{"id":2048113,"date":"2026-07-16T09:11:05","date_gmt":"2026-07-16T06:11:05","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=2048113"},"modified":"2026-07-16T09:11:05","modified_gmt":"2026-07-16T06:11:05","slug":"autorizatia-pentru-reconstructia-pasarelei-indragostitilor-emisa-lucrarile-incep-in-aceasta-vara-foto","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=2048113","title":{"rendered":"Autorizatia pentru reconstructia Pasarelei Indragostitilor, emisa! Lucrarile incep in aceasta vara FOTO"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;http:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/07\/Indragostitilor-2-e1784194789145.png&#8221;]<\/p>\n<div class=\"post-content-bd\">\n<p>\u00cen scurt timp, \u00eencep lucr\u0103rile de reconstruc\u0163ie a Pasarelei \u00cendr\u0103gosti\u0163ilor din Timi\u015foara. Primarul Dominic Fritz a semnat joi autoriza\u021bia de construire a noului pod pietonal peste Bega. Aceasta a fost emis\u0103 ca urmare a decizie favorabile a Comisiei pentru Solu\u021bionarea Contesta\u021biilor \u00een Domeniul Patrimoniului Cultural Imobil de la nivelul Ministerului Culturii, dup\u0103 un blocaj de aproape un an. \u00cen aceast\u0103 var\u0103, constructorul va demara lucr\u0103rile de amenajare a \u0219antierului \u0219i de demolare a pasarelei existente.<\/p>\n<p><em>\u201eEste cel de-al treilea pod la care \u00eencepem \u0219antierul anul acesta, dup\u0103 Podul Muncii \u0219i cel din zona Polon\u0103. Toate au fost \u00eentr-o stare extrem\u0103 de degradare dup\u0103 decenii \u00een care s-au f\u0103cut doar c\u00e2rpeli \u0219i lucr\u0103ri superficiale de \u00eentre\u021binere. \u0218i aici demol\u0103m pasarela actual\u0103 \u0219i reconstruim de la zero un nou pod pentru pietoni \u0219i bicicli\u0219ti. M\u0103 bucur c\u0103 am reu\u0219it s\u0103 dep\u0103\u0219im blocajele birocratice \u0219i c\u0103 \u00eencepem lucr\u0103rile\u201d<\/em>, a declarat primarul Dominic Fritz.<\/p>\n<p>Noul pod va fi construit din beton armat, cu o lungime de 52 de metri \u0219i o l\u0103\u021bime de 5 metri. Accesul va fi asigurat prin rampe concepute special pentru persoanele cu mobilitate redus\u0103, iar bicicli\u0219tii vor avea rampe dedicate, adiacente treptelor pentru pietoni. Spa\u021biile verzi vor completa rampele intercalate, iar pe ambele maluri ale Beg\u0103i vor fi create puncte de belvedere, unde cei care folosesc podul se vor putea relaxa \u0219i bucura de priveli\u0219te. Iluminatul arhitectural va fi realizat prin benzi LED moderne, integrate at\u00e2t pe pasarel\u0103, c\u00e2t \u0219i pe rampe.<\/p>\n<p>Valoarea contractului de proiectare \u0219i execu\u021bie este de 7,74 milioane de lei, f\u0103r\u0103 TVA. Proiectul este realizat de asocierea CARDINAL D.P. CONSTRUCT (lider) \u0219i CAM PROIECT. Durata estimat\u0103 a lucr\u0103rilor este de opt luni.<\/p>\n<div id=\"gallery-1\" class=\"gallery galleryid-187881 gallery-columns-3 gallery-size-thumbnail\">\n<figure class=\"gallery-item\">\n<div class=\"gallery-icon landscape\"><a href=\"https:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/07\/Indragostitilor-3-e1784194758875.png\"><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/07\/Indragostitilor-3-150x150.png\" class=\"attachment-thumbnail size-thumbnail\" alt><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/07\/Indragostitilor-3-150x150.png\" class=\"attachment-thumbnail size-thumbnail\" alt><\/a><\/div>\n<\/figure>\n<figure class=\"gallery-item\">\n<div class=\"gallery-icon landscape\"><a href=\"https:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/07\/Indragostitilor-1-e1784194735954.png\"><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/07\/Indragostitilor-1-150x150.png\" class=\"attachment-thumbnail size-thumbnail\" alt><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/07\/Indragostitilor-1-150x150.png\" class=\"attachment-thumbnail size-thumbnail\" alt><\/a><\/div>\n<\/figure>\n<figure class=\"gallery-item\">\n<div class=\"gallery-icon landscape\"><a href=\"https:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/07\/Indragostitilor-4-e1784194717983.png\"><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/07\/Indragostitilor-4-150x150.png\" class=\"attachment-thumbnail size-thumbnail\" alt><img decoding=\"async\" loading=\"lazy\" width=\"150\" height=\"150\" src=\"https:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/07\/Indragostitilor-4-150x150.png\" class=\"attachment-thumbnail size-thumbnail\" alt><\/a><\/div>\n<\/figure>\n<figure class=\"gallery-item\">\n<div class=\"gallery-icon landscape\"><a href=\"https:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/07\/Indragostitilor-5-e1784194702879.png\"><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/07\/Indragostitilor-5-150x150.png\" class=\"attachment-thumbnail size-thumbnail\" alt><img decoding=\"async\" loading=\"lazy\" width=\"150\" height=\"150\" src=\"https:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/07\/Indragostitilor-5-150x150.png\" class=\"attachment-thumbnail size-thumbnail\" alt><\/a><\/div>\n<\/figure>\n<\/div>\n<\/div>\n<p>[analyse_source url=&#8221;https:\/\/www.banatulmeu.ro\/autorizatia-pentru-reconstructia-pasarelei-indragostitilor-din-timisoara-emisa-lucrarile-incep-in-aceasta-vara-foto\/&#8221;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;http:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/07\/Indragostitilor-2-e1784194789145.png&#8221;] \u00cen scurt timp, \u00eencep lucr\u0103rile de reconstruc\u0163ie a Pasarelei \u00cendr\u0103gosti\u0163ilor din Timi\u015foara. Primarul Dominic Fritz a semnat joi autoriza\u021bia de construire a noului pod pietonal peste Bega. Aceasta a fost emis\u0103 ca urmare a decizie favorabile a Comisiei pentru Solu\u021bionarea Contesta\u021biilor \u00een Domeniul Patrimoniului Cultural Imobil de la nivelul Ministerului Culturii, dup\u0103 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[204,226],"class_list":["post-2048113","post","type-post","status-publish","format-standard","hentry","category-romania","tag-banatulmeu-ro","tag-crawlmanager"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2048113","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2048113"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2048113\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2048113"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2048113"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2048113"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}