{"id":2066699,"date":"2026-07-29T06:00:39","date_gmt":"2026-07-29T03:00:39","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=2066699"},"modified":"2026-07-29T06:00:39","modified_gmt":"2026-07-29T03:00:39","slug":"reabilitarea-energetica-a-opt-blocuri-din-municipiu-a-fost-finalizata-ziarul-delta-tulcea","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=2066699","title":{"rendered":"Reabilitarea energetic\u0103 a opt blocuri din municipiu a fost finalizat\u0103 &#8211; Ziarul Delta Tulcea"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/ziaruldelta.ro\/wp-content\/uploads\/2026\/07\/reabilitarea.jpg&#8221;]<\/p>\n<article id=\"post-37712\" class=\"module single-post-module post-37712 post type-post status-publish format-standard has-post-thumbnail hentry category-economie et-has-post-format-content et_post_format-et-post-format-standard\">\n<div class=\"post-header\">\n<h1 class=\"entry-title\">Reabilitarea energetic\u0103 a opt blocuri din municipiu a fost finalizat\u0103<\/h1>\n<div class=\"post-meta vcard\">\n<p>Posted by <a href=\"https:\/\/ziaruldelta.ro\/author\/claudia-ionescu\/\" class=\"url fn\" title=\"Posts by Claudia Ionescu\" rel=\"author\">Claudia Ionescu<\/a> | <span class=\"updated\">Jul 29, 2026<\/span> | <a href=\"https:\/\/ziaruldelta.ro\/category\/economie\/\" rel=\"tag\">Economie<\/a> | <\/p>\n<\/div>\n<\/div>\n<div class=\"post-thumbnail header\"><img decoding=\"async\" src=\"https:\/\/ziaruldelta.ro\/wp-content\/uploads\/2026\/07\/reabilitarea.jpg\" alt=\"Reabilitarea energetic\u0103 a opt blocuri din municipiu a fost finalizat\u0103\"><\/div>\n<div class=\"post-wrap\">\n<div class=\"post-content entry-content\">\n<p><strong>Opt blocuri de locuin\u0163e din municipiu au fost modernizate din punct de vedere energetic printr-un proiect finan\u0163at prin Programul Na\u0163ional de Redresare \u015fi Rezilien\u0163\u0103 (PNRR). <\/strong><\/p>\n<p>Lucr\u0103rile au vizat blocurile 1, 2, 5, 6, 8, 9, 10 \u015fi 11 de pe strada G\u0103rii \u015fi au avut ca obiectiv cre\u015fterea eficien\u0163ei energetice a cl\u0103dirilor reziden\u0163iale \u015fi reducerea consumului de energie, \u00eembun\u0103t\u0103\u0163ind astfel condi\u0163iile de locuit pentru sute de tulceni. Valoarea total\u0103 a investi\u0163iei s-a ridicat la 28.138.303,44 lei.<\/p>\n<p>Interven\u0163iile realizate vor contribui la reducerea consumului de energie \u015fi a emisiilor de carbon. Printre lucr\u0103rile prev\u0103zute se num\u0103r\u0103: izolarea termic\u0103 a pere\u0163ilor exteriori cu pl\u0103ci de vat\u0103 bazaltic\u0103 de 15 cm, sistem ETICS \u015fi tencuial\u0103 de protec\u0163ie; \u00eenlocuirea t\u00e2mpl\u0103riei exterioare cu feronerie PVC termoizolant\u0103, geam dublu cu argon \u015fi \u00eenchiderea balcoanelor\/logiilor; termoizolarea plan\u015feelor peste ultimul nivel \u015fi consolidarea plan\u015feului peste subsolul tehnic; modernizarea instala\u0163iilor de distribu\u0163ie ap\u0103, re\u0163eaua de ap\u0103 cald\u0103 menajer\u0103 \u015fi coloanele de \u00eenc\u0103lzire; reabilitarea instala\u0163iei electrice prin \u00eenlocuirea circuitelor deteriorate \u015fi a corpurilor de iluminat cu solu\u0163ii LED \u015fi senzori de mi\u015fcare; instalarea de panouri fotovoltaice pentru producerea energiei electrice destinate spa\u0163iilor comune.<\/p>\n<p>Totodat\u0103, \u00een cadrul investi\u0163iei au fost amenajate \u015fi opt sta\u0163ii de \u00eenc\u0103rcare pentru vehicule electrice, care vor fi preluate \u00een administrarea Direc\u0163iei \u00centre\u0163inere \u015fi Administrare Patrimoniu din cadrul Prim\u0103riei Tulcea.<\/p>\n<p>Investi\u0163ia urmeaz\u0103 s\u0103 fie \u00eenchis\u0103 oficial prin aprobarea unui proiect de hot\u0103r\u00e2re \u00een cadrul \u015fedin\u0163ei de Consiliu Local de m\u00e2ine.<\/p>\n<p>\u00a0<\/p>\n<\/div>\n<\/div>\n<div class=\"post-footer\">\n<div class=\"social-icons ed-social-share-icons\">\n<p class=\"share-title\">Share:<\/p>\n<\/div>\n<div class=\"rating-stars\">\n<p id=\"rate-title\" class=\"rate-title\">Rate:<\/p>\n<\/div>\n<\/div>\n<\/article>\n<div class=\"post-content entry-content\">\n<p><strong>Opt blocuri de locuin\u0163e din municipiu au fost modernizate din punct de vedere energetic printr-un proiect finan\u0163at prin Programul Na\u0163ional de Redresare \u015fi Rezilien\u0163\u0103 (PNRR). <\/strong><\/p>\n<p>Lucr\u0103rile au vizat blocurile 1, 2, 5, 6, 8, 9, 10 \u015fi 11 de pe strada G\u0103rii \u015fi au avut ca obiectiv cre\u015fterea eficien\u0163ei energetice a cl\u0103dirilor reziden\u0163iale \u015fi reducerea consumului de energie, \u00eembun\u0103t\u0103\u0163ind astfel condi\u0163iile de locuit pentru sute de tulceni. Valoarea total\u0103 a investi\u0163iei s-a ridicat la 28.138.303,44 lei.<\/p>\n<p>Interven\u0163iile realizate vor contribui la reducerea consumului de energie \u015fi a emisiilor de carbon. Printre lucr\u0103rile prev\u0103zute se num\u0103r\u0103: izolarea termic\u0103 a pere\u0163ilor exteriori cu pl\u0103ci de vat\u0103 bazaltic\u0103 de 15 cm, sistem ETICS \u015fi tencuial\u0103 de protec\u0163ie; \u00eenlocuirea t\u00e2mpl\u0103riei exterioare cu feronerie PVC termoizolant\u0103, geam dublu cu argon \u015fi \u00eenchiderea balcoanelor\/logiilor; termoizolarea plan\u015feelor peste ultimul nivel \u015fi consolidarea plan\u015feului peste subsolul tehnic; modernizarea instala\u0163iilor de distribu\u0163ie ap\u0103, re\u0163eaua de ap\u0103 cald\u0103 menajer\u0103 \u015fi coloanele de \u00eenc\u0103lzire; reabilitarea instala\u0163iei electrice prin \u00eenlocuirea circuitelor deteriorate \u015fi a corpurilor de iluminat cu solu\u0163ii LED \u015fi senzori de mi\u015fcare; instalarea de panouri fotovoltaice pentru producerea energiei electrice destinate spa\u0163iilor comune.<\/p>\n<p>Totodat\u0103, \u00een cadrul investi\u0163iei au fost amenajate \u015fi opt sta\u0163ii de \u00eenc\u0103rcare pentru vehicule electrice, care vor fi preluate \u00een administrarea Direc\u0163iei \u00centre\u0163inere \u015fi Administrare Patrimoniu din cadrul Prim\u0103riei Tulcea.<\/p>\n<p>Investi\u0163ia urmeaz\u0103 s\u0103 fie \u00eenchis\u0103 oficial prin aprobarea unui proiect de hot\u0103r\u00e2re \u00een cadrul \u015fedin\u0163ei de Consiliu Local de m\u00e2ine.<\/p>\n<p>\u00a0<\/p>\n<\/div>\n<div class=\"post-content entry-content\">\n<p><strong>Opt blocuri de locuin\u0163e din municipiu au fost modernizate din punct de vedere energetic printr-un proiect finan\u0163at prin Programul Na\u0163ional de Redresare \u015fi Rezilien\u0163\u0103 (PNRR). <\/strong><\/p>\n<p>Lucr\u0103rile au vizat blocurile 1, 2, 5, 6, 8, 9, 10 \u015fi 11 de pe strada G\u0103rii \u015fi au avut ca obiectiv cre\u015fterea eficien\u0163ei energetice a cl\u0103dirilor reziden\u0163iale \u015fi reducerea consumului de energie, \u00eembun\u0103t\u0103\u0163ind astfel condi\u0163iile de locuit pentru sute de tulceni. Valoarea total\u0103 a investi\u0163iei s-a ridicat la 28.138.303,44 lei.<\/p>\n<p>Interven\u0163iile realizate vor contribui la reducerea consumului de energie \u015fi a emisiilor de carbon. Printre lucr\u0103rile prev\u0103zute se num\u0103r\u0103: izolarea termic\u0103 a pere\u0163ilor exteriori cu pl\u0103ci de vat\u0103 bazaltic\u0103 de 15 cm, sistem ETICS \u015fi tencuial\u0103 de protec\u0163ie; \u00eenlocuirea t\u00e2mpl\u0103riei exterioare cu feronerie PVC termoizolant\u0103, geam dublu cu argon \u015fi \u00eenchiderea balcoanelor\/logiilor; termoizolarea plan\u015feelor peste ultimul nivel \u015fi consolidarea plan\u015feului peste subsolul tehnic; modernizarea instala\u0163iilor de distribu\u0163ie ap\u0103, re\u0163eaua de ap\u0103 cald\u0103 menajer\u0103 \u015fi coloanele de \u00eenc\u0103lzire; reabilitarea instala\u0163iei electrice prin \u00eenlocuirea circuitelor deteriorate \u015fi a corpurilor de iluminat cu solu\u0163ii LED \u015fi senzori de mi\u015fcare; instalarea de panouri fotovoltaice pentru producerea energiei electrice destinate spa\u0163iilor comune.<\/p>\n<p>Totodat\u0103, \u00een cadrul investi\u0163iei au fost amenajate \u015fi opt sta\u0163ii de \u00eenc\u0103rcare pentru vehicule electrice, care vor fi preluate \u00een administrarea Direc\u0163iei \u00centre\u0163inere \u015fi Administrare Patrimoniu din cadrul Prim\u0103riei Tulcea.<\/p>\n<p>Investi\u0163ia urmeaz\u0103 s\u0103 fie \u00eenchis\u0103 oficial prin aprobarea unui proiect de hot\u0103r\u00e2re \u00een cadrul \u015fedin\u0163ei de Consiliu Local de m\u00e2ine.<\/p>\n<p>\u00a0<\/p>\n<\/div>\n<p>[analyse_source url=&#8221;https:\/\/ziaruldelta.ro\/2026\/07\/29\/reabilitarea-energetica-a-opt-blocuri-din-municipiu-a-fost-finalizata\/&#8221;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/ziaruldelta.ro\/wp-content\/uploads\/2026\/07\/reabilitarea.jpg&#8221;] Reabilitarea energetic\u0103 a opt blocuri din municipiu a fost finalizat\u0103 Posted by Claudia Ionescu | Jul 29, 2026 | Economie | Opt blocuri de locuin\u0163e din municipiu au fost modernizate din punct de vedere energetic printr-un proiect finan\u0163at prin Programul Na\u0163ional de Redresare \u015fi Rezilien\u0163\u0103 (PNRR). Lucr\u0103rile au vizat blocurile 1, 2, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[226,206],"class_list":["post-2066699","post","type-post","status-publish","format-standard","hentry","category-romania","tag-crawlmanager","tag-ziaruldelta-ro"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2066699","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2066699"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2066699\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2066699"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2066699"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2066699"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}