{"id":2068403,"date":"2026-07-29T21:00:00","date_gmt":"2026-07-29T18:00:00","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=2068403"},"modified":"2026-07-29T21:00:00","modified_gmt":"2026-07-29T18:00:00","slug":"pufesti-lucrari-pentru-cresterea-eficientei-energetice-la-cladirea-scolii-din-domnesti-targ","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=2068403","title":{"rendered":"Pufe\u0219ti. Lucr\u0103ri pentru cre\u0219terea eficien\u021bei energetice la cl\u0103direa \u0219colii din Domne\u0219ti-T\u00e2rg"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/www.monitoruldevrancea.ro\/wp-content\/uploads\/2026\/07\/scoala-pufesti.jpg&#8221;]<\/p>\n<div class=\"td_block_wrap tdb_single_content tdi_123 td-pb-border-top td_block_template_1 td-post-content tagdiv-type\" data-td-block-uid=\"tdi_123\">\n<div class=\"tdb-block-inner td-fix-index\">\n<p>Contract \u00een valoare de 1.936.072,64 lei scos la licita\u021bie de autorit\u0103\u021bile din Pufe\u0219ti, pentru lucr\u0103ri care vizeaz\u0103 cre\u0219terea eficien\u021bei energetice \u0219i gestionarea inteligent\u0103 a energiei pentru \u0218coala cu clasele I-IV din satul Domne\u0219ti-T\u00e2rg. Fondurile au fost atrase prin Agen\u021bia pentru Dezvoltare Regional\u0103 (ADR), prin programul de eficientizare energetic\u0103, iar proiectul propune lucr\u0103ri de terasamente, de arhitectur\u0103, de voce-date, supraveghere, antiefrac\u021bie, lucr\u0103ri de instala\u021bii termice \u0219i de instala\u021bii sanitare.<\/p>\n<p>Cl\u0103direa \u0219colii din Domne\u0219ti-T\u00e2rg a fost realizat\u0103 \u00een anii 2000, iar interven\u021biile peopuse acum vizeaz\u0103 at\u00e2t \u00eembun\u0103t\u0103\u021birea performan\u021bei termice \u0219i energetice, c\u00e2t \u0219i \u201e<strong><em>cre\u0219terea gradului de confort interior pentru utilizatori<\/em><\/strong>\u201d.\u00a0<\/p>\n<p>Totodat\u0103, proiectul presupune \u0219i executarea de lucr\u0103ri de refacere a finisajelor interioare, f\u0103r\u0103 a afecta structura de rezisten\u021b\u0103 a imobilului. \u00cen documenta\u021bie se arat\u0103 c\u0103 pe teren se afl\u0103 edificate 3 construc\u021bii, \u00eens\u0103 doar C2, care are destina\u021bia construc\u021bii administrative \u0219i social culturale \u0219i func\u021biunea de \u0219coal\u0103 general\u0103 pentru I-IV, va fi supus\u0103 interven\u021biilor.<\/p>\n<p>\u201e<strong><em>Av\u00e2nd \u00een vedere (\u2026) preocuparea autorit\u0103\u021bii contractante de a asigura cet\u0103\u021benilor o calitate mai bun\u0103 a vie\u021bii, a depus \u0219i ob\u021binut finan\u021bare pentru un astfel de obiectiv. Investi\u021bia propus\u0103 are rolul de a dezvolta \u0219i dota infrastructura localit\u0103\u021bii (\u2026)<\/em><\/strong>\u201d, se arat\u0103 \u00een caietul de sarcini.<\/p>\n<p>\u0218i, tot aici, se precizeaz\u0103 c\u0103, printre obiectivele preconizate se num\u0103r\u0103 \u201e<strong><em>asigurarea unui nivel calitativ superior al spa\u021biilor de \u00eenv\u0103\u021b\u0103m\u00e2nt pentru elevi<\/em><\/strong>\u201d \u0219i \u201e<strong><em>prevenirea abandonului \u0219colar, prin crearea unui climat nou \u0219i curat pentru \u00eenv\u0103\u021b\u0103m\u00e2nt<\/em><\/strong>\u201d.<\/p>\n<\/div>\n<\/div>\n<p>[analyse_source url=&#8221;https:\/\/www.monitoruldevrancea.ro\/2026\/07\/30\/pufesti-lucrari-pentru-cresterea-eficientei-energetice-la-cladirea-scolii-din-domnesti-targ\/&#8221;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/www.monitoruldevrancea.ro\/wp-content\/uploads\/2026\/07\/scoala-pufesti.jpg&#8221;] Contract \u00een valoare de 1.936.072,64 lei scos la licita\u021bie de autorit\u0103\u021bile din Pufe\u0219ti, pentru lucr\u0103ri care vizeaz\u0103 cre\u0219terea eficien\u021bei energetice \u0219i gestionarea inteligent\u0103 a energiei pentru \u0218coala cu clasele I-IV din satul Domne\u0219ti-T\u00e2rg. Fondurile au fost atrase prin Agen\u021bia pentru Dezvoltare Regional\u0103 (ADR), prin programul de eficientizare energetic\u0103, iar proiectul propune lucr\u0103ri [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[226,209],"class_list":["post-2068403","post","type-post","status-publish","format-standard","hentry","category-romania","tag-crawlmanager","tag-monitoruldevrancea-ro"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2068403","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2068403"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2068403\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2068403"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2068403"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2068403"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}