{"id":2064588,"date":"2026-07-27T21:00:00","date_gmt":"2026-07-27T18:00:00","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=2064588"},"modified":"2026-07-27T21:00:00","modified_gmt":"2026-07-27T18:00:00","slug":"zona-industriala-de-la-marasesti-in-faza-de-planificare-urbanistica-cj-vrancea-pregateste-terenul-pentru-mari-investitii","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=2064588","title":{"rendered":"Zona industrial\u0103 de la M\u0103r\u0103\u0219e\u0219ti, \u00een faza de planificare urbanistic\u0103. CJ Vrancea preg\u0103te\u0219te terenul pentru mari investi\u021bii"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/www.monitoruldevrancea.ro\/wp-content\/uploads\/2026\/07\/zona-ind-marasesti.png&#8221;]<\/p>\n<div class=\"td_block_wrap tdb_single_content tdi_123 td-pb-border-top td_block_template_1 td-post-content tagdiv-type\" data-td-block-uid=\"tdi_123\">\n<div class=\"tdb-block-inner td-fix-index\">\n<p>Un nou pas important pentru dezvoltarea economic\u0103 a jude\u021bului Vrancea a fost f\u0103cut odat\u0103 cu publicarea de c\u0103tre Consiliul Jude\u021bean Vrancea a anun\u021bului privind inten\u021bia de elaborare a Planului Urbanistic Zonal (PUZ) pentru reglementarea unei viitoare zone industriale \u00een extravilanul ora\u0219ului M\u0103r\u0103\u0219e\u0219ti.<\/p>\n<p>Documenta\u021bia vizeaz\u0103 proiectul \u201ePUZ \u2013 Reglementare zon\u0103 industrial\u0103\u201d, amplasat \u00een extravilanul ora\u0219ului M\u0103r\u0103\u0219e\u0219ti, pe mai multe terenuri \u00eenscrise \u00een c\u0103r\u021bile funciare 56846, 57331, 56219, 57329, 57386, 57335, 56843, 57333, 56841 \u0219i 56842.<\/p>\n<p>Titularul investi\u021biei este UAT Jude\u021bul Vrancea, iar procedura se desf\u0103\u0219oar\u0103 \u00een etapa de adoptare f\u0103r\u0103 evaluare de mediu. Proiectul are la baz\u0103 transferul unei suprafe\u021be de aproximativ 250 de hectare din domeniul public al ora\u0219ului M\u0103r\u0103\u0219e\u0219ti \u00een domeniul public al jude\u021bului Vrancea.<\/p>\n<p>Terenul este situat \u00eentre ora\u0219ul M\u0103r\u0103\u0219e\u0219ti \u0219i satul Haret \u0219i a fost identificat ca fiind cea mai potrivit\u0103 loca\u021bie pentru dezvoltarea unei platforme industriale de mari dimensiuni.<\/p>\n<p>Pre\u0219edintele Consiliului Jude\u021bean Vrancea, <em><strong>Nicu\u0219or Halici<\/strong><\/em>, a explicat c\u0103 preluarea terenului a fost realizat\u0103 la solicitarea administra\u021biei locale, pentru ca autorit\u0103\u021bile jude\u021bene s\u0103 poat\u0103 parcurge toate etapele juridice \u0219i administrative necesare preg\u0103tirii investi\u021biei.<\/p>\n<p>Totodat\u0103, acesta a precizat c\u0103 terenul va fi atribuit prin licita\u021bie public\u0103, la care vor putea participa toate companiile interesate, scopul fiind atragerea unor investi\u021bii majore \u0219i crearea unui mediu concuren\u021bial transparent.<\/p>\n<p>Unul dintre principalele atuuri ale viitoarei zone industriale \u00eel reprezint\u0103 amplasamentul. Terenul beneficiaz\u0103 de acces rapid la principalele coridoare de transport din estul Rom\u00e2niei, fiind situat \u00een apropierea Autostr\u0103zii A7 Moldova, a drumului european DN2 E85 \u0219i a mai multor drumuri jude\u021bene.<\/p>\n<p>Aceast\u0103 pozi\u021bionare ofer\u0103 condi\u021bii favorabile pentru dezvoltarea unor activit\u0103\u021bi de produc\u021bie, logistic\u0103 \u0219i distribu\u021bie, reduc\u00e2nd costurile de transport \u0219i facilit\u00e2nd accesul c\u0103tre principalele pie\u021be din Rom\u00e2nia \u0219i din Europa de Est.<\/p>\n<p>Demersul Consiliului Jude\u021bean este str\u00e2ns legat de inten\u021bia exprimat\u0103 anterior de compania UMB Holding SRL, unul dintre cele mai importante grupuri de construc\u021bii din Rom\u00e2nia.<\/p>\n<p>\u00cen anul 2025, UMB Holding SRL a solicitat administra\u021biei jude\u021bene identificarea unui teren de aproximativ 600 de hectare pentru dezvoltarea unui parc industrial privat \u00een jude\u021bul Vrancea. \u00cen urma analizelor efectuate, singura suprafa\u021b\u0103 compact\u0103 disponibil\u0103 a fost cea de la M\u0103r\u0103\u0219e\u0219ti, cu o \u00eentindere de aproximativ 250 de hectare.<\/p>\n<p>Potrivit declara\u021biilor oficiale ale pre\u0219edintelui CJ Vrancea, administra\u021bia jude\u021bean\u0103 a consultat toate municipiile \u0219i ora\u0219ele din jude\u021b pentru identificarea unor terenuri disponibile, \u00eens\u0103 doar administra\u021bia din M\u0103r\u0103\u0219e\u0219ti a putut pune la dispozi\u021bie o suprafa\u021b\u0103 adecvat\u0103 unei investi\u021bii de asemenea anvergur\u0103.<\/p>\n<p>Conform inten\u021biei prezentate de UMB Holding, investi\u021bia ar urma s\u0103 includ\u0103 unit\u0103\u021bi de produc\u021bie; fabrici \u0219i hale industriale; centre logistice \u0219i de distribu\u021bie; ateliere tehnologice; spa\u021bii destinate cercet\u0103rii \u0219i inov\u0103rii; infrastructur\u0103 tehnic\u0103 necesar\u0103 func\u021bion\u0103rii platformei industriale.<\/p>\n<p>Dac\u0103 proiectul va fi implementat integral, acesta ar putea genera c\u00e2teva sute sau chiar mii de locuri de munc\u0103 \u0219i ar reprezenta una dintre cele mai importante investi\u021bii private realizate \u00een jude\u021bul Vrancea \u00een ultimele decenii.<\/p>\n<p><strong>Beneficii pentru economia jude\u021bului<\/strong><\/p>\n<p>Autorit\u0103\u021bile jude\u021bene consider\u0103 c\u0103 dezvoltarea unei zone industriale la M\u0103r\u0103\u0219e\u0219ti poate avea efecte economice importante: atragerea investitorilor rom\u00e2ni \u0219i str\u0103ini; diversificarea economiei locale; crearea de noi locuri de munc\u0103; cre\u0219terea veniturilor la bugetele locale; dezvoltarea infrastructurii; reducerea migra\u021biei for\u021bei de munc\u0103 tinere c\u0103tre alte jude\u021be sau \u00een str\u0103in\u0103tate.<\/p>\n<p>Pre\u0219edintele Consiliului Jude\u021bean Vrancea, <em><strong>Nicu\u0219or Halici<\/strong><\/em>, \u0219i-a reafirmat sprijinul pentru acest demers, declar\u00e2nd c\u0103 va sus\u021bine \u00een continuare proiectele care contribuie la modernizarea jude\u021bului \u0219i la atragerea investi\u021biilor \u00een economia real\u0103.<\/p>\n<p>\u201e<em><strong>Sus\u021bin acest proiect cu toat\u0103 convingerea \u0219i voi sprijini \u00een continuare ini\u021biativele care transform\u0103 Vrancea \u00eentr-un jude\u021b modern, conectat la oportunit\u0103\u021bile economiei reale<\/strong><\/em>\u201d, a precizat pre\u0219edintele <em><strong>Nicu\u0219or Halici<\/strong><\/em>.<\/p>\n<\/div>\n<\/div>\n<p>[analyse_source url=&#8221;https:\/\/www.monitoruldevrancea.ro\/2026\/07\/28\/zona-industriala-de-la-marasesti-in-faza-de-planificare-urbanistica-cj-vrancea-pregateste-terenul-pentru-mari-investitii\/&#8221;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/www.monitoruldevrancea.ro\/wp-content\/uploads\/2026\/07\/zona-ind-marasesti.png&#8221;] Un nou pas important pentru dezvoltarea economic\u0103 a jude\u021bului Vrancea a fost f\u0103cut odat\u0103 cu publicarea de c\u0103tre Consiliul Jude\u021bean Vrancea a anun\u021bului privind inten\u021bia de elaborare a Planului Urbanistic Zonal (PUZ) pentru reglementarea unei viitoare zone industriale \u00een extravilanul ora\u0219ului M\u0103r\u0103\u0219e\u0219ti. Documenta\u021bia vizeaz\u0103 proiectul \u201ePUZ \u2013 Reglementare zon\u0103 industrial\u0103\u201d, amplasat \u00een [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[226,209],"class_list":["post-2064588","post","type-post","status-publish","format-standard","hentry","category-romania","tag-crawlmanager","tag-monitoruldevrancea-ro"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2064588","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2064588"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2064588\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2064588"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2064588"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2064588"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}