{"id":2069199,"date":"2026-07-30T10:33:39","date_gmt":"2026-07-30T07:33:39","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=2069199"},"modified":"2026-07-30T10:33:39","modified_gmt":"2026-07-30T07:33:39","slug":"ce-a-solicitat-completari-pentru-o-parte-dintre-tintele-si-jaloanele-cererii-de-plata-nr-5","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=2069199","title":{"rendered":"CE a solicitat complet\u0103ri pentru o parte dintre \u021bintele \u0219i jaloanele Cererii de Plat\u0103 nr. 5"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/ziardesuceava.ro\/wp-content\/uploads\/2026\/07\/79646.jpg&#8221;]<\/p>\n<div class=\"post-content clearfix\">\n<div class=\"blog-post-thumb\"><img loading=\"lazy\" decoding=\"async\" width=\"800\" height=\"540\" src=\"https:\/\/ziardesuceava.ro\/wp-content\/uploads\/2026\/07\/79646.jpg\" class=\"attachment-inhype-blog-thumb size-inhype-blog-thumb wp-post-image\" alt><\/div>\n<div class=\"entry-content\">\n<div>\n<p class=\"fara-orfani lead\">Membrii Executivului au fost informa\u021bi cu privire la stadiul \u00eendeplinirii celor 75 de \u021binte \u0219i jaloane incluse \u00een Cererea de Plat\u0103 nr. 5 din cadrul Planului Na\u021bional de Redresare \u0219i Rezilien\u021b\u0103 (PNRR), \u00een \u0219edin\u021ba de joi.<\/p>\n<div class=\"continut-articol\">\n<p>\u00cen urma centraliz\u0103rii \u0219i verific\u0103rii documentelor transmise de coordonatorii de reforme \u0219i investi\u021bii, rezult\u0103 c\u0103, pentru 64 dintre \u021binte \u0219i jaloane, documentele de tip cover note au fost consultate preliminar cu Comisia European\u0103. Dintre acestea, pentru 41 de cover note-uri au fost primite observa\u021bii \u0219i solicit\u0103ri de completare din partea Comisiei Europene, care au fost integrate, documentele fiind retransmise ulterior. Pentru celelalte 23 de cover note-uri, consult\u0103rile cu Comisia European\u0103 sunt \u00eenc\u0103 \u00een desf\u0103\u0219urare.Totodat\u0103, pentru 11 \u021binte \u0219i jaloane, documentele de tip cover note nu au fost \u00eenc\u0103 transmise de c\u0103tre coordonatorii de reforme \u0219i investi\u021bii.<\/p>\n<p>\u00cen aceste condi\u021bii, se constat\u0103 c\u0103, pentru o parte dintre \u021bintele \u0219i jaloanele aferente Cererii de Plat\u0103 nr. 5, sunt \u00eenc\u0103 necesare complet\u0103ri \u0219i clarific\u0103ri \u00een vederea \u00eendeplinirii tuturor cerin\u021belor asumate \u00een rela\u021bia cu Comisia European\u0103.<\/p>\n<p>De asemenea, pentru anumite \u021binte \u0219i jaloane sunt necesare m\u0103suri suplimentare, precum clarificarea cadrului legislativ aplicabil, finalizarea legisla\u021biei subsecvente, completarea documenta\u021biei aferente bazelor de date, solu\u021bionarea observa\u021biilor formulate de Comisia European\u0103, precum \u0219i completarea documentelor de tip cover note \u0219i a documenta\u021biei-suport, inclusiv pentru domeniile coordonate de ANC \u0219i MADR.<\/p>\n<p>\u00cen concluzie, Ministerul Investi\u021biilor \u0219i Proiectelor Europene subliniaz\u0103 c\u0103 to\u021bi coordonatorii de reforme \u0219i investi\u021bii au obliga\u021bia de a finaliza, cu celeritate, toate activit\u0103\u021bile restante aflate \u00een responsabilitatea lor, \u00een vederea \u00eendeplinirii \u00een mod satisf\u0103c\u0103tor a tuturor \u021bintelor \u0219i jaloanelor incluse \u00een Cererea de Plat\u0103 nr. 5.<\/p>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"inhype-social-share-fixed sidebar-position-right\">\n<div class=\"post-social-wrapper\">\n<div class=\"post-social-title\"><span class=\"post-social-title-text\">Share<\/span><\/div>\n<\/div>\n<\/div>\n<\/div>\n<p>[analyse_source url=&#8221;https:\/\/ziardesuceava.ro\/ce-a-solicitat-completari-pentru-o-parte-dintre-tintele-si-jaloanele-cererii-de-plata-nr-5\/&#8221;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/ziardesuceava.ro\/wp-content\/uploads\/2026\/07\/79646.jpg&#8221;] Membrii Executivului au fost informa\u021bi cu privire la stadiul \u00eendeplinirii celor 75 de \u021binte \u0219i jaloane incluse \u00een Cererea de Plat\u0103 nr. 5 din cadrul Planului Na\u021bional de Redresare \u0219i Rezilien\u021b\u0103 (PNRR), \u00een \u0219edin\u021ba de joi. \u00cen urma centraliz\u0103rii \u0219i verific\u0103rii documentelor transmise de coordonatorii de reforme \u0219i investi\u021bii, rezult\u0103 c\u0103, pentru [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[226,171],"class_list":["post-2069199","post","type-post","status-publish","format-standard","hentry","category-romania","tag-crawlmanager","tag-ziardesuceava-ro"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2069199","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2069199"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2069199\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2069199"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2069199"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2069199"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}