{"id":2033791,"date":"2026-07-08T07:27:36","date_gmt":"2026-07-08T04:27:36","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=2033791"},"modified":"2026-07-08T07:27:36","modified_gmt":"2026-07-08T04:27:36","slug":"zeci-de-mii-de-apartamente-din-capitala-raman-fara-apa-calda-de-pe-13-iulie-pana-pe-2-august","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=2033791","title":{"rendered":"Zeci de mii de apartamente din Capital\u0103 r\u0103m\u00e2n f\u0103r\u0103 ap\u0103 cald\u0103 de pe 13 iulie p\u00e2n\u0103 pe 2 august\u00a0"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/60m.ro\/wp-content\/uploads\/2026\/07\/ciprian-ciucu-termoficare.webp&#8221;]<\/p>\n<div class=\"articleBody\" data-key=\"articleBody\">\nCompania Municipal\u0103 Termoenergetica Bucure\u0219ti (CMTEB) S.A. anun\u021b\u0103 c\u0103 \u00een urm\u0103toarea perioad\u0103 se vor efectua lucr\u0103ri de \u00eenlocuire, modernizare \u0219i de repara\u021bii pe conductele re\u021belei termice, derulate cu finan\u021bare din fonduri europene \u0219i guvernamentale \u00een mai multe zone din Capital\u0103.<\/p>\n<p>\u201eAceste investi\u021bii sunt esen\u021biale pentru cre\u0219terea siguran\u021bei \u0219i eficien\u021bei sistemului de alimentare cu energie termic\u0103. Lucr\u0103rile au durate diferite de realizare, \u00een func\u021bie de complexitate\u201d, precizeaz\u0103 reprezentan\u021bii Companiei Municipale Termoenergetica Bucure\u0219ti.<\/p>\n<p>Se vor efectua urm\u0103toarele lucr\u0103ri:<\/p>\n<p>1. Pe re\u021beaua termic\u0103 primar\u0103, la conducta cu diametrul de 500 mm, pe \u0218oseaua Panduri, se vor executa lucr\u0103ri de modernizare ce vor afecta Sectorul 5 \u00een integralitate. Lucr\u0103rile sunt prev\u0103zute \u00een cadrul Lotului 5, Obiectivul 14, parte a obiectivului de investi\u021bii \u201eReabilitarea sistemului de termoficare al Municipiului Bucure\u0219ti\u201d \u0219i impun sistarea furniz\u0103rii apei calde menajere c\u0103tre 55 de puncte termice (845 de blocuri, 42.238 de apartamente), \u00een perioada cuprins\u0103 \u00eentre 13.07.2026 \u0219i 18.07.2026.<\/p>\n<p>2. Pe re\u021beaua termic\u0103 primar\u0103, la conducta cu diametrul de 600 mm, \u00een zona cuprins\u0103 \u00eentre Bulevardul Iancu de Hunedoara, Calea Floreasca, Calea Doroban\u021bi \u0219i Strada Nicolae Caramfil din Sectorul 1, se vor executa lucr\u0103ri de modernizare de c\u0103tre firma Energetica. Lucr\u0103rile sunt prev\u0103zute \u00een cadrul Obiectivului 4 \u2013 Magistrala II\u2013III Groz\u0103ve\u0219ti (tronson CS20 \u2013 CS11 \u2013 Avia\u021biei) \u0219i impun sistarea furniz\u0103rii apei calde menajere c\u0103tre 18 puncte termice (230 de blocuri, 8.842 de apartamente), \u00een perioada cuprins\u0103 \u00eentre 13.07.2026 \u0219i 31.07.2026.<\/p>\n<p>3. Pe re\u021beaua termic\u0103 primar\u0103, la conducta cu diametrul de 1100 mm, \u00een zona cuprins\u0103 \u00eentre Strada Luic\u0103, Bulevardul Turnu M\u0103gurele, Bulevardul Constantin Br\u00e2ncoveanu, \u0218oseaua Berceni, \u0218oseaua Olteni\u021bei, Calea \u0218erban Vod\u0103, \u0218oseaua Giurgiului, Strada Ni\u021bu Vasile, Strada Emil Racovi\u021b\u0103 \u0219i Bulevardul Alexandru Obregia, se vor executa lucr\u0103ri \u00een cadrul proiectului POIM, parte a obiectivului de investi\u021bii \u201eReabilitarea sistemului de termoficare al Municipiului Bucure\u0219ti\u201d. Lucr\u0103rile sunt prev\u0103zute \u00een cadrul Lotului 4, Obiectivul 17, Obiectivul 18, Obiectivul 19 \u0219i Obiectivul 20 impun sistarea furniz\u0103rii apei calde menajere c\u0103tre 72 de puncte termice \u0219i 2 module termice (1.100 de blocuri), \u00een perioada cuprins\u0103 \u00eentre 20.07.2026 \u0219i 02.08.2026.<\/p>\n<p>4. Pe re\u021beaua termic\u0103 primar\u0103, la conducta cu diametrul de 1000 mm, \u00een zona cuprins\u0103 \u00eentre Bulevardul Mihai Bravu, Calea Vitan, Bulevardul Corneliu Coposu, Bulevardul Octavian Goga \u0219i Bulevardul Mircea Vod\u0103 din Sectorul 3, se vor executa lucr\u0103ri de modernizare de c\u0103tre firma ELSACO. Lucr\u0103rile sunt prev\u0103zute \u00een cadrul Lotului 1, Obiectivul 1 (tronson CS 5 \u2013 CI 2 \u2013 1 MB \u2013 5 MB) \u0219i Obiectivul 2 (tronson CMB \u2013 CV16), parte a obiectivului de investi\u021bii \u201eReabilitarea sistemului de termoficare al Municipiului Bucure\u0219ti\u201d \u0219i impun sistarea furniz\u0103rii apei calde menajere c\u0103tre 92 de puncte termice (1.016 de blocuri), \u00een perioada cuprins\u0103 \u00eentre 20.07.2026 \u0219i 02.08.2026.<\/p>\n<p>5. Pe re\u021beaua termic\u0103 primar\u0103, la conducta cu diametrul de 900 mm, \u00een zona cuprins\u0103 \u00eentre Bulevardul Mihai Bravu, Calea Vitan, Bulevardul Corneliu Coposu, Bulevardul Octavian Goga \u0219i Bulevardul Mircea Vod\u0103 din Sectorul 3, se vor executa lucr\u0103ri de modernizare de c\u0103tre firma SICOR. Lucr\u0103rile sunt prev\u0103zute \u00een cadrul Lotului 1, Obiectivul 4 (tronson 5 MB \u2013 11 MB \u2013 12 MB), parte a obiectivului de investi\u021bii \u201eReabilitarea sistemului de termoficare al Municipiului Bucure\u0219ti\u201d \u0219i impun sistarea furniz\u0103rii apei calde menajere c\u0103tre 92 de puncte termice (972 de blocuri), \u00een perioada cuprins\u0103 \u00eentre 20.07.2026 \u0219i 02.08.2026.<\/p>\n<p>Dup\u0103 finalizarea lucr\u0103rilor, \u00eenc\u0103rcarea cu ap\u0103 a tronsoanelor mai sus men\u021bionate se va desf\u0103\u0219ura etapizat, pe m\u0103sur\u0103 ce lucr\u0103rile se finalizeaz\u0103, pentru a asigura un proces controlat \u0219i sigur.<\/p>\n<p>Dispeceratele Companiei Municipale Termoenergetica Bucure\u0219ti \u0219i echipele de interven\u021bie lucreaz\u0103 \u00een regim permanent. Clien\u021bii au la dispozi\u021bie informa\u021bii prin mesajele pre\u00eenregistrate la num\u0103rul de telefon 031.9442 sau alte detalii la 0800.820.002, precum \u0219i prin aplica\u021bia Termoalert.<\/p>\n<p>\u201eCompania Municipal\u0103 Termoenergetica Bucure\u0219ti mul\u021bume\u0219te consumatorilor pentru \u00een\u021belegere \u0219i \u00ee\u0219i cere scuze pentru disconfortul temporar generat de aceste lucr\u0103ri necesare pentru modernizarea sistemului de termoficare al Capitalei\u201d, transmit reprezentan\u021bii Companiei Municipale Termoenergetica Bucure\u0219ti.\n<\/p><\/div>\n<p>[analyse_source url=&#8221;https:\/\/60m.ro\/zeci-de-mii-de-apartamente-din-capitala-raman-fara-apa-calda-de-pe-13-iulie-pana-pe-2-august\/&#8221;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/60m.ro\/wp-content\/uploads\/2026\/07\/ciprian-ciucu-termoficare.webp&#8221;] Compania Municipal\u0103 Termoenergetica Bucure\u0219ti (CMTEB) S.A. anun\u021b\u0103 c\u0103 \u00een urm\u0103toarea perioad\u0103 se vor efectua lucr\u0103ri de \u00eenlocuire, modernizare \u0219i de repara\u021bii pe conductele re\u021belei termice, derulate cu finan\u021bare din fonduri europene \u0219i guvernamentale \u00een mai multe zone din Capital\u0103. \u201eAceste investi\u021bii sunt esen\u021biale pentru cre\u0219terea siguran\u021bei \u0219i eficien\u021bei sistemului de alimentare cu [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[100,226],"class_list":["post-2033791","post","type-post","status-publish","format-standard","hentry","category-romania","tag-60m-ro","tag-crawlmanager"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2033791","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2033791"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2033791\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2033791"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2033791"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2033791"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}