{"id":2019977,"date":"2026-06-28T21:07:33","date_gmt":"2026-06-28T18:07:33","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=2019977"},"modified":"2026-06-28T21:07:33","modified_gmt":"2026-06-28T18:07:33","slug":"primaria-rm-sarat-pregateste-parteneriate-locale-intr-un-proiect-cu-finantare-europeana","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=2019977","title":{"rendered":"Prim\u0103ria Rm. S\u0103rat preg\u0103te\u0219te parteneriate locale \u00eentr-un proiect cu finan\u021bare european\u0103"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/opiniabuzau.ro\/wp-content\/uploads\/2026\/06\/persoane-cu-handicap-scaled.webp&#8221;]<\/p>\n<div class=\"entry-content entry clearfix\">\n<blockquote>\n<p><strong>Consiliul Local Municipal Rm. S\u0103rat a fost \u00eentrunit \u00een \u0219edin\u021b\u0103 extraordinar\u0103 \u00een data de 22 iunie, ocazie cu care primarul Sorin C\u00eerjan a prezentat plenului un program european care are intervalul de derulare \u00eentre 2021 \u0219i 2027 \u0219i pentru care a promovat patru proiecte de hot\u0103r\u00e2re, trei dintre ele legate de finan\u021b\u0103ri stricte direc\u021bionate pe zone din aria socialului, dar \u0219i abordarea fenomenelor de incluziune social\u0103 \u0219i reabilitarea \u0219i modernizarea infrastructurii educa\u021bionale, toate proiectele fiind direc\u021bionate pe grupuri \u021bint\u0103 bine definite.<\/strong><\/p>\n<\/blockquote>\n<p>A fost vorba despre aprobarea documenta\u021biilor ini\u021biale, pentru trei studii de fezabilitate, \u00een baza c\u0103rora s\u0103 poat\u0103 fi accesat programul european, prin completarea cererilor de finan\u021bare.<\/p>\n<p>Primul studiu de fezabilitate se refer\u0103 la construirea unui centru de zi pentru persoane v\u00e2rstnice defavorizate, cu handicap, al doilea va urm\u0103ri ob\u021binerea unei finan\u021b\u0103ri pentru \u00eembun\u0103t\u0103\u021birea infrastructurii locative, prin construirea de locuin\u021be sociale pentru persoane care tr\u0103iesc \u00een locuin\u021be individuale sau ad\u0103posturi improvizate, inclusiv a celor cu dizabilit\u0103\u021bi \u0219i apar\u021bin\u00e2nd etniei rome. Cea de-a treia documenta\u021bie va fi \u00eentocmit\u0103 pentru atragerea de fonduri europene care s\u0103 sus\u021bin\u0103 investi\u021bii \u00een modernizarea infrastructurii educa\u021bionale, prin reabilitare \u0219i extindere a unei cl\u0103diri existente \u0219i amenajarea de spa\u021bii educa\u021bionale \u00een aer liber, precum \u0219i infrastructur\u0103 sportiv\u0103 conex\u0103 infrastructurii \u0219colare existente. De asemenea, primarul Sorin C\u00eerjan a promovat un proiect de hot\u0103r\u00e2re prin care consilierii municipali au aprobat un plan financiar prealabil, \u00een care au fost estimate at\u00e2t cheltuielile eligibile, c\u00e2t \u0219i cele neeligibile, acestea din urm\u0103 trebuind s\u0103 fie asumate de administra\u021bia local\u0103, inclusiv cota de 2%, cu titlu de cofinan\u021bare, din valoarea total\u0103 a finan\u021b\u0103rii.<\/p>\n<p>Toate investi\u021biile se vor derula \u00een cadrul proiectului \u201eNicio \u0219ans\u0103 pierdut\u0103 \u2013 Educa\u021bie \u0219i incluziune prin abordare multifond R\u00e2mnicu S\u0103rat\u201d, care va fi depus pentru finan\u021bare prin Programul Incluziune \u0219i Demnitate Social\u0103 2021\u20132027, derulat prin Fondul Social European (FSE+). \u00cen cadrul proiectului \u201eNicio \u0219ans\u0103 pierdut\u0103\u201d, municipiul R\u00e2mnicu S\u0103rat este lider de proiect, iar Direc\u021bia de Asisten\u021b\u0103 Social\u0103 R\u00e2mnicu S\u0103rat \u0219i Liceul Tehnologic Economic \u201eElina Matei Basarab\u201d sunt parteneri.<\/p>\n<p>Fondul Social European dispune de un buget de 142,7 miliarde de euro \u0219i dezvolt\u0103 proiecte \u00een domeniul social, al ocup\u0103rii for\u021bei de munc\u0103, al educa\u021biei \u0219i al competen\u021belor, inclusiv \u00een ce prive\u0219te reformele structurale. FSE reune\u0219te patru instrumente financiare, care erau separate \u00een perioada de programare 2014-2020.<\/p>\n<div class=\"stream-item stream-item-in-post stream-item-inline-post aligncenter\"><a href=\"https:\/\/vreaulanova.ro\/?utm_source=opiniabuzau&amp;utm_medium=image\" title target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" data-od-unknown-tag data-od-xpath=\"\/HTML\/BODY\/DIV[@class=&apos;background-overlay&apos;]\/*[1][self::DIV]\/*[1][self::DIV]\/*[4][self::DIV]\/*[1][self::DIV]\/*[1][self::DIV]\/*[2][self::ARTICLE]\/*[3][self::DIV]\/*[7][self::DIV]\/*[1][self::A]\/*[1][self::IMG]\" src=\"https:\/\/opiniabuzau.ro\/wp-content\/smush-webp\/2022\/02\/MicrosoftTeams-image-4-1.jpg.webp\" alt width=\"728\" height=\"91\" class=\"perfmatters-lazy\"><img loading=\"lazy\" decoding=\"async\" data-od-unknown-tag data-od-xpath=\"\/HTML\/BODY\/DIV[@class=&apos;background-overlay&apos;]\/*[1][self::DIV]\/*[1][self::DIV]\/*[4][self::DIV]\/*[1][self::DIV]\/*[1][self::DIV]\/*[2][self::ARTICLE]\/*[3][self::DIV]\/*[7][self::DIV]\/*[1][self::A]\/*[1][self::IMG]\" src=\"https:\/\/opiniabuzau.ro\/wp-content\/smush-webp\/2022\/02\/MicrosoftTeams-image-4-1.jpg.webp\" alt width=\"728\" height=\"91\"><\/a><\/div>\n<\/div>\n<p>[analyse_source url=&#8221;https:\/\/opiniabuzau.ro\/primaria-rm-sarat-pregateste-parteneriate-locale-intr-un-proiect-cu-finantare-europeana\/&#8221;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/opiniabuzau.ro\/wp-content\/uploads\/2026\/06\/persoane-cu-handicap-scaled.webp&#8221;] Consiliul Local Municipal Rm. S\u0103rat a fost \u00eentrunit \u00een \u0219edin\u021b\u0103 extraordinar\u0103 \u00een data de 22 iunie, ocazie cu care primarul Sorin C\u00eerjan a prezentat plenului un program european care are intervalul de derulare \u00eentre 2021 \u0219i 2027 \u0219i pentru care a promovat patru proiecte de hot\u0103r\u00e2re, trei dintre ele legate de finan\u021b\u0103ri [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[226,44],"class_list":["post-2019977","post","type-post","status-publish","format-standard","hentry","category-politics","tag-crawlmanager","tag-opiniabuzau-ro"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2019977","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2019977"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2019977\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2019977"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2019977"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2019977"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}