{"id":2039139,"date":"2026-07-10T14:29:27","date_gmt":"2026-07-10T11:29:27","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=2039139"},"modified":"2026-07-10T14:29:27","modified_gmt":"2026-07-10T11:29:27","slug":"gradinita-noua-pe-strada-petrolului-si-fonduri-record-la-babeni-primarul-stefan-bizic-este-cea-mai-mare-finantare-atrasa-vreodata-de-primarie","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=2039139","title":{"rendered":"Gr\u0103dini\u021b\u0103 nou\u0103 pe Strada Petrolului \u0219i fonduri record, la B\u0103beni. Primarul \u0218tefan B\u00eez\u00eec: \u201eEste cea mai mare finan\u021bare atras\u0103 vreodat\u0103 de Prim\u0103rie\u201d"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/www.impactreal.ro\/wp-content\/uploads\/2026\/07\/BABANI-IULIE-2026-432cce483705.jpg&#8221;]<\/p>\n<div class=\"single-news-content\">\n<div class=\"news-image\"><img loading=\"lazy\" decoding=\"async\" width=\"2040\" height=\"1103\" src=\"https:\/\/www.impactreal.ro\/wp-content\/uploads\/2026\/07\/BABANI-IULIE-2026-432cce483705.jpg\" class=\"img-responsive wp-post-image\" alt=\"Gr\u0103dini\u021b\u0103 nou\u0103 pe Strada Petrolului \u0219i fonduri record, la B\u0103beni. Primarul \u0218tefan B\u00eez\u00eec: \u201eEste cea mai mare finan\u021bare atras\u0103 vreodat\u0103 de Prim\u0103rie\u201d\"><\/div>\n<div class=\"news-detail clearfix\">\n<div class=\"entry-meta\"><span class=\"posted-date\"><a href=\"https:\/\/www.impactreal.ro\/2026\/07\/10\/gradinita-noua-pe-strada-petrolului-si-fonduri-record-la-babeni-primarul-stefan-bizic-este-cea-mai-mare-finantare-atrasa-vreodata-de-primarie\/\" rel=\"bookmark\"><time class=\"entry-date published updated\" datetime=\"2026-07-10T17:29:27+03:00\">10 iulie 2026<\/time><\/a><\/span><span class=\"author vcard\"><a href=\"https:\/\/www.impactreal.ro\/author\/claudia-schiopu\/\">Claudia Schiopu<\/a><\/span><span class=\"cat-links\"><a href=\"https:\/\/www.impactreal.ro\/category\/administratie\/\" rel=\"category tag\">Administra\u0163ie<\/a><a href=\"https:\/\/www.impactreal.ro\/category\/babeni\/\" rel=\"category tag\">Babeni<\/a><\/span><\/div>\n<div class=\"news-content editor-content-entry\">\n<p><em>La B\u0103beni, noua gr\u0103dini\u021b\u0103 din zona Petrolului se apropie de finalizare \u0219i ar urma s\u0103 fie func\u021bional\u0103 din luna septembrie. Cl\u0103direa este construit\u0103 de la zero, pe terenul fostei cantine Petrom, cu fonduri atrase prin Ministerul Educa\u021biei, \u0219i va avea patru clase, spa\u021bii moderne, locuri de joac\u0103 \u0219i cabinet medical. Primarul \u0218tefan B\u00eez\u00eec spune c\u0103 aceast\u0103 investi\u021bie este important\u0103 \u0219i pentru reorganizarea gr\u0103dini\u021belor vechi din ora\u0219, ale c\u0103ror cl\u0103diri ar urma s\u0103 fie demolate \u0219i reconstruite.<\/em><\/p>\n<p><strong><u>Gr\u0103dini\u021b\u0103 nou\u0103 pe Strada Petrolului<\/u><\/strong><\/p>\n<p>Ora\u0219ul B\u0103beni va avea, din aceast\u0103 toamn\u0103, o gr\u0103dini\u021b\u0103 nou\u0103 \u00een zona Petrolului. Lucr\u0103rile sunt aproape de final, iar administra\u021bia local\u0103 preg\u0103te\u0219te deschiderea unit\u0103\u021bii \u00een luna septembrie, astfel \u00eenc\u00e2t copiii s\u0103 poat\u0103 fi primi\u021bi \u00eentr-un spa\u021biu nou, sigur \u0219i bine dotat.<\/p>\n<p>Construc\u021bia se afl\u0103 pe Strada Petrolului, pe terenul fostei cantine a companiei Petrom. Proiectul prevede o gr\u0103dini\u021b\u0103 cu patru clase, dot\u0103ri moderne, spa\u021bii de joac\u0103 \u00een exterior \u0219i cabinet medical propriu. Finan\u021barea a fost atras\u0103 prin Ministerul Educa\u021biei, iar investi\u021bia face parte din planul administra\u021biei locale de a muta activitatea pre\u0219colar\u0103 \u00een cl\u0103diri noi, adaptate cerin\u021belor actuale.<\/p>\n<p><strong><u>Dou\u0103 gr\u0103dini\u021be vechi vor fi demolate \u0219i reconstruite din temelii<\/u><\/strong><\/p>\n<p>Noua gr\u0103dini\u021b\u0103 va avea un rol important \u0219i \u00een perioada urm\u0103toare, deoarece cl\u0103dirile vechi ale gr\u0103dini\u021belor din centrul ora\u0219ului \u0219i din zona Rom\u00e2ni sunt incluse \u00een programul \u201e\u0218coli sigure \u0219i s\u0103n\u0103toase\u201d. Acestea vor intra \u00een etapa de semnare a contractelor pentru demolare \u0219i construire de unit\u0103\u021bi noi, ridicate din temelii.<\/p>\n<p>P\u00e2n\u0103 c\u00e2nd cele dou\u0103 cl\u0103diri vor fi reconstruite, copiii vor fi reloca\u021bi la gr\u0103dini\u021ba nou\u0103 de pe Strada Petrolului. Administra\u021bia local\u0103 spune c\u0103 va organiza transportul \u0219i toate condi\u021biile necesare pentru ca mutarea s\u0103 se fac\u0103 f\u0103r\u0103 probleme pentru p\u0103rin\u021bi \u0219i pentru cei mici.<\/p>\n<p><strong><u>Trotuare pentru siguran\u021ba copiilor<\/u><\/strong><\/p>\n<p>Pe l\u00e2ng\u0103 finalizarea gr\u0103dini\u021bei, Prim\u0103ria B\u0103beni va realiza \u0219i lucr\u0103ri pe Strada Petrolului, din bugetul local. Este vorba despre trotuare \u0219i rigole, pe zona de intrare dinspre comuna Fr\u00e2nce\u0219ti spre ora\u0219ul B\u0103beni, acolo unde se construiesc \u0219i blocuri noi.<\/p>\n<p>Trotuarele vor fi amenajate pe partea dreapt\u0103, p\u00e2n\u0103 la calea ferat\u0103. Lucrarea este programat\u0103 pentru acest an \u0219i are ca scop cre\u0219terea siguran\u021bei copiilor care vor merge la noua gr\u0103dini\u021b\u0103, dar \u0219i \u00eembun\u0103t\u0103\u021birea accesului \u00een zona aflat\u0103 \u00een dezvoltare.<\/p>\n<p><strong><u>Cea mai mare finan\u021bare atras\u0103 de Prim\u0103ria B\u0103beni<\/u><\/strong><\/p>\n<p>B\u0103beni a atras \u0219i trei contracte de finan\u021bare prin ADR Sud-Vest Oltenia, cu o valoare total\u0103 de aproape 8 milioane de euro, adic\u0103 aproximativ 39 de milioane de lei. Proiectele vizeaz\u0103 cre\u0219terea eficien\u021bei energetice la Liceul \u201eGeorge \u021a\u0103rnea\u201d, \u0218coala din Valea Mare \u0219i Gr\u0103dini\u021ba din Capu Dealului.<\/p>\n<p>Prin aceste investi\u021bii, cele trei cl\u0103diri vor fi ref\u0103cute din temelii. Vor fi schimbate ferestrele, acoperi\u0219urile, sistemele de \u00eenc\u0103lzire \u0219i alte elemente importante, astfel \u00eenc\u00e2t spa\u021biile educa\u021bionale s\u0103 ajung\u0103 la un nivel mai bun pentru elevi \u0219i cadre didactice.<\/p>\n<p>Primarul ora\u0219ului B\u0103beni, \u0218tefan B\u00eez\u00eec, spune c\u0103 aceste proiecte sunt rezultatul muncii administra\u021biei locale \u0219i reprezint\u0103 cea mai mare finan\u021bare atras\u0103 p\u00e2n\u0103 acum de Prim\u0103ria B\u0103beni.<\/p>\n<p>\u201e<strong><em>Gr\u0103dini\u021ba de pe Strada Petrolului trebuie s\u0103 fie func\u021bional\u0103 din toamn\u0103. Lucr\u0103rile sunt pe final \u0219i vrem ca, din luna septembrie, copiii s\u0103 poat\u0103 intra \u00een aceast\u0103 cl\u0103dire nou\u0103. Avem patru clase, dot\u0103ri moderne, spa\u021bii de joac\u0103 \u0219i cabinet medical. Este o investi\u021bie foarte important\u0103 pentru ora\u0219, mai ales c\u0103 gr\u0103dini\u021bele vechi din centru \u0219i din zona Rom\u00e2ni sunt prinse \u00een programul \u00ab\u0218coli sigure \u0219i s\u0103n\u0103toase\u00bb. Este posibil s\u0103 semn\u0103m contractele pentru demolarea acestor cl\u0103diri \u0219i construirea unor gr\u0103dini\u021be noi, a\u0219a c\u0103 va trebui s\u0103 reloc\u0103m copiii la gr\u0103dini\u021ba de pe Strada Petrolului. Le vom pune la dispozi\u021bie transport \u0219i tot ce este necesar.<\/em><\/strong><\/p>\n<p><strong><em>\u00a0<\/em><\/strong><\/p>\n<p><strong><em>Sunt mul\u021bumit c\u0103, la final, gr\u0103dini\u021bele din B\u0103beni vor func\u021biona \u00een cl\u0103diri noi. Tot pe Strada Petrolului, din bugetul local, vom face trotuare cu rigole, din zona de intrare dinspre Fr\u00e2nce\u0219ti p\u00e2n\u0103 la calea ferat\u0103, pe partea dreapt\u0103. Este nevoie de aceste lucr\u0103ri pentru siguran\u021ba copiilor care vor merge la gr\u0103dini\u021ba nou\u0103.<\/em><\/strong><\/p>\n<p><strong><em>\u00a0<\/em><\/strong><\/p>\n<p><strong><em>Noi \u00eencerc\u0103m s\u0103 ne descurc\u0103m singuri cu ce putem. Finan\u021b\u0103rile mari nu au venit u\u0219or, ci prin munca noastr\u0103. Am semnat cele trei proiecte prin ADR Sud-Vest Oltenia, \u00een valoare de aproape 8 milioane de euro, pentru Liceul \u00abGeorge \u021a\u0103rnea\u00bb, \u0218coala din Valea Mare \u0219i Gr\u0103dini\u021ba din Capu Dealului. Este cea mai mare finan\u021bare atras\u0103 vreodat\u0103 de Prim\u0103ria B\u0103beni. Prin aceste proiecte se va schimba tot ce este important la cele trei cl\u0103diri, de la geamuri \u0219i acoperi\u0219uri p\u00e2n\u0103 la pompe de c\u0103ldur\u0103 \u0219i instala\u021bii.\u201d,<\/em><\/strong> a declarat primarul ora\u0219ului B\u0103beni, \u0218tefan B\u00eez\u00eec.<\/p>\n<p>\u00a0<\/p>\n<p>\u00a0<\/p>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"news-content editor-content-entry\">\n<p><em>La B\u0103beni, noua gr\u0103dini\u021b\u0103 din zona Petrolului se apropie de finalizare \u0219i ar urma s\u0103 fie func\u021bional\u0103 din luna septembrie. Cl\u0103direa este construit\u0103 de la zero, pe terenul fostei cantine Petrom, cu fonduri atrase prin Ministerul Educa\u021biei, \u0219i va avea patru clase, spa\u021bii moderne, locuri de joac\u0103 \u0219i cabinet medical. Primarul \u0218tefan B\u00eez\u00eec spune c\u0103 aceast\u0103 investi\u021bie este important\u0103 \u0219i pentru reorganizarea gr\u0103dini\u021belor vechi din ora\u0219, ale c\u0103ror cl\u0103diri ar urma s\u0103 fie demolate \u0219i reconstruite.<\/em><\/p>\n<p><strong><u>Gr\u0103dini\u021b\u0103 nou\u0103 pe Strada Petrolului<\/u><\/strong><\/p>\n<p>Ora\u0219ul B\u0103beni va avea, din aceast\u0103 toamn\u0103, o gr\u0103dini\u021b\u0103 nou\u0103 \u00een zona Petrolului. Lucr\u0103rile sunt aproape de final, iar administra\u021bia local\u0103 preg\u0103te\u0219te deschiderea unit\u0103\u021bii \u00een luna septembrie, astfel \u00eenc\u00e2t copiii s\u0103 poat\u0103 fi primi\u021bi \u00eentr-un spa\u021biu nou, sigur \u0219i bine dotat.<\/p>\n<p>Construc\u021bia se afl\u0103 pe Strada Petrolului, pe terenul fostei cantine a companiei Petrom. Proiectul prevede o gr\u0103dini\u021b\u0103 cu patru clase, dot\u0103ri moderne, spa\u021bii de joac\u0103 \u00een exterior \u0219i cabinet medical propriu. Finan\u021barea a fost atras\u0103 prin Ministerul Educa\u021biei, iar investi\u021bia face parte din planul administra\u021biei locale de a muta activitatea pre\u0219colar\u0103 \u00een cl\u0103diri noi, adaptate cerin\u021belor actuale.<\/p>\n<p><strong><u>Dou\u0103 gr\u0103dini\u021be vechi vor fi demolate \u0219i reconstruite din temelii<\/u><\/strong><\/p>\n<p>Noua gr\u0103dini\u021b\u0103 va avea un rol important \u0219i \u00een perioada urm\u0103toare, deoarece cl\u0103dirile vechi ale gr\u0103dini\u021belor din centrul ora\u0219ului \u0219i din zona Rom\u00e2ni sunt incluse \u00een programul \u201e\u0218coli sigure \u0219i s\u0103n\u0103toase\u201d. Acestea vor intra \u00een etapa de semnare a contractelor pentru demolare \u0219i construire de unit\u0103\u021bi noi, ridicate din temelii.<\/p>\n<p>P\u00e2n\u0103 c\u00e2nd cele dou\u0103 cl\u0103diri vor fi reconstruite, copiii vor fi reloca\u021bi la gr\u0103dini\u021ba nou\u0103 de pe Strada Petrolului. Administra\u021bia local\u0103 spune c\u0103 va organiza transportul \u0219i toate condi\u021biile necesare pentru ca mutarea s\u0103 se fac\u0103 f\u0103r\u0103 probleme pentru p\u0103rin\u021bi \u0219i pentru cei mici.<\/p>\n<p><strong><u>Trotuare pentru siguran\u021ba copiilor<\/u><\/strong><\/p>\n<p>Pe l\u00e2ng\u0103 finalizarea gr\u0103dini\u021bei, Prim\u0103ria B\u0103beni va realiza \u0219i lucr\u0103ri pe Strada Petrolului, din bugetul local. Este vorba despre trotuare \u0219i rigole, pe zona de intrare dinspre comuna Fr\u00e2nce\u0219ti spre ora\u0219ul B\u0103beni, acolo unde se construiesc \u0219i blocuri noi.<\/p>\n<p>Trotuarele vor fi amenajate pe partea dreapt\u0103, p\u00e2n\u0103 la calea ferat\u0103. Lucrarea este programat\u0103 pentru acest an \u0219i are ca scop cre\u0219terea siguran\u021bei copiilor care vor merge la noua gr\u0103dini\u021b\u0103, dar \u0219i \u00eembun\u0103t\u0103\u021birea accesului \u00een zona aflat\u0103 \u00een dezvoltare.<\/p>\n<p><strong><u>Cea mai mare finan\u021bare atras\u0103 de Prim\u0103ria B\u0103beni<\/u><\/strong><\/p>\n<p>B\u0103beni a atras \u0219i trei contracte de finan\u021bare prin ADR Sud-Vest Oltenia, cu o valoare total\u0103 de aproape 8 milioane de euro, adic\u0103 aproximativ 39 de milioane de lei. Proiectele vizeaz\u0103 cre\u0219terea eficien\u021bei energetice la Liceul \u201eGeorge \u021a\u0103rnea\u201d, \u0218coala din Valea Mare \u0219i Gr\u0103dini\u021ba din Capu Dealului.<\/p>\n<p>Prin aceste investi\u021bii, cele trei cl\u0103diri vor fi ref\u0103cute din temelii. Vor fi schimbate ferestrele, acoperi\u0219urile, sistemele de \u00eenc\u0103lzire \u0219i alte elemente importante, astfel \u00eenc\u00e2t spa\u021biile educa\u021bionale s\u0103 ajung\u0103 la un nivel mai bun pentru elevi \u0219i cadre didactice.<\/p>\n<p>Primarul ora\u0219ului B\u0103beni, \u0218tefan B\u00eez\u00eec, spune c\u0103 aceste proiecte sunt rezultatul muncii administra\u021biei locale \u0219i reprezint\u0103 cea mai mare finan\u021bare atras\u0103 p\u00e2n\u0103 acum de Prim\u0103ria B\u0103beni.<\/p>\n<p>\u201e<strong><em>Gr\u0103dini\u021ba de pe Strada Petrolului trebuie s\u0103 fie func\u021bional\u0103 din toamn\u0103. Lucr\u0103rile sunt pe final \u0219i vrem ca, din luna septembrie, copiii s\u0103 poat\u0103 intra \u00een aceast\u0103 cl\u0103dire nou\u0103. Avem patru clase, dot\u0103ri moderne, spa\u021bii de joac\u0103 \u0219i cabinet medical. Este o investi\u021bie foarte important\u0103 pentru ora\u0219, mai ales c\u0103 gr\u0103dini\u021bele vechi din centru \u0219i din zona Rom\u00e2ni sunt prinse \u00een programul \u00ab\u0218coli sigure \u0219i s\u0103n\u0103toase\u00bb. Este posibil s\u0103 semn\u0103m contractele pentru demolarea acestor cl\u0103diri \u0219i construirea unor gr\u0103dini\u021be noi, a\u0219a c\u0103 va trebui s\u0103 reloc\u0103m copiii la gr\u0103dini\u021ba de pe Strada Petrolului. Le vom pune la dispozi\u021bie transport \u0219i tot ce este necesar.<\/em><\/strong><\/p>\n<p><strong><em>\u00a0<\/em><\/strong><\/p>\n<p><strong><em>Sunt mul\u021bumit c\u0103, la final, gr\u0103dini\u021bele din B\u0103beni vor func\u021biona \u00een cl\u0103diri noi. Tot pe Strada Petrolului, din bugetul local, vom face trotuare cu rigole, din zona de intrare dinspre Fr\u00e2nce\u0219ti p\u00e2n\u0103 la calea ferat\u0103, pe partea dreapt\u0103. Este nevoie de aceste lucr\u0103ri pentru siguran\u021ba copiilor care vor merge la gr\u0103dini\u021ba nou\u0103.<\/em><\/strong><\/p>\n<p><strong><em>\u00a0<\/em><\/strong><\/p>\n<p><strong><em>Noi \u00eencerc\u0103m s\u0103 ne descurc\u0103m singuri cu ce putem. Finan\u021b\u0103rile mari nu au venit u\u0219or, ci prin munca noastr\u0103. Am semnat cele trei proiecte prin ADR Sud-Vest Oltenia, \u00een valoare de aproape 8 milioane de euro, pentru Liceul \u00abGeorge \u021a\u0103rnea\u00bb, \u0218coala din Valea Mare \u0219i Gr\u0103dini\u021ba din Capu Dealului. Este cea mai mare finan\u021bare atras\u0103 vreodat\u0103 de Prim\u0103ria B\u0103beni. Prin aceste proiecte se va schimba tot ce este important la cele trei cl\u0103diri, de la geamuri \u0219i acoperi\u0219uri p\u00e2n\u0103 la pompe de c\u0103ldur\u0103 \u0219i instala\u021bii.\u201d,<\/em><\/strong> a declarat primarul ora\u0219ului B\u0103beni, \u0218tefan B\u00eez\u00eec.<\/p>\n<p>\u00a0<\/p>\n<p>\u00a0<\/p>\n<\/div>\n<div class=\"news-content editor-content-entry\">\n<p><em>La B\u0103beni, noua gr\u0103dini\u021b\u0103 din zona Petrolului se apropie de finalizare \u0219i ar urma s\u0103 fie func\u021bional\u0103 din luna septembrie. Cl\u0103direa este construit\u0103 de la zero, pe terenul fostei cantine Petrom, cu fonduri atrase prin Ministerul Educa\u021biei, \u0219i va avea patru clase, spa\u021bii moderne, locuri de joac\u0103 \u0219i cabinet medical. Primarul \u0218tefan B\u00eez\u00eec spune c\u0103 aceast\u0103 investi\u021bie este important\u0103 \u0219i pentru reorganizarea gr\u0103dini\u021belor vechi din ora\u0219, ale c\u0103ror cl\u0103diri ar urma s\u0103 fie demolate \u0219i reconstruite.<\/em><\/p>\n<p><strong><u>Gr\u0103dini\u021b\u0103 nou\u0103 pe Strada Petrolului<\/u><\/strong><\/p>\n<p>Ora\u0219ul B\u0103beni va avea, din aceast\u0103 toamn\u0103, o gr\u0103dini\u021b\u0103 nou\u0103 \u00een zona Petrolului. Lucr\u0103rile sunt aproape de final, iar administra\u021bia local\u0103 preg\u0103te\u0219te deschiderea unit\u0103\u021bii \u00een luna septembrie, astfel \u00eenc\u00e2t copiii s\u0103 poat\u0103 fi primi\u021bi \u00eentr-un spa\u021biu nou, sigur \u0219i bine dotat.<\/p>\n<p>Construc\u021bia se afl\u0103 pe Strada Petrolului, pe terenul fostei cantine a companiei Petrom. Proiectul prevede o gr\u0103dini\u021b\u0103 cu patru clase, dot\u0103ri moderne, spa\u021bii de joac\u0103 \u00een exterior \u0219i cabinet medical propriu. Finan\u021barea a fost atras\u0103 prin Ministerul Educa\u021biei, iar investi\u021bia face parte din planul administra\u021biei locale de a muta activitatea pre\u0219colar\u0103 \u00een cl\u0103diri noi, adaptate cerin\u021belor actuale.<\/p>\n<p><strong><u>Dou\u0103 gr\u0103dini\u021be vechi vor fi demolate \u0219i reconstruite din temelii<\/u><\/strong><\/p>\n<p>Noua gr\u0103dini\u021b\u0103 va avea un rol important \u0219i \u00een perioada urm\u0103toare, deoarece cl\u0103dirile vechi ale gr\u0103dini\u021belor din centrul ora\u0219ului \u0219i din zona Rom\u00e2ni sunt incluse \u00een programul \u201e\u0218coli sigure \u0219i s\u0103n\u0103toase\u201d. Acestea vor intra \u00een etapa de semnare a contractelor pentru demolare \u0219i construire de unit\u0103\u021bi noi, ridicate din temelii.<\/p>\n<p>P\u00e2n\u0103 c\u00e2nd cele dou\u0103 cl\u0103diri vor fi reconstruite, copiii vor fi reloca\u021bi la gr\u0103dini\u021ba nou\u0103 de pe Strada Petrolului. Administra\u021bia local\u0103 spune c\u0103 va organiza transportul \u0219i toate condi\u021biile necesare pentru ca mutarea s\u0103 se fac\u0103 f\u0103r\u0103 probleme pentru p\u0103rin\u021bi \u0219i pentru cei mici.<\/p>\n<p><strong><u>Trotuare pentru siguran\u021ba copiilor<\/u><\/strong><\/p>\n<p>Pe l\u00e2ng\u0103 finalizarea gr\u0103dini\u021bei, Prim\u0103ria B\u0103beni va realiza \u0219i lucr\u0103ri pe Strada Petrolului, din bugetul local. Este vorba despre trotuare \u0219i rigole, pe zona de intrare dinspre comuna Fr\u00e2nce\u0219ti spre ora\u0219ul B\u0103beni, acolo unde se construiesc \u0219i blocuri noi.<\/p>\n<p>Trotuarele vor fi amenajate pe partea dreapt\u0103, p\u00e2n\u0103 la calea ferat\u0103. Lucrarea este programat\u0103 pentru acest an \u0219i are ca scop cre\u0219terea siguran\u021bei copiilor care vor merge la noua gr\u0103dini\u021b\u0103, dar \u0219i \u00eembun\u0103t\u0103\u021birea accesului \u00een zona aflat\u0103 \u00een dezvoltare.<\/p>\n<p><strong><u>Cea mai mare finan\u021bare atras\u0103 de Prim\u0103ria B\u0103beni<\/u><\/strong><\/p>\n<p>B\u0103beni a atras \u0219i trei contracte de finan\u021bare prin ADR Sud-Vest Oltenia, cu o valoare total\u0103 de aproape 8 milioane de euro, adic\u0103 aproximativ 39 de milioane de lei. Proiectele vizeaz\u0103 cre\u0219terea eficien\u021bei energetice la Liceul \u201eGeorge \u021a\u0103rnea\u201d, \u0218coala din Valea Mare \u0219i Gr\u0103dini\u021ba din Capu Dealului.<\/p>\n<p>Prin aceste investi\u021bii, cele trei cl\u0103diri vor fi ref\u0103cute din temelii. Vor fi schimbate ferestrele, acoperi\u0219urile, sistemele de \u00eenc\u0103lzire \u0219i alte elemente importante, astfel \u00eenc\u00e2t spa\u021biile educa\u021bionale s\u0103 ajung\u0103 la un nivel mai bun pentru elevi \u0219i cadre didactice.<\/p>\n<p>Primarul ora\u0219ului B\u0103beni, \u0218tefan B\u00eez\u00eec, spune c\u0103 aceste proiecte sunt rezultatul muncii administra\u021biei locale \u0219i reprezint\u0103 cea mai mare finan\u021bare atras\u0103 p\u00e2n\u0103 acum de Prim\u0103ria B\u0103beni.<\/p>\n<p>\u201e<strong><em>Gr\u0103dini\u021ba de pe Strada Petrolului trebuie s\u0103 fie func\u021bional\u0103 din toamn\u0103. Lucr\u0103rile sunt pe final \u0219i vrem ca, din luna septembrie, copiii s\u0103 poat\u0103 intra \u00een aceast\u0103 cl\u0103dire nou\u0103. Avem patru clase, dot\u0103ri moderne, spa\u021bii de joac\u0103 \u0219i cabinet medical. Este o investi\u021bie foarte important\u0103 pentru ora\u0219, mai ales c\u0103 gr\u0103dini\u021bele vechi din centru \u0219i din zona Rom\u00e2ni sunt prinse \u00een programul \u00ab\u0218coli sigure \u0219i s\u0103n\u0103toase\u00bb. Este posibil s\u0103 semn\u0103m contractele pentru demolarea acestor cl\u0103diri \u0219i construirea unor gr\u0103dini\u021be noi, a\u0219a c\u0103 va trebui s\u0103 reloc\u0103m copiii la gr\u0103dini\u021ba de pe Strada Petrolului. Le vom pune la dispozi\u021bie transport \u0219i tot ce este necesar.<\/em><\/strong><\/p>\n<p><strong><em>\u00a0<\/em><\/strong><\/p>\n<p><strong><em>Sunt mul\u021bumit c\u0103, la final, gr\u0103dini\u021bele din B\u0103beni vor func\u021biona \u00een cl\u0103diri noi. Tot pe Strada Petrolului, din bugetul local, vom face trotuare cu rigole, din zona de intrare dinspre Fr\u00e2nce\u0219ti p\u00e2n\u0103 la calea ferat\u0103, pe partea dreapt\u0103. Este nevoie de aceste lucr\u0103ri pentru siguran\u021ba copiilor care vor merge la gr\u0103dini\u021ba nou\u0103.<\/em><\/strong><\/p>\n<p><strong><em>\u00a0<\/em><\/strong><\/p>\n<p><strong><em>Noi \u00eencerc\u0103m s\u0103 ne descurc\u0103m singuri cu ce putem. Finan\u021b\u0103rile mari nu au venit u\u0219or, ci prin munca noastr\u0103. Am semnat cele trei proiecte prin ADR Sud-Vest Oltenia, \u00een valoare de aproape 8 milioane de euro, pentru Liceul \u00abGeorge \u021a\u0103rnea\u00bb, \u0218coala din Valea Mare \u0219i Gr\u0103dini\u021ba din Capu Dealului. Este cea mai mare finan\u021bare atras\u0103 vreodat\u0103 de Prim\u0103ria B\u0103beni. Prin aceste proiecte se va schimba tot ce este important la cele trei cl\u0103diri, de la geamuri \u0219i acoperi\u0219uri p\u00e2n\u0103 la pompe de c\u0103ldur\u0103 \u0219i instala\u021bii.\u201d,<\/em><\/strong> a declarat primarul ora\u0219ului B\u0103beni, \u0218tefan B\u00eez\u00eec.<\/p>\n<p>\u00a0<\/p>\n<p>\u00a0<\/p>\n<\/div>\n<p>[analyse_source url=&#8221;https:\/\/www.impactreal.ro\/2026\/07\/10\/gradinita-noua-pe-strada-petrolului-si-fonduri-record-la-babeni-primarul-stefan-bizic-este-cea-mai-mare-finantare-atrasa-vreodata-de-primarie\/&#8221;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/www.impactreal.ro\/wp-content\/uploads\/2026\/07\/BABANI-IULIE-2026-432cce483705.jpg&#8221;] 10 iulie 2026Claudia SchiopuAdministra\u0163ieBabeni La B\u0103beni, noua gr\u0103dini\u021b\u0103 din zona Petrolului se apropie de finalizare \u0219i ar urma s\u0103 fie func\u021bional\u0103 din luna septembrie. Cl\u0103direa este construit\u0103 de la zero, pe terenul fostei cantine Petrom, cu fonduri atrase prin Ministerul Educa\u021biei, \u0219i va avea patru clase, spa\u021bii moderne, locuri de joac\u0103 \u0219i [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[226,212],"class_list":["post-2039139","post","type-post","status-publish","format-standard","hentry","category-romania","tag-crawlmanager","tag-impactreal-ro"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2039139","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2039139"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2039139\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2039139"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2039139"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2039139"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}