{"id":2016889,"date":"2026-06-29T09:57:31","date_gmt":"2026-06-29T06:57:31","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=2016889"},"modified":"2026-06-29T09:57:31","modified_gmt":"2026-06-29T06:57:31","slug":"reflector-la-gold-fm-pitesti-spitalul-de-10-milioane-de-euro-care-nu-salveaza-nicio-viata","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=2016889","title":{"rendered":"REFLECTOR LA GOLD FM: PITE\u0218TI. SPITALUL DE 10 MILIOANE DE EURO CARE NU SALVEAZ\u0102 NICIO VIA\u021a\u0102"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/solidnews.ro\/wp-content\/uploads\/2026\/06\/reflector-la-gold-fm-pitesti.jpeg&#8221;]<\/p>\n<div class=\"td_block_wrap tdb_single_content tdi_120 td-pb-border-top td_block_template_1 td-post-content tagdiv-type\" data-td-block-uid=\"tdi_120\">\n<div class=\"tdb-block-inner td-fix-index\">\n<p><strong>(transcriere a rubricii \u201eReflector\u201d a Iulianei Pitaru Vlacicu, din cadrul emisiunii \u201eCe-i \u00een Gu\u0219\u0103, \u0219i-n c\u0103pu\u0219\u0103\u201d la Gold FM)<\/strong><\/p>\n<p>\u00cen iunie 2019, Spitalul Jude\u021bean de Urgen\u021b\u0103 Pite\u0219ti, aflat \u00een subordinea Consiliului Jude\u021bean Arge\u0219, lansa o licita\u021bie public\u0103 pentru construirea unui nou corp de cl\u0103dire. Valoarea estimat\u0103: peste 38 de milioane de lei, f\u0103r\u0103 TVA. Contractul a fost atribuit asocierii format\u0103 din firmele Star Trading Impex, Valah Construct Grup \u0219i Zeus SA. Lucr\u0103rile au \u00eenceput \u00een martie 2020, cu c\u00e2teva zile \u00eenainte ca Rom\u00e2nia s\u0103 intre \u00een stare de urgen\u021b\u0103 din cauza pandemiei COVID-19.<br \/>\nProiectul era ambi\u021bios: o cl\u0103dire cu regim de \u00een\u0103l\u021bime P+4, care urma s\u0103 g\u0103zduiasc\u0103 sec\u021bii vitale: Chirurgie plastic\u0103 \u0219i Ar\u0219i, Chirurgie vascular\u0103, un bloc operator cu s\u0103li de chirurgie cardiovascular\u0103 \u0219i electrofiziologie, Cardiologie, \u0219i la subsol morga \u0219i ad\u0103posturi pentru situa\u021bii de urgen\u021b\u0103. O investi\u021bie realizat\u0103 exclusiv din bugetul jude\u021bului, din banii arge\u0219enilor, pentru arge\u0219eni. Pandemia a perturbat calendarul, pre\u021burile materialelor de construc\u021bii au explodat, devizele au fost ajustate conform legii, dar p\u00e2n\u0103 \u00een 2023 proiectul p\u0103rea s\u0103 se deruleze f\u0103r\u0103 probleme majore. Cl\u0103direa era ridicat\u0103, aparatura medical\u0103 de ultim\u0103 genera\u021bie era comandat\u0103 \u0219i par\u021bial instalat\u0103.<br \/>\n\u00cen mai 2023 s-a produs ruptura. Procurorii DIICOT au descins la sediul Spitalului Jude\u021bean Arge\u0219, la \u0219apte prim\u0103rii din jude\u021b \u0219i la sediile unor firme private, \u00eentr-o ac\u021biune care p\u0103rea s\u0103 vizeze contractul pentru execu\u021bia noului corp de cl\u0103dire. De\u0219i despre acest dosar nu s-au mai auzit consecin\u021be penale de atunci, cazul fiind ulterior transferat c\u0103tre DNA, impactul institu\u021bional a fost imediat \u0219i durabil. Din acel moment, func\u021bionarii publici care ar fi trebuit s\u0103 semneze documente esen\u021biale pentru finalizarea proiectului au ales s\u0103 nu mai semneze nimic. Ultimele dou\u0103 situa\u021bii de lucr\u0103ri, de\u0219i executate de constructori pe banii lor, nu au mai fost achitate. Actualiz\u0103rile de pre\u021b solicitate ca urmare a cre\u0219terii costurilor materialelor de construc\u021bii au fost ignorate.<br \/>\nConstructorul a solicitat recep\u021bia lucr\u0103rilor \u00een octombrie 2023, prin notificare formal\u0103. Niciun r\u0103spuns. A retrimis notificarea o lun\u0103 mai t\u00e2rziu. Din nou, t\u0103cere. Abia dup\u0103 mai bine de jum\u0103tate de an, dup\u0103 schimbarea conducerii spitalului, noul manager Adrian Dumbrav\u0103 a semnat recep\u021bia. Plata \u00eens\u0103 trebuia s\u0103 vin\u0103 de la Consiliul Jude\u021bean, \u0219i nu a mai venit.<br \/>\n\u00centre timp, o cl\u0103dire de 6 niveluri, complet finalizat\u0103 \u0219i dotat\u0103 cu aparatur\u0103 medical\u0103 performant\u0103, zace nefolosit\u0103 \u00een spatele vechii cl\u0103diri a spitalului. Echipamentele de milioane de euro se degradeaz\u0103: circuitele se oxideaz\u0103, consumabilele expir\u0103, garan\u021biile se pierd. Mai mult, garan\u021bia de bun\u0103 execu\u021bie, \u00een valoare de aproape 1 milion de euro (4,4 milioane de lei) r\u0103m\u00e2ne blocat\u0103 \u00een conturile constructorului, de\u0219i legea prevede eliberarea a 70% din aceast\u0103 sum\u0103 \u00een termen de 14 zile de la recep\u021bie, dac\u0103 nu au fost ridicate preten\u021bii.<br \/>\nS\u0103tul s\u0103 a\u0219tepte \u0219i cu aproape 3 milioane de euro bloca\u021bi, constructorul, prin firma Star Trading Impex, a apelat la Curtea de Arbitraj Comercial Interna\u021bional de pe l\u00e2ng\u0103 Camera de Comer\u021b \u0219i Industrie a Rom\u00e2niei, o instan\u021b\u0103 ale c\u0103rei hot\u0103r\u00e2ri sunt recunoscute \u00een peste 160 de state ale lumii prin Conven\u021bia de la New York. Verdictul a venit \u00een iunie 2026: Spitalul Jude\u021bean Arge\u0219 trebuie s\u0103 pl\u0103teasc\u0103 firmelor Star Trading Impex \u0219i Zeus SA suma de 11.181.872,91 lei, contravaloarea ultimelor dou\u0103 situa\u021bii de lucr\u0103ri neachitate \u0219i a actualiz\u0103rilor de pre\u021buri, la care se adaug\u0103 penalit\u0103\u021bi de \u00eent\u00e2rziere care, la momentul calculului din martie 2026, se ridicau la 6 milioane de lei, adic\u0103 peste 1 milion de euro. Decizia este definitiv\u0103 \u0219i obligatorie, put\u00e2nd fi atacat\u0103 doar cu ac\u021biune \u00een anulare la Curtea de Apel.<br \/>\nReac\u021bia autorit\u0103\u021bilor publice ridic\u0103 \u00eentreb\u0103ri serioase despre capacitatea institu\u021bional\u0103 de a gestiona o astfel de situa\u021bie. Managerul Spitalului Jude\u021bean, Adrian Dumbrav\u0103, a declarat c\u0103 nu a citit decizia arbitral\u0103 de peste 70 de pagini \u00eentruc\u00e2t se afla \u00een concediu, dar c\u0103 juri\u0219tii i-au comunicat c\u0103 exist\u0103 o cale de atac \u0219i c\u0103 probabil va fi folosit\u0103. Pre\u0219edintele Consiliului Jude\u021bean Arge\u0219, Ion M\u00eenz\u00een\u0103, a oferit o explica\u021bie pentru blocajul de trei ani: a refuzat s\u0103 semneze pl\u0103\u021bile pentru c\u0103 unul dintre func\u021bionarii de dinaintea sa din lan\u021bul de \u0219apte semn\u0103turi refuza s\u0103 semneze, iar \u00een aceste condi\u021bii, dup\u0103 cum a declarat el \u00eensu\u0219i, nu ar fi semnat indiferent de circumstan\u021be, prefer\u00e2nd s\u0103 lase decizia \u00een sarcina instan\u021belor. M\u00eenz\u00een\u0103 a f\u0103cut referire la Curtea de Arbitraj Comercial Interna\u021bional \u00eentr-un mod care sugereaz\u0103 c\u0103 nu \u00eei recunoa\u0219te autoritatea deplin\u0103, invoc\u00e2nd opiniile unor fo\u0219ti judec\u0103tori ai DNA din echipa sa de consilieri, potrivit c\u0103rora hot\u0103r\u00e2rea nu ar reprezenta o problem\u0103 major\u0103. Cu privire la momentul \u00een care spitalul va putea fi efectiv folosit, pre\u0219edintele CJ a declarat c\u0103 sper\u0103 ca \u00een cursul anului s\u0103 \u00eenceap\u0103 activitatea \u00een noile spa\u021bii, o declara\u021bie care vine la trei ani dup\u0103 finalizarea fizic\u0103 a cl\u0103dirii.<br \/>\nDe cealalt\u0103 parte, constructorul ridic\u0103 \u0219i el probleme serioase privind modul \u00een care a fost gestionat contractul. Potrivit declara\u021biilor publice ale reprezentan\u021bilor firmei Star Trading Impex, autoritatea contractant\u0103 ar fi operat peste 50 de modific\u0103ri fa\u021b\u0103 de modelul de contract publicat ini\u021bial pe platforma de achizi\u021bii publice SICAP \u2014 printre care \u0219i prelungirea perioadei de garan\u021bie de la 5 la 7 ani, pe care constructorul o consider\u0103 nelegal\u0103. Cu alte cuvinte, contractul semnat ar fi diferit \u00een mod semnificativ fa\u021b\u0103 de cel pus la dispozi\u021bia publicului \u00een procedura de licita\u021bie, ceea ce ridic\u0103 \u00eentreb\u0103ri despre transparen\u021ba procesului de atribuire. \u00centre timp, cu pl\u0103\u021bile blocate de trei ani \u0219i cu obliga\u021bii financiare curente fa\u021b\u0103 de furnizori, angaja\u021bi \u0219i stat, firma a fost nevoit\u0103 s\u0103 opereze disponibiliz\u0103ri. Constructorul a anun\u021bat public c\u0103 ia \u00een calcul o pl\u00e2ngere penal\u0103 pentru abuz \u00een serviciu \u00eempotriva celor pe care \u00eei consider\u0103 responsabili de acest blocaj \u0219i a ridicat o \u00eentrebare legitim\u0103: de ce penalit\u0103\u021bile de peste 1 milion de euro, generate exclusiv de refuzul autorit\u0103\u021bilor de a pl\u0103ti \u0219i de a recep\u021biona lucr\u0103rile \u00een termenele legale, vor fi suportate tot din bani publici?<br \/>\nTabloul de ansamblu al acestui caz ridic\u0103 \u00eentreb\u0103ri clare. Cine r\u0103spunde pentru faptul c\u0103 o investi\u021bie public\u0103 de 10 milioane de euro zace nefolosit\u0103 de trei ani? Cine r\u0103spunde pentru degradarea aparaturii medicale achizi\u021bionate tot din bani publici? Cine r\u0103spunde pentru penalit\u0103\u021bile de peste 1 milion de euro, sum\u0103 care cre\u0219te zilnic, pe care le vor pl\u0103ti, \u00een cele din urm\u0103, tot contribuabilii arge\u0219eni? De ce o institu\u021bie public\u0103, \u00een loc s\u0103 respecte o decizie a unei instan\u021be arbitrale recunoscute interna\u021bional, alege s\u0103 consume resurse suplimentare pe c\u0103i de atac? \u0218i de ce func\u021bionari publici, pl\u0103ti\u021bi din bani publici, au transformat frica de r\u0103spundere penal\u0103 \u00eentr-o politic\u0103 administrativ\u0103 de neplat\u0103 ce duce la bani irosi\u021bi pentru arge\u0219eni?<br \/>\nAm transmis o serie de \u00eentreb\u0103ri at\u00e2t pre\u0219edintelui CJ Arge\u0219, Ion M\u00eenz\u00een\u0103, c\u00e2t \u0219i consilierilor jude\u021beni. Dintre acestea red\u0103m aici: Domnule pre\u0219edinte, Curtea de Arbitraj Comercial Interna\u021bional \u2014 institu\u021bie recunoscut\u0103 \u00een 160 de state \u2014 a decis definitiv c\u0103 Spitalul Jude\u021bean trebuie s\u0103 pl\u0103teasc\u0103 11,2 milioane lei plus penalit\u0103\u021bi de peste 1 milion de euro. Dumneavoastr\u0103 a\u021bi numit aceast\u0103 instan\u021b\u0103 \u2018stabor\u2019. C\u00e2nd ve\u021bi opri t\u0103r\u0103g\u0103narea \u0219i ve\u021bi aplica o sentin\u021b\u0103 definitiv\u0103, sau prefera\u021bi ca penalit\u0103\u021bile s\u0103 creasc\u0103 tot din buzunarul arge\u0219enilor? Domnule pre\u0219edinte M\u00eenz\u00een\u0103, a\u021bi declarat c\u0103 a\u021bi refuzat s\u0103 semna\u021bi pl\u0103\u021bile pentru c\u0103 \u2018poate s\u0103 \u00eenvie \u0219i mama\u2019. \u00cen acela\u0219i timp, garan\u021bia de bun\u0103 execu\u021bie de 4,4 milioane lei \u2014 bani ai constructorului, nu ai CJ \u2014 r\u0103m\u00e2ne blocat\u0103 ilegal de trei ani, de\u0219i legea impune deblocarea \u00een 14 zile de la recep\u021bie. Cum justifica\u021bi re\u021binerea acestei sume \u0219i cine r\u0103spunde juridic pentru aceast\u0103 situa\u021bie? Spitalul este finalizat \u0219i dotat de trei ani, dar pacien\u021bii arge\u0219eni sunt trata\u021bi \u00een continuare \u00een condi\u021bii precare. A\u021bi spus \u2018sper s\u0103 \u00eencepem s\u0103 lucr\u0103m \u00een spa\u021biile acelea anul \u0103sta\u2019. C\u00e2t de concret este acest \u2018sper\u2019 \u0219i ce dat\u0103 exact\u0103 a\u021bi stabilit pentru punerea \u00een func\u021biune a spitalului, sau \u2018speran\u021ba\u2019 este strategia dumneavoastr\u0103 de management? Consiliul Jude\u021bean a refuzat plata unor lucr\u0103ri executate \u0219i recep\u021bionate, invoc\u00e2nd \u2018corectitudinea\u2019 facturilor. O instan\u021b\u0103 arbitral\u0103 de elit\u0103, cu arbitri recunoscu\u021bi interna\u021bional, a decis \u00eens\u0103 c\u0103 facturile sunt legitime \u0219i oblig\u0103 la plat\u0103. Cum explica\u021bi contradic\u021bia dintre aprecierea \u2018comisiei interne\u2019 a CJ \u0219i verdictul unei instan\u021be specializate, \u0219i c\u00e2t au costat p\u00e2n\u0103 acum arge\u0219enii procesele ini\u021biate de CJ? \u00cenc\u0103 nu am primit un r\u0103spuns de la domnul M\u00eenz\u00een\u0103 sau membrii CJ Arge\u0219, dac\u0103 acesta va veni \u00eel vom mediatiza pe canalele Gold FM.<br \/>\nDac\u0103 \u0219i dumneavoastr\u0103 v\u0103 dori\u021bi o Rom\u00e2nie mai corect\u0103 \u0219i ave\u021bi informa\u021bii despre abuzurile efectuate de angaja\u021bii statului rom\u00e2n, scrie\u021bi-ne pe email la reflector@radiogoldfm.ro<\/p>\n<\/div>\n<\/div>\n<div class=\"td_block_wrap tdb_single_content tdi_120 td-pb-border-top td_block_template_1 td-post-content tagdiv-type\" data-td-block-uid=\"tdi_120\">\n<div class=\"tdb-block-inner td-fix-index\">\n<p><strong>(transcriere a rubricii \u201eReflector\u201d a Iulianei Pitaru Vlacicu, din cadrul emisiunii \u201eCe-i \u00een Gu\u0219\u0103, \u0219i-n c\u0103pu\u0219\u0103\u201d la Gold FM)<\/strong><\/p>\n<p>\u00cen iunie 2019, Spitalul Jude\u021bean de Urgen\u021b\u0103 Pite\u0219ti, aflat \u00een subordinea Consiliului Jude\u021bean Arge\u0219, lansa o licita\u021bie public\u0103 pentru construirea unui nou corp de cl\u0103dire. Valoarea estimat\u0103: peste 38 de milioane de lei, f\u0103r\u0103 TVA. Contractul a fost atribuit asocierii format\u0103 din firmele Star Trading Impex, Valah Construct Grup \u0219i Zeus SA. Lucr\u0103rile au \u00eenceput \u00een martie 2020, cu c\u00e2teva zile \u00eenainte ca Rom\u00e2nia s\u0103 intre \u00een stare de urgen\u021b\u0103 din cauza pandemiei COVID-19.<br \/>\nProiectul era ambi\u021bios: o cl\u0103dire cu regim de \u00een\u0103l\u021bime P+4, care urma s\u0103 g\u0103zduiasc\u0103 sec\u021bii vitale: Chirurgie plastic\u0103 \u0219i Ar\u0219i, Chirurgie vascular\u0103, un bloc operator cu s\u0103li de chirurgie cardiovascular\u0103 \u0219i electrofiziologie, Cardiologie, \u0219i la subsol morga \u0219i ad\u0103posturi pentru situa\u021bii de urgen\u021b\u0103. O investi\u021bie realizat\u0103 exclusiv din bugetul jude\u021bului, din banii arge\u0219enilor, pentru arge\u0219eni. Pandemia a perturbat calendarul, pre\u021burile materialelor de construc\u021bii au explodat, devizele au fost ajustate conform legii, dar p\u00e2n\u0103 \u00een 2023 proiectul p\u0103rea s\u0103 se deruleze f\u0103r\u0103 probleme majore. Cl\u0103direa era ridicat\u0103, aparatura medical\u0103 de ultim\u0103 genera\u021bie era comandat\u0103 \u0219i par\u021bial instalat\u0103.<br \/>\n\u00cen mai 2023 s-a produs ruptura. Procurorii DIICOT au descins la sediul Spitalului Jude\u021bean Arge\u0219, la \u0219apte prim\u0103rii din jude\u021b \u0219i la sediile unor firme private, \u00eentr-o ac\u021biune care p\u0103rea s\u0103 vizeze contractul pentru execu\u021bia noului corp de cl\u0103dire. De\u0219i despre acest dosar nu s-au mai auzit consecin\u021be penale de atunci, cazul fiind ulterior transferat c\u0103tre DNA, impactul institu\u021bional a fost imediat \u0219i durabil. Din acel moment, func\u021bionarii publici care ar fi trebuit s\u0103 semneze documente esen\u021biale pentru finalizarea proiectului au ales s\u0103 nu mai semneze nimic. Ultimele dou\u0103 situa\u021bii de lucr\u0103ri, de\u0219i executate de constructori pe banii lor, nu au mai fost achitate. Actualiz\u0103rile de pre\u021b solicitate ca urmare a cre\u0219terii costurilor materialelor de construc\u021bii au fost ignorate.<br \/>\nConstructorul a solicitat recep\u021bia lucr\u0103rilor \u00een octombrie 2023, prin notificare formal\u0103. Niciun r\u0103spuns. A retrimis notificarea o lun\u0103 mai t\u00e2rziu. Din nou, t\u0103cere. Abia dup\u0103 mai bine de jum\u0103tate de an, dup\u0103 schimbarea conducerii spitalului, noul manager Adrian Dumbrav\u0103 a semnat recep\u021bia. Plata \u00eens\u0103 trebuia s\u0103 vin\u0103 de la Consiliul Jude\u021bean, \u0219i nu a mai venit.<br \/>\n\u00centre timp, o cl\u0103dire de 6 niveluri, complet finalizat\u0103 \u0219i dotat\u0103 cu aparatur\u0103 medical\u0103 performant\u0103, zace nefolosit\u0103 \u00een spatele vechii cl\u0103diri a spitalului. Echipamentele de milioane de euro se degradeaz\u0103: circuitele se oxideaz\u0103, consumabilele expir\u0103, garan\u021biile se pierd. Mai mult, garan\u021bia de bun\u0103 execu\u021bie, \u00een valoare de aproape 1 milion de euro (4,4 milioane de lei) r\u0103m\u00e2ne blocat\u0103 \u00een conturile constructorului, de\u0219i legea prevede eliberarea a 70% din aceast\u0103 sum\u0103 \u00een termen de 14 zile de la recep\u021bie, dac\u0103 nu au fost ridicate preten\u021bii.<br \/>\nS\u0103tul s\u0103 a\u0219tepte \u0219i cu aproape 3 milioane de euro bloca\u021bi, constructorul, prin firma Star Trading Impex, a apelat la Curtea de Arbitraj Comercial Interna\u021bional de pe l\u00e2ng\u0103 Camera de Comer\u021b \u0219i Industrie a Rom\u00e2niei, o instan\u021b\u0103 ale c\u0103rei hot\u0103r\u00e2ri sunt recunoscute \u00een peste 160 de state ale lumii prin Conven\u021bia de la New York. Verdictul a venit \u00een iunie 2026: Spitalul Jude\u021bean Arge\u0219 trebuie s\u0103 pl\u0103teasc\u0103 firmelor Star Trading Impex \u0219i Zeus SA suma de 11.181.872,91 lei, contravaloarea ultimelor dou\u0103 situa\u021bii de lucr\u0103ri neachitate \u0219i a actualiz\u0103rilor de pre\u021buri, la care se adaug\u0103 penalit\u0103\u021bi de \u00eent\u00e2rziere care, la momentul calculului din martie 2026, se ridicau la 6 milioane de lei, adic\u0103 peste 1 milion de euro. Decizia este definitiv\u0103 \u0219i obligatorie, put\u00e2nd fi atacat\u0103 doar cu ac\u021biune \u00een anulare la Curtea de Apel.<br \/>\nReac\u021bia autorit\u0103\u021bilor publice ridic\u0103 \u00eentreb\u0103ri serioase despre capacitatea institu\u021bional\u0103 de a gestiona o astfel de situa\u021bie. Managerul Spitalului Jude\u021bean, Adrian Dumbrav\u0103, a declarat c\u0103 nu a citit decizia arbitral\u0103 de peste 70 de pagini \u00eentruc\u00e2t se afla \u00een concediu, dar c\u0103 juri\u0219tii i-au comunicat c\u0103 exist\u0103 o cale de atac \u0219i c\u0103 probabil va fi folosit\u0103. Pre\u0219edintele Consiliului Jude\u021bean Arge\u0219, Ion M\u00eenz\u00een\u0103, a oferit o explica\u021bie pentru blocajul de trei ani: a refuzat s\u0103 semneze pl\u0103\u021bile pentru c\u0103 unul dintre func\u021bionarii de dinaintea sa din lan\u021bul de \u0219apte semn\u0103turi refuza s\u0103 semneze, iar \u00een aceste condi\u021bii, dup\u0103 cum a declarat el \u00eensu\u0219i, nu ar fi semnat indiferent de circumstan\u021be, prefer\u00e2nd s\u0103 lase decizia \u00een sarcina instan\u021belor. M\u00eenz\u00een\u0103 a f\u0103cut referire la Curtea de Arbitraj Comercial Interna\u021bional \u00eentr-un mod care sugereaz\u0103 c\u0103 nu \u00eei recunoa\u0219te autoritatea deplin\u0103, invoc\u00e2nd opiniile unor fo\u0219ti judec\u0103tori ai DNA din echipa sa de consilieri, potrivit c\u0103rora hot\u0103r\u00e2rea nu ar reprezenta o problem\u0103 major\u0103. Cu privire la momentul \u00een care spitalul va putea fi efectiv folosit, pre\u0219edintele CJ a declarat c\u0103 sper\u0103 ca \u00een cursul anului s\u0103 \u00eenceap\u0103 activitatea \u00een noile spa\u021bii, o declara\u021bie care vine la trei ani dup\u0103 finalizarea fizic\u0103 a cl\u0103dirii.<br \/>\nDe cealalt\u0103 parte, constructorul ridic\u0103 \u0219i el probleme serioase privind modul \u00een care a fost gestionat contractul. Potrivit declara\u021biilor publice ale reprezentan\u021bilor firmei Star Trading Impex, autoritatea contractant\u0103 ar fi operat peste 50 de modific\u0103ri fa\u021b\u0103 de modelul de contract publicat ini\u021bial pe platforma de achizi\u021bii publice SICAP \u2014 printre care \u0219i prelungirea perioadei de garan\u021bie de la 5 la 7 ani, pe care constructorul o consider\u0103 nelegal\u0103. Cu alte cuvinte, contractul semnat ar fi diferit \u00een mod semnificativ fa\u021b\u0103 de cel pus la dispozi\u021bia publicului \u00een procedura de licita\u021bie, ceea ce ridic\u0103 \u00eentreb\u0103ri despre transparen\u021ba procesului de atribuire. \u00centre timp, cu pl\u0103\u021bile blocate de trei ani \u0219i cu obliga\u021bii financiare curente fa\u021b\u0103 de furnizori, angaja\u021bi \u0219i stat, firma a fost nevoit\u0103 s\u0103 opereze disponibiliz\u0103ri. Constructorul a anun\u021bat public c\u0103 ia \u00een calcul o pl\u00e2ngere penal\u0103 pentru abuz \u00een serviciu \u00eempotriva celor pe care \u00eei consider\u0103 responsabili de acest blocaj \u0219i a ridicat o \u00eentrebare legitim\u0103: de ce penalit\u0103\u021bile de peste 1 milion de euro, generate exclusiv de refuzul autorit\u0103\u021bilor de a pl\u0103ti \u0219i de a recep\u021biona lucr\u0103rile \u00een termenele legale, vor fi suportate tot din bani publici?<br \/>\nTabloul de ansamblu al acestui caz ridic\u0103 \u00eentreb\u0103ri clare. Cine r\u0103spunde pentru faptul c\u0103 o investi\u021bie public\u0103 de 10 milioane de euro zace nefolosit\u0103 de trei ani? Cine r\u0103spunde pentru degradarea aparaturii medicale achizi\u021bionate tot din bani publici? Cine r\u0103spunde pentru penalit\u0103\u021bile de peste 1 milion de euro, sum\u0103 care cre\u0219te zilnic, pe care le vor pl\u0103ti, \u00een cele din urm\u0103, tot contribuabilii arge\u0219eni? De ce o institu\u021bie public\u0103, \u00een loc s\u0103 respecte o decizie a unei instan\u021be arbitrale recunoscute interna\u021bional, alege s\u0103 consume resurse suplimentare pe c\u0103i de atac? \u0218i de ce func\u021bionari publici, pl\u0103ti\u021bi din bani publici, au transformat frica de r\u0103spundere penal\u0103 \u00eentr-o politic\u0103 administrativ\u0103 de neplat\u0103 ce duce la bani irosi\u021bi pentru arge\u0219eni?<br \/>\nAm transmis o serie de \u00eentreb\u0103ri at\u00e2t pre\u0219edintelui CJ Arge\u0219, Ion M\u00eenz\u00een\u0103, c\u00e2t \u0219i consilierilor jude\u021beni. Dintre acestea red\u0103m aici: Domnule pre\u0219edinte, Curtea de Arbitraj Comercial Interna\u021bional \u2014 institu\u021bie recunoscut\u0103 \u00een 160 de state \u2014 a decis definitiv c\u0103 Spitalul Jude\u021bean trebuie s\u0103 pl\u0103teasc\u0103 11,2 milioane lei plus penalit\u0103\u021bi de peste 1 milion de euro. Dumneavoastr\u0103 a\u021bi numit aceast\u0103 instan\u021b\u0103 \u2018stabor\u2019. C\u00e2nd ve\u021bi opri t\u0103r\u0103g\u0103narea \u0219i ve\u021bi aplica o sentin\u021b\u0103 definitiv\u0103, sau prefera\u021bi ca penalit\u0103\u021bile s\u0103 creasc\u0103 tot din buzunarul arge\u0219enilor? Domnule pre\u0219edinte M\u00eenz\u00een\u0103, a\u021bi declarat c\u0103 a\u021bi refuzat s\u0103 semna\u021bi pl\u0103\u021bile pentru c\u0103 \u2018poate s\u0103 \u00eenvie \u0219i mama\u2019. \u00cen acela\u0219i timp, garan\u021bia de bun\u0103 execu\u021bie de 4,4 milioane lei \u2014 bani ai constructorului, nu ai CJ \u2014 r\u0103m\u00e2ne blocat\u0103 ilegal de trei ani, de\u0219i legea impune deblocarea \u00een 14 zile de la recep\u021bie. Cum justifica\u021bi re\u021binerea acestei sume \u0219i cine r\u0103spunde juridic pentru aceast\u0103 situa\u021bie? Spitalul este finalizat \u0219i dotat de trei ani, dar pacien\u021bii arge\u0219eni sunt trata\u021bi \u00een continuare \u00een condi\u021bii precare. A\u021bi spus \u2018sper s\u0103 \u00eencepem s\u0103 lucr\u0103m \u00een spa\u021biile acelea anul \u0103sta\u2019. C\u00e2t de concret este acest \u2018sper\u2019 \u0219i ce dat\u0103 exact\u0103 a\u021bi stabilit pentru punerea \u00een func\u021biune a spitalului, sau \u2018speran\u021ba\u2019 este strategia dumneavoastr\u0103 de management? Consiliul Jude\u021bean a refuzat plata unor lucr\u0103ri executate \u0219i recep\u021bionate, invoc\u00e2nd \u2018corectitudinea\u2019 facturilor. O instan\u021b\u0103 arbitral\u0103 de elit\u0103, cu arbitri recunoscu\u021bi interna\u021bional, a decis \u00eens\u0103 c\u0103 facturile sunt legitime \u0219i oblig\u0103 la plat\u0103. Cum explica\u021bi contradic\u021bia dintre aprecierea \u2018comisiei interne\u2019 a CJ \u0219i verdictul unei instan\u021be specializate, \u0219i c\u00e2t au costat p\u00e2n\u0103 acum arge\u0219enii procesele ini\u021biate de CJ? \u00cenc\u0103 nu am primit un r\u0103spuns de la domnul M\u00eenz\u00een\u0103 sau membrii CJ Arge\u0219, dac\u0103 acesta va veni \u00eel vom mediatiza pe canalele Gold FM.<br \/>\nDac\u0103 \u0219i dumneavoastr\u0103 v\u0103 dori\u021bi o Rom\u00e2nie mai corect\u0103 \u0219i ave\u021bi informa\u021bii despre abuzurile efectuate de angaja\u021bii statului rom\u00e2n, scrie\u021bi-ne pe email la reflector@radiogoldfm.ro<\/p>\n<\/div>\n<\/div>\n<p>[analyse_source url=&#8221;https:\/\/solidnews.ro\/reflector-la-gold-fm-pitesti-spitalul-de-10-milioane-de-euro-care-nu-salveaza-nicio-viata\/&#8221;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/solidnews.ro\/wp-content\/uploads\/2026\/06\/reflector-la-gold-fm-pitesti.jpeg&#8221;] (transcriere a rubricii \u201eReflector\u201d a Iulianei Pitaru Vlacicu, din cadrul emisiunii \u201eCe-i \u00een Gu\u0219\u0103, \u0219i-n c\u0103pu\u0219\u0103\u201d la Gold FM) \u00cen iunie 2019, Spitalul Jude\u021bean de Urgen\u021b\u0103 Pite\u0219ti, aflat \u00een subordinea Consiliului Jude\u021bean Arge\u0219, lansa o licita\u021bie public\u0103 pentru construirea unui nou corp de cl\u0103dire. Valoarea estimat\u0103: peste 38 de milioane de lei, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[226,97],"class_list":["post-2016889","post","type-post","status-publish","format-standard","hentry","category-romania","tag-crawlmanager","tag-solidnews-ro"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2016889","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2016889"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2016889\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2016889"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2016889"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2016889"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}