{"id":2035087,"date":"2026-07-08T15:44:03","date_gmt":"2026-07-08T12:44:03","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=2035087"},"modified":"2026-07-08T15:44:03","modified_gmt":"2026-07-08T12:44:03","slug":"imagini-video-de-pe-santierul-variantei-de-ocolire-timisoara-vest-trebuie-finalizata-in-prima-parte-a","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=2035087","title":{"rendered":"Imagini video de pe \u0219antierul Variantei de Ocolire Timi\u0219oara Vest. Trebuie finalizat\u0103 \u00een prima parte a"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/renasterea.ro\/ro\/wp-content\/uploads\/2026\/07\/santier-timisoara-vest.jpghttps:\/\/renasterea.ro\/ro\/wp-content\/uploads\/2026\/07\/santier-timisoara-vest.jpg&#8221;]<\/p>\n<div class=\"entry-content\"><img loading=\"lazy\" decoding=\"async\" width=\"797\" height=\"443\" src=\"https:\/\/renasterea.ro\/ro\/wp-content\/uploads\/2026\/07\/santier-timisoara-vest.jpg\" class=\"attachment-medium size-medium wp-post-image\" alt=\"Imagini video de pe \u0219antierul Variantei de Ocolire Timi\u0219oara Vest. Trebuie finalizat\u0103 \u00een prima parte a anului 2028\" title=\"Imagini video de pe \u0219antierul Variantei de Ocolire Timi\u0219oara Vest. Trebuie finalizat\u0103 \u00een prima parte a anului 2028 1\"><\/p>\n<h4>Directorul general al Companiei Na\u0163ionale de Administrare a Infrastructurii Rutiere (CNAIR) SA, dl Cristian Pistol, a prezentat noi imagini video de pe \u0219antierul Variantei de Ocolire Timi\u0219oara Vest.<\/h4>\n<p>Se lucreaz\u0103 acum la terasamente, structuri, reloc\u0103ri de utilit\u0103\u021bi \u0219i desc\u0103rc\u0103ri arheologice.<\/p>\n<p>De\u0219i Ordinul de \u00cencepere a fost emis \u00een luna mai 2026, stadiul fizic al lucr\u0103rilor a ajuns deja la 6%.<\/p>\n<p>VO Timi\u0219oara Vest va avea o lungime de aproximativ 14 km, dou\u0103 benzi pe fiecare sens, 10 poduri \u0219i pasaje \u0219i 4 noduri rutiere denivelate.<\/p>\n<p>Pentru structurile de pe traseu (poduri \u0219i pasaje) se execut\u0103 forarea pilo\u021bilor, montarea arm\u0103turii \u0219i turnarea betonului, iar la terasamente se face decopertarea stratului vegetal, scarificarea \u0219i stabilizarea terenului de fundare.<\/p>\n<p>De asemenea, se lucreaz\u0103 la viitorul nod rutier cu Radiala Nou\u0103 de Vest, care va asigura rela\u021bia cu municipiul Timi\u0219oara.<\/p>\n<p>Pe \u0219antier sunt mobilizate peste 300 de persoane \u0219i aproximativ 100 de utilaje.<\/p>\n<p>Proiectul, \u00een valoare de 1,41 miliarde lei (f\u0103r\u0103 TVA), finan\u021bat prin Programul Transport (#PT) 2021-2027, este derulat de constructorul turc Nurol\u201d, a spune Cristian Pistol.<\/p>\n<p>Aceast\u0103 nou\u0103 Variant\u0103 Ocolitoare, care va completa practic centura Municipiului Timi\u0219oara, trebuie finalizat\u0103 \u00een prima parte a anului 2028.<\/p>\n<iframe loading=\"lazy\" title=\"\u0218antier VO Timi\u0219oara Vest, iulie 2026\" width=\"640\" height=\"360\" src=\"https:\/\/www.youtube.com\/embed\/H4XMJ-Pl1qA?feature=oembed\" frameborder allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe>\n<\/div>\n<p>[analyse_source url=&#8221;https:\/\/renasterea.ro\/imagini-video-de-pe-santierul-variantei-de-ocolire-timisoara-vest-trebuie-finalizata-in-prima-parte-a-anului-2028\/&#8221;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/renasterea.ro\/ro\/wp-content\/uploads\/2026\/07\/santier-timisoara-vest.jpghttps:\/\/renasterea.ro\/ro\/wp-content\/uploads\/2026\/07\/santier-timisoara-vest.jpg&#8221;] Directorul general al Companiei Na\u0163ionale de Administrare a Infrastructurii Rutiere (CNAIR) SA, dl Cristian Pistol, a prezentat noi imagini video de pe \u0219antierul Variantei de Ocolire Timi\u0219oara Vest. Se lucreaz\u0103 acum la terasamente, structuri, reloc\u0103ri de utilit\u0103\u021bi \u0219i desc\u0103rc\u0103ri arheologice. De\u0219i Ordinul de \u00cencepere a fost emis \u00een luna mai 2026, stadiul [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[226,188],"class_list":["post-2035087","post","type-post","status-publish","format-standard","hentry","category-romania","tag-crawlmanager","tag-renasterea-ro"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2035087","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2035087"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2035087\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2035087"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2035087"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2035087"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}