{"id":2039330,"date":"2026-07-10T09:47:04","date_gmt":"2026-07-10T06:47:04","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=2039330"},"modified":"2026-07-10T09:47:04","modified_gmt":"2026-07-10T06:47:04","slug":"se-inchide-traficul-prin-pasajul-solventul-primaria-timisoara-reia-lucrarile","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=2039330","title":{"rendered":"Se inchide traficul prin pasajul Solventul! Primaria Timisoara reia lucrarile"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;http:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/07\/2-2-e1783679486848.jpeg&#8221;]<\/p>\n<div class=\"post-content-bd\">\n<p>Anun\u0163 important pentru \u015foferi! Prim\u0103ria Timi\u015foara reia lucr\u0103rile la pasajul Solventul, astfel c\u0103 traficul va fi \u00eenchis pentru ma\u015fini, pietoni \u015fi bicicli\u015fti \u00een perioada 27 iulie \u2013 31 decembrie. De asemenea, tramvaiele de pe linia 5 vor fi \u00eenlocuite temporar cu autobuze \u00eencep\u00e2nd cu data de 5 august.<\/p>\n<p>Mai precis, pentru integrarea liniilor de tramvai de pe Calea Bogd\u0103ne\u0219tilor, de la Solventul \u0219i de pe Strada G\u0103rii, vor dema lucr\u0103ri de reamenajare a buclei de la ie\u0219irea din pasaj \u0219i de montare a unor aparate speciale de cale. Aceste echipamente automate vor permite schimbarea direc\u021biei tramvaielor \u0219i conectarea noilor trasee.<\/p>\n<p><em>\u201ePasajul Solventul a schimbat deja modul \u00een care se circul\u0103. Mii de \u0219oferi au c\u00e2\u0219tigat timp timp aleg\u00e2nd aceast\u0103 rut\u0103 \u00eentre Rona\u021b, Bla\u0219covici \u0219i Iosefin. Relu\u0103m acum lucr\u0103rile cu etapa care va integra noile linii de tramvai \u0219i conexiunea cu strada G\u0103rii, astfel \u00eenc\u00e2t acest nod de infrastructur\u0103 s\u0103 func\u021bioneze la \u00eentreaga sa capacitate<\/em>\u201d, a afirmat viceprimarul Ruben La\u021bc\u0103u.<\/p>\n<p>Investi\u021bia include \u0219ase aparate de cale: dou\u0103 pentru bucla Calea Bogd\u0103ne\u0219tilor; unul la intrarea \u00een Pasajul Solventul, unul la ie\u0219irea din pasaj, dou\u0103 pe strada G\u0103rii. \u00cen paralel, constructorul va executa lucr\u0103ri de montare a liniei de tramvai \u0219i de reamenajare a buclei de pe Calea Bogd\u0103ne\u0219tilor.<\/p>\n<p>\u201c<em>De la deschiderea traficului, cu restric\u021bii, aproape 829.000 de autoturisme au traversat pasajul dinspre Calea Bogd\u0103ne\u0219tilor, iar aproximativ 543.000 dinspre zona G\u0103rii. Investi\u021bia pe Strada G\u0103rii, cu o nou\u0103 linie de tramvai de peste 1,3 km \u0219i cale dubl\u0103, sta\u021bii noi cu peroane, carosabil modernizat, trotuare noi \u0219i piste de biciclete, este programat\u0103 s\u0103 demareze, de asemenea, \u00een acest an. Proiectul include \u0219i modernizarea re\u021belelor edilitare de ap\u0103, canalizare, gaze \u0219i telecomunica\u021bii, precum \u0219i instalarea unui sistem de supraveghere video integrat \u00een managementul traficului<\/em>\u201c, a transmis Prim\u0103ria Timi\u015foara.<\/p>\n<p>Pasajul Solventul are o valoare de 132 de milioane de lei, din care 89 de milioane de lei de la bugetul local \u0219i 43 de milioane prin programul \u201cAnghel Saligny\u201d. Pasajul face leg\u0103tura \u00eentre Calea Bogd\u0103ne\u0219tilor \u0219i Strada G\u0103rii \u0219i are \u0219osea cu dou\u0103 benzi pe sens, linie dubl\u0103 de tramvai, trotuare \u0219i piste de biciclete.<\/p>\n<div id=\"gallery-1\" class=\"gallery galleryid-187599 gallery-columns-3 gallery-size-thumbnail\">\n<figure class=\"gallery-item\">\n<div class=\"gallery-icon landscape\"><a href=\"https:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/07\/1-2-e1783679448312.jpeg\"><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/07\/1-2-150x150.jpeg\" class=\"attachment-thumbnail size-thumbnail\" alt><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/07\/1-2-150x150.jpeg\" class=\"attachment-thumbnail size-thumbnail\" alt><\/a><\/div>\n<\/figure>\n<figure class=\"gallery-item\">\n<div class=\"gallery-icon landscape\"><a href=\"https:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/07\/4-2-1-e1783679424294.jpeg\"><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/07\/4-2-1-150x150.jpeg\" class=\"attachment-thumbnail size-thumbnail\" alt><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/07\/4-2-1-150x150.jpeg\" class=\"attachment-thumbnail size-thumbnail\" alt><\/a><\/div>\n<\/figure>\n<figure class=\"gallery-item\">\n<div class=\"gallery-icon landscape\"><a href=\"https:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/07\/3-2-e1783679386208.jpeg\"><img loading=\"lazy\" decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/07\/3-2-150x150.jpeg\" class=\"attachment-thumbnail size-thumbnail\" alt><img decoding=\"async\" loading=\"lazy\" width=\"150\" height=\"150\" src=\"https:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/07\/3-2-150x150.jpeg\" class=\"attachment-thumbnail size-thumbnail\" alt><\/a><\/div>\n<\/figure>\n<\/div>\n<\/div>\n<p>[analyse_source url=&#8221;https:\/\/www.banatulmeu.ro\/se-inchide-traficul-prin-pasajul-solventul-primaria-timisoara-reia-lucrarile\/&#8221;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;http:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/07\/2-2-e1783679486848.jpeg&#8221;] Anun\u0163 important pentru \u015foferi! Prim\u0103ria Timi\u015foara reia lucr\u0103rile la pasajul Solventul, astfel c\u0103 traficul va fi \u00eenchis pentru ma\u015fini, pietoni \u015fi bicicli\u015fti \u00een perioada 27 iulie \u2013 31 decembrie. De asemenea, tramvaiele de pe linia 5 vor fi \u00eenlocuite temporar cu autobuze \u00eencep\u00e2nd cu data de 5 august. Mai precis, pentru integrarea [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[204,226],"class_list":["post-2039330","post","type-post","status-publish","format-standard","hentry","category-romania","tag-banatulmeu-ro","tag-crawlmanager"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2039330","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2039330"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2039330\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2039330"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2039330"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2039330"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}