{"id":2049451,"date":"2026-07-18T07:51:37","date_gmt":"2026-07-18T04:51:37","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=2049451"},"modified":"2026-07-18T07:51:37","modified_gmt":"2026-07-18T04:51:37","slug":"activitate-intensa-pe-santierul-centurii-de-vest-a-timisoarei-stadiul-lucrarilor-a-ajuns-la-8-foto","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=2049451","title":{"rendered":"Activitate intens\u0103 pe \u015fantierul centurii de vest a Timi\u015foarei: stadiul lucr\u0103rilor a ajuns la 8% FOTO"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;http:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/07\/749767383_1516126299998128_7720011570594468926_n.jpg&#8221;]<\/p>\n<div class=\"post-content-bd\">\n<p>Pe \u015fantierul centurii de vest a Timi\u015foarei este o activitate intens\u0103. Potrivit Direc\u0163iei Regionale de Drumuri \u015fi Poduri Timi\u015foara, decopertarea este aproape de final, iar traseul viitoarei centuri, cu c\u00e2te dou\u0103 benzi pe fiecare sens, este deja conturat.<\/p>\n<p><em>\u201cPe l\u00e2ng\u0103 lucr\u0103rile care se desf\u0103\u0219oar\u0103 \u00een mod curent la terasamente, structuri, pode\u021be \u0219i reloc\u0103ri de utilit\u0103\u021bi, a \u00eenceput o nou\u0103 etap\u0103 important\u0103: executarea pilo\u021bilor de \u00eendesare cu balast. Aceast\u0103 metod\u0103 este utilizat\u0103 pentru consolidarea terenului de fundare, prin realizarea unor coloane din material granular compactat, care \u00eembun\u0103t\u0103\u021besc capacitatea portant\u0103 a terenului \u0219i reduc tas\u0103rile. Astfel, este asigurat\u0103 o baz\u0103 stabil\u0103 pentru funda\u021biile viitoarelor structuri. Solu\u021bia tehnic\u0103 va fi aplicat\u0103 la toate podurile de pe traseu\u201d<\/em>, a informat DRDP Timi\u015foara.<\/p>\n<p>La dou\u0103 luni de la emiterea ordinului de \u00eencepere, progresul fizic estimat de antreprenor este de aproximativ 8%.<\/p>\n<p>Constructorul centurii de vest a Timi\u015foarei, \u00een lungime de aproximativ 14 kilometri, cu dou\u0103 benzi pe fiecare sens \u0219i patru noduri rutiere denivelate, este NUROL \u0130n\u015faat. DRDP Timi\u0219oara este supervizor al acestui contract derulat de CNAIR.<\/p>\n<div id=\"gallery-1\" class=\"gallery galleryid-188015 gallery-columns-3 gallery-size-thumbnail\">\n<figure class=\"gallery-item\">\n<div class=\"gallery-icon landscape\"><a href=\"https:\/\/www.banatulmeu.ro\/activitate-intensa-pe-santierul-centurii-de-vest-a-timisoarei-stadiul-lucrarilor-a-ajuns-la-8-foto\/default-211\/\"><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/07\/748597245_3651047155049865_6334029160973179992_n-150x150.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt aria-describedby=\"gallery-1-188022\"><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/07\/748597245_3651047155049865_6334029160973179992_n-150x150.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt aria-describedby=\"gallery-1-188022\"><\/a><\/div><figcaption class=\"wp-caption-text gallery-caption\" id=\"gallery-1-188022\">\n\t\t\t\tdefault<br \/>\n\t\t\t\t<\/figcaption><\/figure>\n<figure class=\"gallery-item\">\n<div class=\"gallery-icon landscape\"><a href=\"https:\/\/www.banatulmeu.ro\/activitate-intensa-pe-santierul-centurii-de-vest-a-timisoarei-stadiul-lucrarilor-a-ajuns-la-8-foto\/default-209\/\"><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/07\/749316497_27722567477381337_8866422565628090895_n-150x150.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt aria-describedby=\"gallery-1-188020\"><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/07\/749316497_27722567477381337_8866422565628090895_n-150x150.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt aria-describedby=\"gallery-1-188020\"><\/a><\/div><figcaption class=\"wp-caption-text gallery-caption\" id=\"gallery-1-188020\">\n\t\t\t\tdefault<br \/>\n\t\t\t\t<\/figcaption><\/figure>\n<figure class=\"gallery-item\">\n<div class=\"gallery-icon landscape\"><a href=\"https:\/\/www.banatulmeu.ro\/activitate-intensa-pe-santierul-centurii-de-vest-a-timisoarei-stadiul-lucrarilor-a-ajuns-la-8-foto\/default-208\/\"><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/07\/749300889_2575558932874438_7156251979457407523_n-150x150.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt aria-describedby=\"gallery-1-188019\"><img decoding=\"async\" loading=\"lazy\" width=\"150\" height=\"150\" src=\"https:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/07\/749300889_2575558932874438_7156251979457407523_n-150x150.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt aria-describedby=\"gallery-1-188019\"><\/a><\/div><figcaption class=\"wp-caption-text gallery-caption\" id=\"gallery-1-188019\">\n\t\t\t\tdefault<br \/>\n\t\t\t\t<\/figcaption><\/figure>\n<figure class=\"gallery-item\">\n<div class=\"gallery-icon landscape\"><a href=\"https:\/\/www.banatulmeu.ro\/activitate-intensa-pe-santierul-centurii-de-vest-a-timisoarei-stadiul-lucrarilor-a-ajuns-la-8-foto\/default-207\/\"><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/07\/751071839_4613735602180707_5214823669516151045_n-150x150.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt aria-describedby=\"gallery-1-188018\"><img decoding=\"async\" loading=\"lazy\" width=\"150\" height=\"150\" src=\"https:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/07\/751071839_4613735602180707_5214823669516151045_n-150x150.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt aria-describedby=\"gallery-1-188018\"><\/a><\/div><figcaption class=\"wp-caption-text gallery-caption\" id=\"gallery-1-188018\">\n\t\t\t\tdefault<br \/>\n\t\t\t\t<\/figcaption><\/figure>\n<figure class=\"gallery-item\">\n<div class=\"gallery-icon landscape\"><a href=\"https:\/\/www.banatulmeu.ro\/activitate-intensa-pe-santierul-centurii-de-vest-a-timisoarei-stadiul-lucrarilor-a-ajuns-la-8-foto\/749119731_1051316224000394_5674513858710208036_n\/\"><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/07\/749119731_1051316224000394_5674513858710208036_n-150x150.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt><img decoding=\"async\" loading=\"lazy\" width=\"150\" height=\"150\" src=\"https:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/07\/749119731_1051316224000394_5674513858710208036_n-150x150.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt><\/a><\/div>\n<\/figure>\n<figure class=\"gallery-item\">\n<div class=\"gallery-icon landscape\"><a href=\"https:\/\/www.banatulmeu.ro\/activitate-intensa-pe-santierul-centurii-de-vest-a-timisoarei-stadiul-lucrarilor-a-ajuns-la-8-foto\/751549641_1015642564597704_3772193513378381524_n\/\"><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/07\/751549641_1015642564597704_3772193513378381524_n-150x150.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt><img decoding=\"async\" loading=\"lazy\" width=\"150\" height=\"150\" src=\"https:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/07\/751549641_1015642564597704_3772193513378381524_n-150x150.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt><\/a><\/div>\n<\/figure>\n<\/div>\n<\/div>\n<p>[analyse_source url=&#8221;https:\/\/www.banatulmeu.ro\/activitate-intensa-pe-santierul-centurii-de-vest-a-timisoarei-stadiul-lucrarilor-a-ajuns-la-8-foto\/&#8221;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;http:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/07\/749767383_1516126299998128_7720011570594468926_n.jpg&#8221;] Pe \u015fantierul centurii de vest a Timi\u015foarei este o activitate intens\u0103. Potrivit Direc\u0163iei Regionale de Drumuri \u015fi Poduri Timi\u015foara, decopertarea este aproape de final, iar traseul viitoarei centuri, cu c\u00e2te dou\u0103 benzi pe fiecare sens, este deja conturat. \u201cPe l\u00e2ng\u0103 lucr\u0103rile care se desf\u0103\u0219oar\u0103 \u00een mod curent la terasamente, structuri, pode\u021be \u0219i [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[204,226],"class_list":["post-2049451","post","type-post","status-publish","format-standard","hentry","category-romania","tag-banatulmeu-ro","tag-crawlmanager"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2049451","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2049451"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2049451\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2049451"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2049451"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2049451"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}