{"id":2062648,"date":"2026-07-24T08:53:25","date_gmt":"2026-07-24T05:53:25","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=2062648"},"modified":"2026-07-24T08:53:25","modified_gmt":"2026-07-24T05:53:25","slug":"lucrarile-la-dj692-avanseaza-rapid-simonis-constructorul-promite-finalizarea-inainte-de-termen-video","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=2062648","title":{"rendered":"Lucr\u0103rile la DJ692 avanseaz\u0103 rapid. Simonis: Constructorul promite finalizarea \u00eenainte de termen (video)"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/renasterea.ro\/ro\/wp-content\/uploads\/2026\/07\/lucrari-dj-692.pnghttps:\/\/renasterea.ro\/ro\/wp-content\/uploads\/2026\/07\/lucrari-dj-692.png&#8221;]<\/p>\n<div class=\"entry-content\"><img loading=\"lazy\" decoding=\"async\" width=\"650\" height=\"377\" src=\"https:\/\/renasterea.ro\/ro\/wp-content\/uploads\/2026\/07\/lucrari-dj-692.png\" class=\"attachment-medium size-medium wp-post-image\" alt=\"Lucr\u0103rile la DJ692 avanseaz\u0103 rapid. Simonis: Constructorul promite finalizarea \u00eenainte de termen\" title=\"Lucr\u0103rile la DJ692 avanseaz\u0103 rapid. Simonis: Constructorul promite finalizarea \u00eenainte de termen (video) 1\"><\/p>\n<h4>Lucr\u0103rile la DJ692 avanseaz\u0103 rapid. Simonis: Constructorul promite finalizarea \u00eenainte de termen<\/h4>\n<p>Lucr\u0103rile de l\u0103rgire la patru benzi a Drumului Jude\u021bean 692, pe tronsonul dintre comuna S\u00e2nandrei \u0219i DN69, Timi\u0219oara-Arad, au ajuns la stadiul de aproape 70 la sut\u0103, la doar c\u00e2teva luni de la semnarea contractului.<\/p>\n<p>Pre\u0219edintele Consiliului Jude\u021bean Timi\u0219, Alfred Simonis, spune c\u0103 ritmul este unul foarte bun, iar constructorul a dat asigur\u0103ri c\u0103 investi\u021bia va fi finalizat\u0103 \u00eenainte de termen.<\/p>\n<p>\u201dS-a semnat contractul la final de februarie, organizarea de \u0219antier a fost \u00een martie, lucr\u0103rile au \u00eenceput \u00een aprilie, iar ast\u0103zi, \u00een luna iulie, avem aproape 70% grad de realizare. Vorbim despre proiectul de l\u0103rgire la patru benzi a DJ692 ce face leg\u0103tura \u00eentre comuna S\u00e2nandrei \u0219i DN69, Timi\u0219oara-Arad.<\/p>\n<p>Am fost azi pe \u0219antier \u0219i am apreciat ritmul bun de p\u00e2n\u0103 acum, iar constructorul ne-a promis c\u0103 va finaliza lucrarea \u00eenainte de termen.<\/p>\n<h2>CITE\u0218TE \u0218I:\u00a0<span><a href=\"https:\/\/renasterea.ro\/politistii-locali-din-timisoara-au-dat-aproape-440-de-amenzi-unor-soferi-care-au-oprit-cu-autoturismele-in-statiile-mijloacelor-de-transport-in-comun\/\" target=\"_blank\" rel=\"noopener\">Lucr\u0103rile sunt avansate. Primul strat de asfalt a fost turnat pe aproape toat\u0103 lungimea drumului pe cele 4 benzi, iar \u00een paralel se lucreaz\u0103 la cele dou\u0103 sensuri giratorii \u0219i la pista de biciclete.<\/a><\/span><\/h2>\n<p>Investi\u021bia dep\u0103\u0219e\u0219te 42 de milioane de lei \u0219i este finan\u021bat\u0103 integral din bugetul Consiliului Jude\u021bean\u201d, transmite Alfred Simonis, pre\u0219edintele Consiliului Jude\u021bean Timi\u0219.<\/p>\n<iframe loading=\"lazy\" src=\"https:\/\/www.facebook.com\/plugins\/video.php?height=476&amp;href=https%3A%2F%2Fwww.facebook.com%2Freel%2F1026789497078606%2F&amp;show_text=false&amp;width=267&amp;t=0\" width=\"267\" height=\"476\" frameborder scrolling=\"no\" allowfullscreen=\"allowfullscreen\"><\/iframe>\n<\/div>\n<p>[analyse_source url=&#8221;https:\/\/renasterea.ro\/lucrarile-la-dj692-avanseaza-rapid-simonis-constructorul-promite-finalizarea-inainte-de-termen-video\/&#8221;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/renasterea.ro\/ro\/wp-content\/uploads\/2026\/07\/lucrari-dj-692.pnghttps:\/\/renasterea.ro\/ro\/wp-content\/uploads\/2026\/07\/lucrari-dj-692.png&#8221;] Lucr\u0103rile la DJ692 avanseaz\u0103 rapid. Simonis: Constructorul promite finalizarea \u00eenainte de termen Lucr\u0103rile de l\u0103rgire la patru benzi a Drumului Jude\u021bean 692, pe tronsonul dintre comuna S\u00e2nandrei \u0219i DN69, Timi\u0219oara-Arad, au ajuns la stadiul de aproape 70 la sut\u0103, la doar c\u00e2teva luni de la semnarea contractului. Pre\u0219edintele Consiliului Jude\u021bean Timi\u0219, Alfred [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[226,188],"class_list":["post-2062648","post","type-post","status-publish","format-standard","hentry","category-romania","tag-crawlmanager","tag-renasterea-ro"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2062648","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2062648"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2062648\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2062648"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2062648"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2062648"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}