{"id":2004458,"date":"2026-06-22T11:43:58","date_gmt":"2026-06-22T08:43:58","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=2004458"},"modified":"2026-06-22T11:43:58","modified_gmt":"2026-06-22T08:43:58","slug":"avanseaza-lucrarile-la-calea-ferata-lugoj-timisoara-est-proiectul-a-ajuns-la-un-stadiu-de-aproape-75","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=2004458","title":{"rendered":"Avanseaz\u0103 lucr\u0103rile la calea ferat\u0103 Lugoj \u2013 Timi\u0219oara Est! Proiectul a ajuns la un stadiu de aproape 75%"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;http:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/06\/cale-ferata-lugoj-tm.png&#8221;]<\/p>\n<div class=\"post-content-bd\">\n<p>Se lucreaz\u0103 de zor pe \u0219antierul c\u0103ii ferate Lugoj \u2013 Timi\u0219oara. CFR Infrastructur\u0103 informeaz\u0103 c\u0103 investi\u021bia a ajuns la un stadiu de aproape 75%.<\/p>\n<p><em>\u201ePe \u0219antierul Lotului 2 Lugoj \u2013 Timi\u0219oara Est, parte a proiectului de modernizare a liniei feroviare Caransebe\u0219 \u2013 Timi\u0219oara \u2013 Arad, lucr\u0103rile continu\u0103 pe o lungime de 53,91 km, \u00een jude\u021bul Timi\u0219. Stadiul fizic al proiectului a ajuns la 74,35%, iar lucr\u0103rile sunt \u00een derulare. Interven\u021biile vizeaz\u0103 modernizarea infrastructurii \u0219i suprastructurii feroviare, lucr\u0103ri la terasamente, drenaj, instala\u021bii feroviare, aparate de cale, poduri, pode\u021be, peroane, copertine \u0219i elemente de protec\u021bie a mediului. \u00cen zona Topolov\u0103\u021b, aproximativ 10 km de infrastructur\u0103 modernizat\u0103 au fost deja deschi\u0219i circula\u021biei\u201d<\/em>, a transmis institu\u021bia.<\/p>\n<p>La finalizarea lucr\u0103rilor, modernizarea liniei va permite cre\u0219terea vitezei de circula\u021bie p\u00e2n\u0103 la 160 km\/h pentru trenurile de c\u0103l\u0103tori \u0219i p\u00e2n\u0103 la 120 km\/h pentru trenurile de marf\u0103.<\/p>\n<\/div>\n<p>[analyse_source url=&#8221;https:\/\/www.banatulmeu.ro\/avanseaza-lucrarile-la-calea-ferata-lugoj-timisoara-est-proiectul-a-ajuns-la-un-stadiu-de-aproape-75\/&#8221;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;http:\/\/www.banatulmeu.ro\/wp-content\/uploads\/2026\/06\/cale-ferata-lugoj-tm.png&#8221;] Se lucreaz\u0103 de zor pe \u0219antierul c\u0103ii ferate Lugoj \u2013 Timi\u0219oara. CFR Infrastructur\u0103 informeaz\u0103 c\u0103 investi\u021bia a ajuns la un stadiu de aproape 75%. \u201ePe \u0219antierul Lotului 2 Lugoj \u2013 Timi\u0219oara Est, parte a proiectului de modernizare a liniei feroviare Caransebe\u0219 \u2013 Timi\u0219oara \u2013 Arad, lucr\u0103rile continu\u0103 pe o lungime de 53,91 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[204,226],"class_list":["post-2004458","post","type-post","status-publish","format-standard","hentry","category-romania","tag-banatulmeu-ro","tag-crawlmanager"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2004458","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2004458"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2004458\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2004458"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2004458"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2004458"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}