{"id":2035112,"date":"2026-07-08T13:38:51","date_gmt":"2026-07-08T10:38:51","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=2035112"},"modified":"2026-07-08T13:38:51","modified_gmt":"2026-07-08T10:38:51","slug":"primaria-municipiului-suceava-implementeaza-prin-programul-regional-2021-2027-13-proiecte-de-investitii-in-valoare-de-7267-de-milioane-de-euro-adr-ne-piatra-neamt-apreciem-perseverenta","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=2035112","title":{"rendered":"Prim\u0103ria Municipiului Suceava implementeaz\u0103, prin Programul Regional 2021-2027, 13 proiecte de investi\u021bii, \u00een valoare de 72,67 de milioane de euro. ADR NE Piatra Neam\u021b: \u201dApreciem perseveren\u021ba \u0219i seriozitatea municipiului Suceava \u00een tot acest parcurs de dezvoltare\u201d"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/img.svnews.ro\/foto\/2026\/07\/08\/546690\/5ca155a2982857a455e91c061.jpg&#8221;]<\/p>\n<div class=\"entry\"><img loading=\"lazy\" decoding=\"async\" width=\"650\" height=\"325\" src=\"https:\/\/img.svnews.ro\/foto\/2026\/07\/08\/546690\/5ca155a2982857a455e91c06106500325.jpg\" alt><\/p>\n<div class=\"entry_content\">\n<p>Prim\u0103ria Municipiului Suceava implementeaz\u0103, prin Programul Regional Nord-Est 2021-2027, 13 proiecte de investi\u021bii, \u00een valoare total\u0103 de 72,67 de milioane de euro, a anun\u021bat ADR Nord Est Piatra Neam\u021b. \u201dRezultatul? Un ora\u0219 care arat\u0103 altfel: \u0219coli reabilitate, trafic fluidizat, parcuri noi \u0219i un reper istoric readus la via\u021b\u0103\u201d, au ar\u0103tat cei de la ADR.<\/p>\n<p>La ce s\u0103 se a\u0219tepte sucevenii?<\/p>\n<p><strong>Educa\u021bie: <\/strong><\/p>\n<p>\u27a1\ufe0f Reabilitarea \u0219i echiparea infrastructurii educa\u021bionale la Colegiul Tehnic \u201eAlexandru Ioan Cuza\u201d \u2013 2,15 milioane euro, termen finalizare 31.12.2026;<\/p>\n<p>\u27a1\ufe0f Reabilitarea infrastructurii educa\u021bionale la Colegiul Tehnic \u201eSamuil Isopescu\u201d \u2013 3,03 milioane euro, termen finalizare 31.12.2026;<\/p>\n<p>\u27a1\ufe0f Extinderea pe vertical\u0103 \u0219i dotarea \u0218colii Gimnaziale \u201eMiron Costin\u201d \u2013 1,82 milioane euro, termen finalizare 24.09.2026;<\/p>\n<p>\u27a1\ufe0f Construirea unei gr\u0103dini\u021be noi \u00een cartierul Obcini \u2013 4,26 milioane euro, termen finalizare 30.04.2028.<\/p>\n<p>\u00a0<\/p>\n<p><strong>Mobilitate urban\u0103<\/strong><\/p>\n<p>\u27a1\ufe0f Sistem de transport public ecologic metropolitan, Etapa II \u2013 14,80 milioane euro, termen finalizare 30.06.2027;<\/p>\n<p>\u27a1\ufe0f Sistem integrat de management \u0219i modelare urban\u0103 pentru fluidizarea traficului \u2013 23,17 milioane euro, termen finalizare 31.10.2027.<\/p>\n<p>\u00a0<\/p>\n<p><strong>Eficien\u021b\u0103 energetic\u0103 \u0219i cl\u0103diri publice<\/strong><\/p>\n<p>\u27a1\ufe0f Cre\u0219terea eficien\u021bei energetice a \u0218colii Gimnaziale nr. 10 \u2013 2,51 milioane euro, termen finalizare 31.10.2026;<\/p>\n<p>\u27a1\ufe0fCre\u0219terea eficien\u021bei energetice a \u0218colii Gimnaziale nr. 5 \u201eJean Bart\u201d \u2013 1,61 milioane euro, termen finalizare 28.02.2027;<\/p>\n<p>\u27a1\ufe0f Cre\u0219terea eficien\u021bei energetice a \u0218colii Gimnaziale nr. 6 \u2013 2,16 milioane euro, termen finalizare 31.10.2026;<\/p>\n<p>\u27a1\ufe0f Reabilitarea energetic\u0103 a Colegiului Economic \u201eDimitrie Cantemir\u201d \u2013 3,87 milioane euro, termen finalizare 31.05.2027.<\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<p><strong>Spa\u021bii verzi<\/strong><\/p>\n<p>\u27a1\ufe0f Zona de agrement Parc \u0218ipote \u2013 4,33 milioane euro, termen finalizare 29.02.2028;<\/p>\n<p>\u27a1\ufe0f Reabilitarea parcurilor publice din Suceava \u2013 2,92 milioane euro, termen finalizare 30.11.2027.<\/p>\n<p>\u00a0<\/p>\n<p><strong>Regenerare urban<\/strong><strong>\u0103 \u0219i turism susstenabil<\/strong><\/p>\n<p>\u27a1\ufe0f Reabilitarea Cur\u021bii Domne\u0219ti din Suceava \u2013 6,03 milioane euro, termen finalizare 29.02.2028.<\/p>\n<p>Cel mai amplu proiect din acest pachet finan\u021bat Regio este Sistemul integrat de management urban al traficului, \u00een valoare de 23,17 milioane euro, o investi\u021bie ambi\u021bioas\u0103 care schimb\u0103 fundamental modul \u00een care circul\u0103 sucevenii \u00een ora\u0219.<\/p>\n<p>\u201dP\u00e2n\u0103 la finalul anului 2026, Prim\u0103ria Municipiului Suceava va solicita finan\u021bare nerambursabil\u0103 din Programul Regional Nord-Est \u00een valoare total\u0103 de 9,72 milioane de euro. Apreciem perseveren\u021ba \u0219i seriozitatea Municipiului Suceava \u00een tot acest parcurs de dezvoltare \u0219i \u00eei asigur\u0103m tot sprijinul de care este nevoie pentru a avea rezultatele a\u0219teptate. De la s\u0103lile de clas\u0103 la autobuze electrice, de la parcuri la monumente istorice, fiecare proiect este g\u00e2ndit pentru a avea un impact direct pozitiv asupra vie\u021bii de zi cu zi a sucevenilor\u201d, au mai transmis cei de la ADR NE Piatra Neam\u021b.<\/p>\n<\/div>\n<div>\n<div>VN:F [1.9.22_1171]<\/div>\n<div class=\"ratingblock \">\n<div class=\"ratingstars \">\n<div id=\"article_loader_546690\" class=\"ratingloaderarticle\">\n<div class=\"loader arrows \">\n<div class=\"loaderinner\">se actualizeaz\u0103&#8230;<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"ratingtext \">\n<div id=\"gdr_text_a546690\">Rating: 0.0\/<strong>10<\/strong> (0 votes cast)<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"entry_content\">\n<p>Prim\u0103ria Municipiului Suceava implementeaz\u0103, prin Programul Regional Nord-Est 2021-2027, 13 proiecte de investi\u021bii, \u00een valoare total\u0103 de 72,67 de milioane de euro, a anun\u021bat ADR Nord Est Piatra Neam\u021b. \u201dRezultatul? Un ora\u0219 care arat\u0103 altfel: \u0219coli reabilitate, trafic fluidizat, parcuri noi \u0219i un reper istoric readus la via\u021b\u0103\u201d, au ar\u0103tat cei de la ADR.<\/p>\n<p>La ce s\u0103 se a\u0219tepte sucevenii?<\/p>\n<p><strong>Educa\u021bie: <\/strong><\/p>\n<p>\u27a1\ufe0f Reabilitarea \u0219i echiparea infrastructurii educa\u021bionale la Colegiul Tehnic \u201eAlexandru Ioan Cuza\u201d \u2013 2,15 milioane euro, termen finalizare 31.12.2026;<\/p>\n<p>\u27a1\ufe0f Reabilitarea infrastructurii educa\u021bionale la Colegiul Tehnic \u201eSamuil Isopescu\u201d \u2013 3,03 milioane euro, termen finalizare 31.12.2026;<\/p>\n<p>\u27a1\ufe0f Extinderea pe vertical\u0103 \u0219i dotarea \u0218colii Gimnaziale \u201eMiron Costin\u201d \u2013 1,82 milioane euro, termen finalizare 24.09.2026;<\/p>\n<p>\u27a1\ufe0f Construirea unei gr\u0103dini\u021be noi \u00een cartierul Obcini \u2013 4,26 milioane euro, termen finalizare 30.04.2028.<\/p>\n<p>\u00a0<\/p>\n<p><strong>Mobilitate urban\u0103<\/strong><\/p>\n<p>\u27a1\ufe0f Sistem de transport public ecologic metropolitan, Etapa II \u2013 14,80 milioane euro, termen finalizare 30.06.2027;<\/p>\n<p>\u27a1\ufe0f Sistem integrat de management \u0219i modelare urban\u0103 pentru fluidizarea traficului \u2013 23,17 milioane euro, termen finalizare 31.10.2027.<\/p>\n<p>\u00a0<\/p>\n<p><strong>Eficien\u021b\u0103 energetic\u0103 \u0219i cl\u0103diri publice<\/strong><\/p>\n<p>\u27a1\ufe0f Cre\u0219terea eficien\u021bei energetice a \u0218colii Gimnaziale nr. 10 \u2013 2,51 milioane euro, termen finalizare 31.10.2026;<\/p>\n<p>\u27a1\ufe0fCre\u0219terea eficien\u021bei energetice a \u0218colii Gimnaziale nr. 5 \u201eJean Bart\u201d \u2013 1,61 milioane euro, termen finalizare 28.02.2027;<\/p>\n<p>\u27a1\ufe0f Cre\u0219terea eficien\u021bei energetice a \u0218colii Gimnaziale nr. 6 \u2013 2,16 milioane euro, termen finalizare 31.10.2026;<\/p>\n<p>\u27a1\ufe0f Reabilitarea energetic\u0103 a Colegiului Economic \u201eDimitrie Cantemir\u201d \u2013 3,87 milioane euro, termen finalizare 31.05.2027.<\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<p><strong>Spa\u021bii verzi<\/strong><\/p>\n<p>\u27a1\ufe0f Zona de agrement Parc \u0218ipote \u2013 4,33 milioane euro, termen finalizare 29.02.2028;<\/p>\n<p>\u27a1\ufe0f Reabilitarea parcurilor publice din Suceava \u2013 2,92 milioane euro, termen finalizare 30.11.2027.<\/p>\n<p>\u00a0<\/p>\n<p><strong>Regenerare urban<\/strong><strong>\u0103 \u0219i turism susstenabil<\/strong><\/p>\n<p>\u27a1\ufe0f Reabilitarea Cur\u021bii Domne\u0219ti din Suceava \u2013 6,03 milioane euro, termen finalizare 29.02.2028.<\/p>\n<p>Cel mai amplu proiect din acest pachet finan\u021bat Regio este Sistemul integrat de management urban al traficului, \u00een valoare de 23,17 milioane euro, o investi\u021bie ambi\u021bioas\u0103 care schimb\u0103 fundamental modul \u00een care circul\u0103 sucevenii \u00een ora\u0219.<\/p>\n<p>\u201dP\u00e2n\u0103 la finalul anului 2026, Prim\u0103ria Municipiului Suceava va solicita finan\u021bare nerambursabil\u0103 din Programul Regional Nord-Est \u00een valoare total\u0103 de 9,72 milioane de euro. Apreciem perseveren\u021ba \u0219i seriozitatea Municipiului Suceava \u00een tot acest parcurs de dezvoltare \u0219i \u00eei asigur\u0103m tot sprijinul de care este nevoie pentru a avea rezultatele a\u0219teptate. De la s\u0103lile de clas\u0103 la autobuze electrice, de la parcuri la monumente istorice, fiecare proiect este g\u00e2ndit pentru a avea un impact direct pozitiv asupra vie\u021bii de zi cu zi a sucevenilor\u201d, au mai transmis cei de la ADR NE Piatra Neam\u021b.<\/p>\n<\/div>\n<p>[analyse_source url=&#8221;https:\/\/www.svnews.ro\/primaria-municipiului-suceava-implementeaza-prin-programul-regional-2021-2027-13-proiecte-de-investitii-in-valoare-de-7267-de-milioane-de-euro-adr-ne-piatra-neamt-apreciem-perseverenta\/546690\/&#8221;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/img.svnews.ro\/foto\/2026\/07\/08\/546690\/5ca155a2982857a455e91c061.jpg&#8221;] Prim\u0103ria Municipiului Suceava implementeaz\u0103, prin Programul Regional Nord-Est 2021-2027, 13 proiecte de investi\u021bii, \u00een valoare total\u0103 de 72,67 de milioane de euro, a anun\u021bat ADR Nord Est Piatra Neam\u021b. \u201dRezultatul? Un ora\u0219 care arat\u0103 altfel: \u0219coli reabilitate, trafic fluidizat, parcuri noi \u0219i un reper istoric readus la via\u021b\u0103\u201d, au ar\u0103tat cei de [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[226,175],"class_list":["post-2035112","post","type-post","status-publish","format-standard","hentry","category-romania","tag-crawlmanager","tag-svnews-ro"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2035112","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2035112"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2035112\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2035112"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2035112"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2035112"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}