u0103le\u0219ti) \u2013 Plaiul Nucului (Lop\u0103tari) traverseaz\u0103 cel de-al treilea an de contesta\u021bii \u00een justi\u021bie \u00eentre constructorii ofertan\u021bi, oficialul buzoian spun\u00e2nd c\u0103 nu poate influen\u021ba cu nimic ob\u021binerea unui termen final \u0219i o decizie definitiv\u0103 de instan\u021b\u0103, dar a promis c\u0103 documenta\u021bia tehnic\u0103 dedicat\u0103 tronsonului Plaiul Nucului \u2013 Nehoiu nu va avea astfel de sincope \u00een traseul pentru ob\u021binerea avizelor, mai ales \u00een etapa organiz\u0103rii licita\u021biei pentru atribuirea contractului de execu\u021bie.<\/p>\n<p>Documenta\u021bia tehnic\u0103 a proiectului de investi\u021bii este considerat unul dintre documentele obligatorii care se vor depune, al\u0103turi de cererea de finan\u021bare, la Autoritatea de Management. Pre\u0219edintele Ciolacu a declarat pentru presa local\u0103 \u0219i pentru buzoieni c\u0103 institu\u021bia pe care o conduce s-a achitat \u0219i se va achita, \u00een termeni eficien\u021bi, de \u00eentocmirea \u0219i promovarea documenta\u021biilor tehnice sau de alt\u0103 natur\u0103, care s\u0103 garanteze ob\u021binerea finan\u021b\u0103rii din fonduri europene.<\/p>\n<p>\u00cen documentele prezentate consilierilor jude\u021beni se arat\u0103 c\u0103 primii 75 de kilometri din Drumul Jude\u021bean 203K, \u00eentre punctele Robeasca (intrarea \u00een jude\u021bul Buz\u0103u dinspre jude\u021bul Br\u0103ila) \u0219i Podu Muncii (pe teritoriul comunei M\u00e2nz\u0103le\u0219ti) au fost moderniza\u021bi, de asemenea, acces\u00e2nd fonduri europene. De la km 75 p\u00e2n\u0103 la km 105(Plaiul Nucului, comuna Lop\u0103tari) procedurile birocratice par s\u0103 apropie momentul \u00een care contractul de execu\u021bie va fi semnat.<\/p>\n<div class=\"stream-item stream-item-in-post stream-item-inline-post aligncenter\"><a href=\"https:\/\/vreaulanova.ro\/?utm_source=opiniabuzau&amp;utm_medium=image\" title target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" data-od-unknown-tag data-od-xpath=\"\/HTML\/BODY\/DIV[@class=&apos;background-overlay&apos;]\/*[1][self::DIV]\/*[1][self::DIV]\/*[4][self::DIV]\/*[1][self::DIV]\/*[1][self::DIV]\/*[2][self::ARTICLE]\/*[3][self::DIV]\/*[7][self::DIV]\/*[1][self::A]\/*[1][self::IMG]\" src=\"https:\/\/opiniabuzau.ro\/wp-content\/smush-webp\/2022\/02\/MicrosoftTeams-image-4-1.jpg.webp\" alt width=\"728\" height=\"91\" class=\"perfmatters-lazy\"><img loading=\"lazy\" decoding=\"async\" data-od-unknown-tag data-od-xpath=\"\/HTML\/BODY\/DIV[@class=&apos;background-overlay&apos;]\/*[1][self::DIV]\/*[1][self::DIV]\/*[4][self::DIV]\/*[1][self::DIV]\/*[1][self::DIV]\/*[2][self::ARTICLE]\/*[3][self::DIV]\/*[7][self::DIV]\/*[1][self::A]\/*[1][self::IMG]\" src=\"https:\/\/opiniabuzau.ro\/wp-content\/smush-webp\/2022\/02\/MicrosoftTeams-image-4-1.jpg.webp\" alt width=\"728\" height=\"91\"><\/a><\/div>\n<p>Pe toat\u0103 lungimea tronsonului cu num\u0103rul patru vor intra \u00een repara\u021bii capitale sau vor fi executate din nou patru poduri \u0219i 80 de pode\u021be. Unul dintre poduri este amplasat \u00een apropierea ora\u0219ului Nehoiu, iar celelalte trei sunt pe teritoriul satelor B\u00e2sca Rozilei, P\u0103ltini\u0219 \u0219i Nemertea.<\/p>\n<p>Lungimea total\u0103 a Drumului Jude\u021bean 203K este de 127,6 kilometri, iar pentru ca lucr\u0103rile de reabilitare s\u0103 poat\u0103 fi manageriate mai u\u0219or, a fost \u00eemp\u0103r\u021bit \u00een patru tronsoane de execu\u021bie: tronsonul Vadu Pa\u0219ii-Robeasca, 37 km lungime, tronsonul M\u0103r\u0103cineni-Podu Muncii, 37 km lungime; tronsonul Podu Muncii-Plaiul Nucului, 30 km lungime, \u0219i tronsonul Plaiul Nucului-Nehoiu, 22,6 km lungime.<\/p>\n<\/div>\n<p>[analyse_source url=&#8221;https:\/\/opiniabuzau.ro\/reabilitarea-203k-plaiul-nucului-nehoiu-si-a-inceput-parcursul-birocratic\/&#8221;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/opiniabuzau.ro\/wp-content\/uploads\/2026\/08\/dj-2023-k-plaiul-nucului.webp&#8221;] Proiectul pentru reabilitarea Drumului Jude\u021bean 203K, cel mai lung drum dintr-o astfel de categorie, nu numai din jude\u021b ci chiar din \u021bar\u0103, a intrat \u00een faza final\u0103 de execu\u021bie, \u00een sensul c\u0103 cel de-al patrulea tronson, Plaiul Nucului-Nehoiu, ultimul, a primit un prim vot din partea consilierilor jude\u021beni, care \u00een \u0219edin\u021ba arondat\u0103 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[226,44],"class_list":["post-2082952","post","type-post","status-publish","format-standard","hentry","category-politics","tag-crawlmanager","tag-opiniabuzau-ro"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2082952","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2082952"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2082952\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2082952"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2082952"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2082952"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}