{"id":2051087,"date":"2026-07-19T08:42:57","date_gmt":"2026-07-19T05:42:57","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=2051087"},"modified":"2026-07-19T08:42:57","modified_gmt":"2026-07-19T05:42:57","slug":"foto-centura-de-vest-a-timisoarei-prinde-contur-este-la-8-dupa-doua-luni-de-lucrari","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=2051087","title":{"rendered":"FOTO. Centura de Vest a Timi\u0219oarei prinde contur. Este la 8%, dup\u0103 dou\u0103 luni de lucr\u0103ri"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/www.tion.ro\/wp-content\/uploads\/2026\/07\/+otf\/1200&#215;630\/pa+AjWQw+1rucm2YDFzRhk5PVF9WRVJZX1NFQ3fLn2eT8jG6ld1v23RYZJqQBoqoh9dRtrkXEE4XHBLCmjc00CHqpO+EIsXL8owptL8KZuL5+KXMty8osPb3SUU=\/4450304WhatsAppImage20260719at1136545.jpeg&#8221;]<\/p>\n<article id=\"post-2318397\" class>\n<div class=\"entry-content clearfix\">\n<div class=\"enewsArticleContent\">\n<p>Direc\u021bia Regional\u0103 de Drumuri \u0219i Poduri (DRDP) Timi\u0219oara anun\u021b\u0103 c\u0103 \u0219antierul Variantei de Ocolire Timi\u0219oara Vest se afl\u0103 \u00eentr-o etap\u0103 de activitate intens\u0103. Potrivit institu\u021biei, decopertarea este aproape de final, iar traseul viitoarei centuri, prev\u0103zut cu c\u00e2te dou\u0103 benzi pe fiecare sens, este deja conturat.<\/p>\n<p>\u00cen paralel cu lucr\u0103rile la terasamente, structuri, pode\u021be \u0219i reloc\u0103ri de utilit\u0103\u021bi, a \u00eenceput executarea pilo\u021bilor de \u00eendesare cu balast. Aceast\u0103 solu\u021bie tehnic\u0103 este folosit\u0103 pentru consolidarea terenului de fundare \u0219i va fi aplicat\u0103 la toate podurile de pe traseu.<\/p>\n<blockquote>\n<p>\u201eAceast\u0103 metod\u0103 este utilizat\u0103 pentru consolidarea terenului de fundare, prin realizarea unor coloane din material granular compactat, care \u00eembun\u0103t\u0103\u021besc capacitatea portant\u0103 a terenului \u0219i reduc tas\u0103rile. Astfel, este asigurat\u0103 o baz\u0103 stabil\u0103 pentru funda\u021biile viitoarelor structuri\u201d, au transmis reprezentan\u021bii DRDP Timi\u0219oara.<\/p>\n<\/blockquote>\n<p>A\u0219adar, la dou\u0103 luni de la emiterea ordinului de \u00eencepere, progresul fizic estimat de antreprenor este de aproximativ 8%.<\/p>\n<div class=\"enews_gallery_holder\">\n<div class=\"ml-gallery\"><a href=\"https:\/\/www.tion.ro\/galeria\/lucrari-centura-timisoara-vest-iulie-2026\/\" class=\"ml-gallery-link\"><img loading=\"lazy\" decoding=\"async\" class=\"nZLGXi lazyload ml-gallery-cover\" src=\"https:\/\/www.tion.ro\/wp-content\/plugins\/endless-core\/images\/1x1.png\" width=\"155\" height=\"100\" data-src=\"https:\/\/www.tion.ro\/wp-content\/uploads\/2026\/07\/4450297WhatsAppImage20260719at1136471.jpeg\" data-srcset=\"https:\/\/www.tion.ro\/wp-content\/uploads\/2026\/07\/+otf\/839x538\/6pKtBmWmCpZeBnvxFu9fak5PVF9WRVJZX1NFQ3sLDSwGl1TlDwhNUbBjNJH4Dmk__gbemTlInPV0UxkC2JcztZcmLoM7Iawjot6Dox+crsj7OIYzQZr__yeGhYBlQ=\/4450297WhatsAppImage20260719at1136471.jpeg 839w,https:\/\/www.tion.ro\/wp-content\/uploads\/2026\/07\/+otf\/100w\/6pKtBmWmCpZeBnvxFu9fak5PVF9WRVJZX1NFQ3sLDSwGl1TlDwhNUbBjNJH4Dmk__gbemTlInPV0UxkC2JcztZcmLoM7Iawjot6Dox+crsj7OIYzQZr__yeGhYBlQ=\/4450297WhatsAppImage20260719at1136471.jpeg 100w\" data-sizes=\"auto\"><\/p>\n<p class=\"wp-caption-text-gallery\">Lucr\u0103ri Centura Timi\u0219oara Vest \u2013 iulie 2026<\/p>\n<p><\/a><\/div>\n<\/div>\n<p>foto: DRDP Timi\u0219oara<\/p>\n<h3><strong>Contract de peste 300 de milioane de euro<\/strong><\/h3>\n<p>De-a lungul traseului vor fi amenajate 10 lucr\u0103ri de art\u0103 \u0219i patru noduri rutiere. Printre altele, ar fi de amintit pasajele peste DN 59A (Timi\u0219oara \u2013 Jimbolia) \u0219i CFR 100 (\u00een lungime de 750 m), peste DN 6 \u0219i CFR 133 (\u00een lungime de 450 m) \u0219i podul peste r\u00e2ul Bega \u0219i peste rezervoarele de n\u0103mol (\u00een lungime de 450 m). Vor fi amenajate \u0219i patru noduri rutiere la intersec\u021biile cu DN 69 Timi\u0219oara \u2013 Arad\/VTM Nord, DN 6 Timi\u0219oara \u2013 Cenad, DN 59A Timi\u0219oara \u2013 S\u0103c\u0103laz \u0219i Radiala Nou\u0103 de Vest.<\/p>\n<p>Licita\u021bia pentru proiectare \u0219i execu\u021bie a fost lansat\u0103 la \u00eenceputul lui februarie 2024. Trei luni mai t\u00e2rziu, erau depuse cinci oferte, <a href=\"https:\/\/www.tion.ro\/stirile-judetului-timis\/peste-300-de-milioane-de-euro-pentru-realizarea-centurii-timisoara-vest-va-fi-construita-de-o-firma-din-turcia-1903259\/\" target=\"_blank\" rel=\"noopener\"><b>fiind desemnat\u0103 c\u00e2\u0219tig\u0103toare firma turc\u0103 NUROL \u0130n\u015faat. <\/b><\/a>Din cauza contesta\u021biilor, \u00eens\u0103, contractul a putut fi semnat de abia<a href=\"https:\/\/www.tion.ro\/stirile-judetului-timis\/in-sfarsit-a-fost-semnat-contractul-pentru-lucrarile-la-centura-timisoara-vest-1994899\/\" target=\"_blank\" rel=\"noopener\"><b> la finalul lunii ianuarie 2025<\/b><\/a><b>. <\/b>Valoarea acestuia: 1,41 miliarde de lei, f\u0103r\u0103 TVA (1,68 miliarde de lei sau aproximativ 340 de milioane de euro, cu TVA), cu finan\u021bare asigurat\u0103 prin Programul de Transport (2021-2027).<\/p>\n<p>Partea de proiectare ar fi trebuit s\u0103 dureze numai \u0219ase luni. Cu proiectul tehnic aproape gata \u00eenc\u0103 din var\u0103, lucr\u0103rile au fost am\u00e2nate din cauza schimb\u0103rii guvernului, <strong><a href=\"https:\/\/www.tion.ro\/stirile-judetului-timis\/proiectul-centurii-vest-intarziat-de-schimbarile-din-guvern-trebuie-reluat-procesul-de-avizare-2103063\/\" target=\"_blank\" rel=\"noopener\">fiind nevoie de reluarea procedurilor de avizare<\/a><\/strong>. P\u00e2n\u0103 la urm\u0103, <strong><a href=\"https:\/\/www.tion.ro\/stirile-judetului-timis\/de-joi-incep-lucrarile-la-centura-timisoara-vest-turcii-de-la-nurol-au-doi-ani-sa-o-finalizeze-2274040\/\" target=\"_blank\" rel=\"noopener\">lucr\u0103rile propriu-zise au \u00eenceput la mijlocul lunii mai<\/a><\/strong>.<\/p>\n<div class=\"fbShareLikeTwitterAndEmailContainer\">\n<div class=\"wrapper\">\n<div class=\"email\">\n<div id=\"mailto-pop\" class=\"pop-form pop-form-mailto\">\n<div class=\"pop-form-header\">\n<h4>Trimite articolul<\/h4>\n<p><a class=\"pop-form-close\">X<\/a><\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"tagsContainer\">\n<div class=\"tagsLabel\">Taguri:<\/div>\n<div class=\"tags\">\n<div class=\"tag\"><a href=\"https:\/\/www.tion.ro\/cimke\/centura-timisoara-vest\" rel=\"tag\"><span class=\"link\">centura timisoara vest<\/span><span class=\"separator\">,<\/span><\/a><\/div>\n<div class=\"tag\"><a href=\"https:\/\/www.tion.ro\/cimke\/drdp-timisoara\" rel=\"tag\"><span class=\"link\">drdp timisoara<\/span><span class=\"separator\">,<\/span><\/a><\/div>\n<div class=\"tag\"><a href=\"https:\/\/www.tion.ro\/cimke\/nurol-insaat\" rel=\"tag\"><span class=\"link\">NUROL \u0130n\u015faat<\/span><\/a><\/div>\n<\/div>\n<\/div>\n<div class=\"comments\">\n<div class=\"top\">\n<div class=\"commentsNumber\"><span class=\"number\">0<\/span><span class=\"text\">Comentarii<\/span><\/div>\n<\/div>\n<div class=\"center\">\n<div id=\"respond\" class=\"comment-respond\">\n<h3 id=\"reply-title\" class=\"comment-reply-title\"><small><a rel=\"nofollow\" id=\"cancel-comment-reply-link\" href=\"https:\/\/www.tion.ro\/stirile-judetului-timis\/foto-centura-de-vest-a-timisoarei-prinde-contur-este-la-8-dupa-doua-luni-de-lucrari-2318397\/#respond\">Cancel reply<\/a><\/small><\/h3>\n<p class=\"comment-notes\"><span id=\"email-notes\">Your email address will not be published.<\/span><span class=\"required-field-message\">Required fields are marked <span class=\"required\">*<\/span><\/span><\/p>\n<p class=\"commentFormComment\"><span id=\"commentFormCount\"><br \/>\n                            inca<br \/>\n                            <span id=\"countCommentText\">1000<\/span><br \/>\n                            caractere ramase<br \/>\n                        <\/span><\/p>\n<\/div>\n<\/div>\n<div class=\"bottom\">\n<p class=\"forumDisclaimerHuRo\">\n            Citi\u021bi principiile noastre de moderare <a href=\"https:\/\/www.tion.ro\/reguli-postare-comentarii\/\" target=\"_blank\">aici<\/a>!\n        <\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/article>\n<div class=\"entry-content clearfix\">\n<div class=\"enewsArticleContent\">\n<p>Direc\u021bia Regional\u0103 de Drumuri \u0219i Poduri (DRDP) Timi\u0219oara anun\u021b\u0103 c\u0103 \u0219antierul Variantei de Ocolire Timi\u0219oara Vest se afl\u0103 \u00eentr-o etap\u0103 de activitate intens\u0103. Potrivit institu\u021biei, decopertarea este aproape de final, iar traseul viitoarei centuri, prev\u0103zut cu c\u00e2te dou\u0103 benzi pe fiecare sens, este deja conturat.<\/p>\n<p>\u00cen paralel cu lucr\u0103rile la terasamente, structuri, pode\u021be \u0219i reloc\u0103ri de utilit\u0103\u021bi, a \u00eenceput executarea pilo\u021bilor de \u00eendesare cu balast. Aceast\u0103 solu\u021bie tehnic\u0103 este folosit\u0103 pentru consolidarea terenului de fundare \u0219i va fi aplicat\u0103 la toate podurile de pe traseu.<\/p>\n<blockquote>\n<p>\u201eAceast\u0103 metod\u0103 este utilizat\u0103 pentru consolidarea terenului de fundare, prin realizarea unor coloane din material granular compactat, care \u00eembun\u0103t\u0103\u021besc capacitatea portant\u0103 a terenului \u0219i reduc tas\u0103rile. Astfel, este asigurat\u0103 o baz\u0103 stabil\u0103 pentru funda\u021biile viitoarelor structuri\u201d, au transmis reprezentan\u021bii DRDP Timi\u0219oara.<\/p>\n<\/blockquote>\n<p>A\u0219adar, la dou\u0103 luni de la emiterea ordinului de \u00eencepere, progresul fizic estimat de antreprenor este de aproximativ 8%.<\/p>\n<div class=\"enews_gallery_holder\">\n<div class=\"ml-gallery\"><a href=\"https:\/\/www.tion.ro\/galeria\/lucrari-centura-timisoara-vest-iulie-2026\/\" class=\"ml-gallery-link\"><img loading=\"lazy\" decoding=\"async\" class=\"nZLGXi lazyload ml-gallery-cover\" src=\"https:\/\/www.tion.ro\/wp-content\/plugins\/endless-core\/images\/1x1.png\" width=\"155\" height=\"100\" data-src=\"https:\/\/www.tion.ro\/wp-content\/uploads\/2026\/07\/4450297WhatsAppImage20260719at1136471.jpeg\" data-srcset=\"https:\/\/www.tion.ro\/wp-content\/uploads\/2026\/07\/+otf\/839x538\/6pKtBmWmCpZeBnvxFu9fak5PVF9WRVJZX1NFQ3sLDSwGl1TlDwhNUbBjNJH4Dmk__gbemTlInPV0UxkC2JcztZcmLoM7Iawjot6Dox+crsj7OIYzQZr__yeGhYBlQ=\/4450297WhatsAppImage20260719at1136471.jpeg 839w,https:\/\/www.tion.ro\/wp-content\/uploads\/2026\/07\/+otf\/100w\/6pKtBmWmCpZeBnvxFu9fak5PVF9WRVJZX1NFQ3sLDSwGl1TlDwhNUbBjNJH4Dmk__gbemTlInPV0UxkC2JcztZcmLoM7Iawjot6Dox+crsj7OIYzQZr__yeGhYBlQ=\/4450297WhatsAppImage20260719at1136471.jpeg 100w\" data-sizes=\"auto\"><\/p>\n<p class=\"wp-caption-text-gallery\">Lucr\u0103ri Centura Timi\u0219oara Vest \u2013 iulie 2026<\/p>\n<p><\/a><\/div>\n<\/div>\n<p>foto: DRDP Timi\u0219oara<\/p>\n<h3><strong>Contract de peste 300 de milioane de euro<\/strong><\/h3>\n<p>De-a lungul traseului vor fi amenajate 10 lucr\u0103ri de art\u0103 \u0219i patru noduri rutiere. Printre altele, ar fi de amintit pasajele peste DN 59A (Timi\u0219oara \u2013 Jimbolia) \u0219i CFR 100 (\u00een lungime de 750 m), peste DN 6 \u0219i CFR 133 (\u00een lungime de 450 m) \u0219i podul peste r\u00e2ul Bega \u0219i peste rezervoarele de n\u0103mol (\u00een lungime de 450 m). Vor fi amenajate \u0219i patru noduri rutiere la intersec\u021biile cu DN 69 Timi\u0219oara \u2013 Arad\/VTM Nord, DN 6 Timi\u0219oara \u2013 Cenad, DN 59A Timi\u0219oara \u2013 S\u0103c\u0103laz \u0219i Radiala Nou\u0103 de Vest.<\/p>\n<p>Licita\u021bia pentru proiectare \u0219i execu\u021bie a fost lansat\u0103 la \u00eenceputul lui februarie 2024. Trei luni mai t\u00e2rziu, erau depuse cinci oferte, <a href=\"https:\/\/www.tion.ro\/stirile-judetului-timis\/peste-300-de-milioane-de-euro-pentru-realizarea-centurii-timisoara-vest-va-fi-construita-de-o-firma-din-turcia-1903259\/\" target=\"_blank\" rel=\"noopener\"><b>fiind desemnat\u0103 c\u00e2\u0219tig\u0103toare firma turc\u0103 NUROL \u0130n\u015faat. <\/b><\/a>Din cauza contesta\u021biilor, \u00eens\u0103, contractul a putut fi semnat de abia<a href=\"https:\/\/www.tion.ro\/stirile-judetului-timis\/in-sfarsit-a-fost-semnat-contractul-pentru-lucrarile-la-centura-timisoara-vest-1994899\/\" target=\"_blank\" rel=\"noopener\"><b> la finalul lunii ianuarie 2025<\/b><\/a><b>. <\/b>Valoarea acestuia: 1,41 miliarde de lei, f\u0103r\u0103 TVA (1,68 miliarde de lei sau aproximativ 340 de milioane de euro, cu TVA), cu finan\u021bare asigurat\u0103 prin Programul de Transport (2021-2027).<\/p>\n<p>Partea de proiectare ar fi trebuit s\u0103 dureze numai \u0219ase luni. Cu proiectul tehnic aproape gata \u00eenc\u0103 din var\u0103, lucr\u0103rile au fost am\u00e2nate din cauza schimb\u0103rii guvernului, <strong><a href=\"https:\/\/www.tion.ro\/stirile-judetului-timis\/proiectul-centurii-vest-intarziat-de-schimbarile-din-guvern-trebuie-reluat-procesul-de-avizare-2103063\/\" target=\"_blank\" rel=\"noopener\">fiind nevoie de reluarea procedurilor de avizare<\/a><\/strong>. P\u00e2n\u0103 la urm\u0103, <strong><a href=\"https:\/\/www.tion.ro\/stirile-judetului-timis\/de-joi-incep-lucrarile-la-centura-timisoara-vest-turcii-de-la-nurol-au-doi-ani-sa-o-finalizeze-2274040\/\" target=\"_blank\" rel=\"noopener\">lucr\u0103rile propriu-zise au \u00eenceput la mijlocul lunii mai<\/a><\/strong>.<\/p>\n<div class=\"fbShareLikeTwitterAndEmailContainer\">\n<div class=\"wrapper\">\n<div class=\"email\">\n<div id=\"mailto-pop\" class=\"pop-form pop-form-mailto\">\n<div class=\"pop-form-header\">\n<h4>Trimite articolul<\/h4>\n<p><a class=\"pop-form-close\">X<\/a><\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"tagsContainer\">\n<div class=\"tagsLabel\">Taguri:<\/div>\n<div class=\"tags\">\n<div class=\"tag\"><a href=\"https:\/\/www.tion.ro\/cimke\/centura-timisoara-vest\" rel=\"tag\"><span class=\"link\">centura timisoara vest<\/span><span class=\"separator\">,<\/span><\/a><\/div>\n<div class=\"tag\"><a href=\"https:\/\/www.tion.ro\/cimke\/drdp-timisoara\" rel=\"tag\"><span class=\"link\">drdp timisoara<\/span><span class=\"separator\">,<\/span><\/a><\/div>\n<div class=\"tag\"><a href=\"https:\/\/www.tion.ro\/cimke\/nurol-insaat\" rel=\"tag\"><span class=\"link\">NUROL \u0130n\u015faat<\/span><\/a><\/div>\n<\/div>\n<\/div>\n<div class=\"comments\">\n<div class=\"top\">\n<div class=\"commentsNumber\"><span class=\"number\">0<\/span><span class=\"text\">Comentarii<\/span><\/div>\n<\/div>\n<div class=\"center\">\n<div id=\"respond\" class=\"comment-respond\">\n<h3 id=\"reply-title\" class=\"comment-reply-title\"><small><a rel=\"nofollow\" id=\"cancel-comment-reply-link\" href=\"https:\/\/www.tion.ro\/stirile-judetului-timis\/foto-centura-de-vest-a-timisoarei-prinde-contur-este-la-8-dupa-doua-luni-de-lucrari-2318397\/#respond\">Cancel reply<\/a><\/small><\/h3>\n<p class=\"comment-notes\"><span id=\"email-notes\">Your email address will not be published.<\/span><span class=\"required-field-message\">Required fields are marked <span class=\"required\">*<\/span><\/span><\/p>\n<p class=\"commentFormComment\"><span id=\"commentFormCount\"><br \/>\n                            inca<br \/>\n                            <span id=\"countCommentText\">1000<\/span><br \/>\n                            caractere ramase<br \/>\n                        <\/span><\/p>\n<\/div>\n<\/div>\n<div class=\"bottom\">\n<p class=\"forumDisclaimerHuRo\">\n            Citi\u021bi principiile noastre de moderare <a href=\"https:\/\/www.tion.ro\/reguli-postare-comentarii\/\" target=\"_blank\">aici<\/a>!\n        <\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<p>[analyse_source url=&#8221;https:\/\/www.tion.ro\/stirile-judetului-timis\/foto-centura-de-vest-a-timisoarei-prinde-contur-este-la-8-dupa-doua-luni-de-lucrari-2318397\/&#8221;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/www.tion.ro\/wp-content\/uploads\/2026\/07\/+otf\/1200&#215;630\/pa+AjWQw+1rucm2YDFzRhk5PVF9WRVJZX1NFQ3fLn2eT8jG6ld1v23RYZJqQBoqoh9dRtrkXEE4XHBLCmjc00CHqpO+EIsXL8owptL8KZuL5+KXMty8osPb3SUU=\/4450304WhatsAppImage20260719at1136545.jpeg&#8221;] Direc\u021bia Regional\u0103 de Drumuri \u0219i Poduri (DRDP) Timi\u0219oara anun\u021b\u0103 c\u0103 \u0219antierul Variantei de Ocolire Timi\u0219oara Vest se afl\u0103 \u00eentr-o etap\u0103 de activitate intens\u0103. Potrivit institu\u021biei, decopertarea este aproape de final, iar traseul viitoarei centuri, prev\u0103zut cu c\u00e2te dou\u0103 benzi pe fiecare sens, este deja conturat. \u00cen paralel cu lucr\u0103rile la terasamente, structuri, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[226,191],"class_list":["post-2051087","post","type-post","status-publish","format-standard","hentry","category-romania","tag-crawlmanager","tag-tion-ro"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2051087","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2051087"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2051087\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2051087"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2051087"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2051087"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}