{"id":2055016,"date":"2026-07-21T10:33:57","date_gmt":"2026-07-21T07:33:57","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=2055016"},"modified":"2026-07-21T10:33:57","modified_gmt":"2026-07-21T07:33:57","slug":"cartierul-energiei-din-grozavesti-hub-ul-de-50-000-000-de-euro-pentru-sinecurile-din-sistem-in-timp-ce-bucurestenii-se-spala-cu-apa-rece","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=2055016","title":{"rendered":"Cartierul Energiei din Groz\u0103ve\u0219ti: Hub-ul de 50.000.000 de euro pentru sinecurile din sistem \u00een timp ce bucure\u0219tenii se spal\u0103 cu ap\u0103 rece"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/60m.ro\/wp-content\/uploads\/2026\/07\/759d0cbf-5c6f-402c-884b-0783d207e3c5-780&#215;470.png.webp&#8221;]<\/p>\n<div class=\"articleBody\" data-key=\"articleBody\">\nPentru c\u0103 problema apei calde \u00een Capital\u0103 este ca \u0219i rezolvat\u0103, av\u00e2nd \u00een vedere c\u0103 e var\u0103 \u0219i oricum ne prie\u0219te du\u0219ul rece, \u0219efii de la Elcen au trecut la lucruri cu adev\u0103rat importante. P\u00e2n\u0103 c\u00e2nd compania va fi transferat\u0103 de la Ministerul Energiei la Prim\u0103ria Capitalei, conducerea insist\u0103 s\u0103 pun\u0103 pe picioare un proiect numit grandios \u201eCartierul Energiei\u201d. Un mega-hub energetic planificat \u00een zona Groz\u0103ve\u0219ti, care va \u00eenghi\u021bi nu mai pu\u021bin de\u00a050.000.000 de euro.<\/p>\n<p>Cl\u0103diri de lux pentru companiile de stat \u0219i sinecuri\u0219tii \u021b\u0103rii<\/p>\n<p>Teoretic, acest hub ar trebui s\u0103 eficientizeze \u00eenc\u0103lzirea blocurilor \u0219i s\u0103 rezolve definitiv problema apei calde. \u00cen realitate, Cartierul Energiei \u00eenseamn\u0103 un ansamblu de cl\u0103diri noi de birouri care vor servi drept sedii centrale pentru Ministerul Energiei, Elcen, Transelectrica, Romgaz \u0219i alte companii mamut. Era p\u0103cat ca sinecuri\u0219tii din sistemul energetic s\u0103 stea \u00eempr\u0103\u0219tia\u021bi prin ora\u0219, c\u00e2nd se pot aduna cu to\u021bii \u00een propriul lor cartier de lux.<\/p>\n<p>Studiul de fezabilitate de la un tenor-teolog, dublat ca timp prin acte adi\u021bionale<\/p>\n<p>Proiectul se afl\u0103 deocamdat\u0103 \u00een faza studiului de fezabilitate, pentru care Elcen a pl\u0103tit suma de\u00a04.500.000 de lei, plus TVA. Contractul a fost c\u00e2\u0219tigat \u00een octombrie 2023 de asocierea Vego Concept Engineering \u0219i Vego Design Expertise, companii de\u021binute de Virgil Profeanu, un personaj polivalent: tenor, teolog \u0219i arhitect nemembru al Ordinului Arhitec\u021bilor, cu un portofoliu plin de contracte publice.<\/p>\n<p>Desf\u0103\u0219urarea contractului arat\u0103 cam a\u0219a:<\/p>\n<p>Termenul ini\u021bial:\u00a0Studiul trebuia finalizat \u00een doar 135 de zile.<\/p>\n<p>Am\u00e2n\u0103rile:\u00a0Prin 2 acte adi\u021bionale recente, cele 135 de zile s-au transformat \u00een peste 300 de zile de \u00eent\u00e2rziere.<\/p>\n<p>P\u00e2n\u0103 c\u00e2nd mega-hub-ul din Groz\u0103ve\u0219ti va fi gata, va mai curge mult\u0103 ap\u0103 rece pe \u021bevile din Bucure\u0219ti \u0219i se vor mai emite zeci de mii de facturi pentru consumatorii care pl\u0103tesc confortul b\u0103ie\u021bilor de\u0219tep\u021bi din energie.<\/p>\n<\/div>\n<p>[analyse_source url=&#8221;https:\/\/60m.ro\/cartierul-energiei-din-grozavesti-hub-ul-de-50-000-000-de-euro-pentru-sinecurile-din-sistem-in-timp-ce-bucurestenii-se-spala-cu-apa-rece\/&#8221;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/60m.ro\/wp-content\/uploads\/2026\/07\/759d0cbf-5c6f-402c-884b-0783d207e3c5-780&#215;470.png.webp&#8221;] Pentru c\u0103 problema apei calde \u00een Capital\u0103 este ca \u0219i rezolvat\u0103, av\u00e2nd \u00een vedere c\u0103 e var\u0103 \u0219i oricum ne prie\u0219te du\u0219ul rece, \u0219efii de la Elcen au trecut la lucruri cu adev\u0103rat importante. P\u00e2n\u0103 c\u00e2nd compania va fi transferat\u0103 de la Ministerul Energiei la Prim\u0103ria Capitalei, conducerea insist\u0103 s\u0103 pun\u0103 pe [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[100,226],"class_list":["post-2055016","post","type-post","status-publish","format-standard","hentry","category-romania","tag-60m-ro","tag-crawlmanager"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2055016","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2055016"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2055016\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2055016"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2055016"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2055016"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}