{"id":2002075,"date":"2026-06-19T17:56:37","date_gmt":"2026-06-19T14:56:37","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=2002075"},"modified":"2026-06-19T17:56:37","modified_gmt":"2026-06-19T14:56:37","slug":"primaria-voineasa-intinde-retele-electrice-pe-kilometri-intregi-pentru-a-deschide-drumul-noilor-investitii-in-turism","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=2002075","title":{"rendered":"Prim\u0103ria Voineasa \u00eentinde re\u021bele electrice pe kilometri \u00eentregi pentru a deschide drumul noilor investi\u021bii \u00een turism"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/www.impactreal.ro\/wp-content\/uploads\/2019\/09\/VOINEASA-primar-GABRIEL-NASTASESCU.jpg&#8221;]<\/p>\n<div class=\"single-news-content\">\n<div class=\"news-image\"><img loading=\"lazy\" decoding=\"async\" width=\"2064\" height=\"1548\" src=\"https:\/\/www.impactreal.ro\/wp-content\/uploads\/2019\/09\/VOINEASA-primar-GABRIEL-NASTASESCU.jpg\" class=\"img-responsive wp-post-image\" alt=\"Prim\u0103ria Voineasa \u00eentinde re\u021bele electrice pe kilometri \u00eentregi pentru a deschide drumul noilor investi\u021bii \u00een turism\"><\/div>\n<div class=\"news-detail clearfix\">\n<div class=\"entry-meta\"><span class=\"posted-date\"><a href=\"https:\/\/www.impactreal.ro\/2026\/06\/19\/primaria-voineasa-intinde-retele-electrice-pe-kilometri-intregi-pentru-a-deschide-drumul-noilor-investitii-in-turism\/\" rel=\"bookmark\"><time class=\"entry-date published updated\" datetime=\"2026-06-19T20:56:37+03:00\">19 iunie 2026<\/time><\/a><\/span><span class=\"author vcard\"><a href=\"https:\/\/www.impactreal.ro\/author\/claudia-schiopu\/\">Claudia Schiopu<\/a><\/span><span class=\"cat-links\"><a href=\"https:\/\/www.impactreal.ro\/category\/administratie\/\" rel=\"category tag\">Administra\u0163ie<\/a><a href=\"https:\/\/www.impactreal.ro\/category\/voineasa\/\" rel=\"category tag\">Voineasa<\/a><\/span><\/div>\n<div class=\"news-content editor-content-entry\">\n<p>La Voineasa se lucreaz\u0103 pe mai multe \u0219antiere \u00een acela\u0219i timp. Unele investi\u021bii sunt deja \u00een execu\u021bie, altele se afl\u0103 \u00een faza de avize sau de preg\u0103tire. Problema cea mai mare nu este lipsa proiectelor, ci sumele pe care administra\u021bia local\u0103 trebuie s\u0103 le asigure din bugetul propriu pentru cofinan\u021b\u0103ri.<\/p>\n<p>\u00cen aceast\u0103 perioad\u0103, printr-un proiect finan\u021bat \u00a0prin ADR Sud-Vest Oltenia, sediul Prim\u0103riei trece printr-un amplu proces de modernizare. Acoperi\u0219ul este ref\u0103cut, fa\u021bada cl\u0103dirii este renovat\u0103, sunt montate panouri fotovoltaice, au fost instalate aparate de aer condi\u021bionat, iar urm\u0103toarea etap\u0103 presupune montarea repartitoarelor pentru \u00eenc\u0103lzire.<\/p>\n<p>\u00cen apropierea prim\u0103riei se desf\u0103\u0219oar\u0103 lucr\u0103ri \u0219i prin Programul \u201eAnghel Saligny\u201d. Se asfalteaz\u0103 strada aflat\u0103 l\u00e2ng\u0103 institu\u021bie, se amenajeaz\u0103 rigola pentru scurgerea apelor, iar zona va beneficia \u0219i de o parcare modernizat\u0103.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-57415\" src=\"https:\/\/www.impactreal.ro\/wp-content\/uploads\/2026\/06\/voineasa-primaria-300x225.jpeg\" alt width=\"300\" height=\"225\"><\/p>\n<p><strong><u>Planuri pentru c\u0103minul cultural<\/u><\/strong><\/p>\n<p>Un alt obiectiv aflat pe lista administra\u021biei locale este c\u0103minul cultural. Lucr\u0103rile depind \u00eens\u0103 de posibilit\u0103\u021bile financiare ale localit\u0103\u021bii.<\/p>\n<p>Bugetul actual nu permite investi\u021bii ample din surse proprii, astfel c\u0103 lucr\u0103rile vor fi realizate \u00een func\u021bie de fondurile disponibile.<\/p>\n<p><strong><u>Re\u021belele electrice, o investi\u021bie esen\u021bial\u0103<\/u><\/strong><\/p>\n<p>Una dintre cele mai costisitoare investi\u021bii este extinderea re\u021belelor electrice \u00een mai multe zone ale localit\u0103\u021bii.<\/p>\n<p><u>Prim\u0103ria are bloca\u021bi aproximativ 450.000 de lei pentru astfel de lucr\u0103ri \u0219i a solicitat sprijin financiar inclusiv din partea Consiliului Jude\u021bean V\u00e2lcea<\/u>.<\/p>\n<p>Necesitatea acestor investi\u021bii este legat\u0103 direct de dezvoltarea turistic\u0103 a localit\u0103\u021bii. Exist\u0103 zone unde au fost construite case de vacan\u021b\u0103, pensiuni sau alte obiective turistice, \u00eens\u0103 lipsa energiei electrice \u00eempiedic\u0103 folosirea lor la adev\u0103ratul poten\u021bial.<\/p>\n<p>Prima investi\u021bie important\u0103 vizeaz\u0103 zona Voine\u0219i\u021ba. \u00a0Aici este preg\u0103tit\u0103 o extindere de re\u021bea de medie tensiune pe o lungime de aproximativ 2,2 kilometri \u0219i o re\u021bea de joas\u0103 tensiune de peste un kilometru. Cofinan\u021barea necesar\u0103 dep\u0103\u0219e\u0219te 1,4 milioane de lei.<\/p>\n<p>Lucr\u0103rile sunt deja pornite, \u00eens\u0103 efortul financiar r\u0103m\u00e2ne foarte mare pentru bugetul local.<\/p>\n<p>Proiecte similare sunt preg\u0103tite \u0219i \u00een zona Lotru-Axial, c\u0103tre Gura Dobrunului, la Ob\u00e2r\u0219ia Lotrului, pe strada Leurda \u0219i \u00een zona M\u0103n\u0103ileasa.<\/p>\n<p>La final, toate aceste investi\u021bii \u00eensumeaz\u0103 peste zece kilometri de extinderi de re\u021bele electrice.<\/p>\n<p>\u00a0<\/p>\n<p><strong><u>Un hotel construit de ani de zile a\u0219teapt\u0103 \u00eenc\u0103 energia electric\u0103<\/u><\/strong><\/p>\n<p>Situa\u021bia din Voine\u0219i\u021ba arat\u0103 c\u00e2t de important\u0103 este aceast\u0103 investi\u021bie.<\/p>\n<p>Acolo exist\u0103 un hotel construit de c\u00e2\u021biva ani \u0219i care nu poate func\u021biona normal din cauza lipsei aliment\u0103rii cu energie electric\u0103.<\/p>\n<p>Drumul a fost asfaltat, iar administra\u021bia local\u0103 \u00ee\u0219i propune s\u0103 duc\u0103 \u00een zon\u0103 \u0219i re\u021beaua electric\u0103, urmat\u0103 de extinderea sistemului de canalizare.<\/p>\n<p>\u201d<strong><em>Pentru cei care vor s\u0103 investeasc\u0103 \u00een pensiuni, case de vacan\u021b\u0103 sau alte unit\u0103\u021bi turistice, existen\u021ba utilit\u0103\u021bilor reprezint\u0103 condi\u021bia de baz\u0103 pentru dezvoltare<\/em><\/strong>\u201d a precizat primarul.<\/p>\n<p><strong><u>Canalizarea se apropie de final<\/u><\/strong><\/p>\n<p>\u00cen prezent, sistemul de canalizare acoper\u0103 peste 90% din localitate.<\/p>\n<p>Au r\u0103mas c\u00e2teva zone care nu beneficiaz\u0103 \u00eenc\u0103 de acest serviciu. Pentru acestea sunt preg\u0103tite studii de fezabilitate \u0219i documenta\u021biile necesare.<\/p>\n<p>Lucr\u0103rile nu presupun distan\u021be mari, \u00eens\u0103 procedurile administrative necesit\u0103 numeroase avize \u0219i aprob\u0103ri.<\/p>\n<p>Voineasa este inclus\u0103 \u0219i \u00een Master Planul jude\u021bean pentru ap\u0103 \u0219i canalizare, proiect coordonat de ADI Ap\u0103 V\u00e2lcea \u0219i Apavil, finan\u021bat prin Programul Dezvoltare Durabil\u0103. Urm\u0103toarea etap\u0103 este organizarea licita\u021biei de c\u0103tre operatorul regional.<\/p>\n<p>\u00a0<\/p>\n<p><strong><u>Speran\u021be pentru Ob\u00e2r\u0219ia Lotrului<\/u><\/strong><\/p>\n<p>Un alt proiect important prive\u0219te extinderea re\u021belelor de ap\u0103 \u0219i canalizare la Ob\u00e2r\u0219ia Lotrului.<\/p>\n<p>Documenta\u021bia se afl\u0103 \u00een faza de ob\u021binere a avizelor, iar administra\u021bia local\u0103 a\u0219teapt\u0103 confirmarea finan\u021b\u0103rii.<\/p>\n<p>Experien\u021bele anterioare \u00eei fac pe reprezentan\u021bii prim\u0103riei s\u0103 priveasc\u0103 lucrurile cu pruden\u021b\u0103. Au existat situa\u021bii \u00een care proiectele au fost declarate eligibile, dar nu au mai primit finan\u021bare din cauza epuiz\u0103rii fondurilor disponibile.<\/p>\n<p><strong><u>Gabriel N\u0103st\u0103sescu: \u201eTrebuie s\u0103 ducem utilit\u0103\u021bile acolo unde exist\u0103 cerere pentru investi\u021bii\u201d<\/u><\/strong><\/p>\n<p>Primarul Gabriel N\u0103st\u0103sescu spune c\u0103 extinderea utilit\u0103\u021bilor reprezint\u0103 una dintre cele mai importante direc\u021bii pentru dezvoltarea localit\u0103\u021bii: \u201e<strong><em>Avem zone cu un poten\u021bial turistic foarte mare \u0219i trebuie s\u0103 ducem utilit\u0103\u021bile acolo unde exist\u0103 cerere pentru investi\u021bii. Vorbim despre energie electric\u0103, ap\u0103, canalizare \u0219i drumuri. Sunt lucr\u0103ri costisitoare, dar necesare pentru cei care vor s\u0103 construiasc\u0103 pensiuni, case de vacan\u021b\u0103 sau alte unit\u0103\u021bi turistice<\/em><\/strong>\u201d, a declarat primarul Gabriel N\u0103st\u0103sescu.<\/p>\n<p><strong><u>Pentru investitori, utilit\u0103\u021bile reprezint\u0103 primul lucru de care au nevoie. Curentul electric, apa, canalizarea \u0219i drumurile stau la baza oric\u0103rui proiect care poate aduce turi\u0219ti \u0219i locuri de munc\u0103<\/u><\/strong>.<\/p>\n<p>\u00a0<\/p>\n<p>\u00a0<\/p>\n<p>\u00a0<\/p>\n<p>\u00a0<\/p>\n<p>\u00a0<\/p>\n<p>\u00a0<\/p>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"news-content editor-content-entry\">\n<p>La Voineasa se lucreaz\u0103 pe mai multe \u0219antiere \u00een acela\u0219i timp. Unele investi\u021bii sunt deja \u00een execu\u021bie, altele se afl\u0103 \u00een faza de avize sau de preg\u0103tire. Problema cea mai mare nu este lipsa proiectelor, ci sumele pe care administra\u021bia local\u0103 trebuie s\u0103 le asigure din bugetul propriu pentru cofinan\u021b\u0103ri.<\/p>\n<p>\u00cen aceast\u0103 perioad\u0103, printr-un proiect finan\u021bat \u00a0prin ADR Sud-Vest Oltenia, sediul Prim\u0103riei trece printr-un amplu proces de modernizare. Acoperi\u0219ul este ref\u0103cut, fa\u021bada cl\u0103dirii este renovat\u0103, sunt montate panouri fotovoltaice, au fost instalate aparate de aer condi\u021bionat, iar urm\u0103toarea etap\u0103 presupune montarea repartitoarelor pentru \u00eenc\u0103lzire.<\/p>\n<p>\u00cen apropierea prim\u0103riei se desf\u0103\u0219oar\u0103 lucr\u0103ri \u0219i prin Programul \u201eAnghel Saligny\u201d. Se asfalteaz\u0103 strada aflat\u0103 l\u00e2ng\u0103 institu\u021bie, se amenajeaz\u0103 rigola pentru scurgerea apelor, iar zona va beneficia \u0219i de o parcare modernizat\u0103.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-57415\" src=\"https:\/\/www.impactreal.ro\/wp-content\/uploads\/2026\/06\/voineasa-primaria-300x225.jpeg\" alt width=\"300\" height=\"225\"><\/p>\n<p><strong><u>Planuri pentru c\u0103minul cultural<\/u><\/strong><\/p>\n<p>Un alt obiectiv aflat pe lista administra\u021biei locale este c\u0103minul cultural. Lucr\u0103rile depind \u00eens\u0103 de posibilit\u0103\u021bile financiare ale localit\u0103\u021bii.<\/p>\n<p>Bugetul actual nu permite investi\u021bii ample din surse proprii, astfel c\u0103 lucr\u0103rile vor fi realizate \u00een func\u021bie de fondurile disponibile.<\/p>\n<p><strong><u>Re\u021belele electrice, o investi\u021bie esen\u021bial\u0103<\/u><\/strong><\/p>\n<p>Una dintre cele mai costisitoare investi\u021bii este extinderea re\u021belelor electrice \u00een mai multe zone ale localit\u0103\u021bii.<\/p>\n<p><u>Prim\u0103ria are bloca\u021bi aproximativ 450.000 de lei pentru astfel de lucr\u0103ri \u0219i a solicitat sprijin financiar inclusiv din partea Consiliului Jude\u021bean V\u00e2lcea<\/u>.<\/p>\n<p>Necesitatea acestor investi\u021bii este legat\u0103 direct de dezvoltarea turistic\u0103 a localit\u0103\u021bii. Exist\u0103 zone unde au fost construite case de vacan\u021b\u0103, pensiuni sau alte obiective turistice, \u00eens\u0103 lipsa energiei electrice \u00eempiedic\u0103 folosirea lor la adev\u0103ratul poten\u021bial.<\/p>\n<p>Prima investi\u021bie important\u0103 vizeaz\u0103 zona Voine\u0219i\u021ba. \u00a0Aici este preg\u0103tit\u0103 o extindere de re\u021bea de medie tensiune pe o lungime de aproximativ 2,2 kilometri \u0219i o re\u021bea de joas\u0103 tensiune de peste un kilometru. Cofinan\u021barea necesar\u0103 dep\u0103\u0219e\u0219te 1,4 milioane de lei.<\/p>\n<p>Lucr\u0103rile sunt deja pornite, \u00eens\u0103 efortul financiar r\u0103m\u00e2ne foarte mare pentru bugetul local.<\/p>\n<p>Proiecte similare sunt preg\u0103tite \u0219i \u00een zona Lotru-Axial, c\u0103tre Gura Dobrunului, la Ob\u00e2r\u0219ia Lotrului, pe strada Leurda \u0219i \u00een zona M\u0103n\u0103ileasa.<\/p>\n<p>La final, toate aceste investi\u021bii \u00eensumeaz\u0103 peste zece kilometri de extinderi de re\u021bele electrice.<\/p>\n<p>\u00a0<\/p>\n<p><strong><u>Un hotel construit de ani de zile a\u0219teapt\u0103 \u00eenc\u0103 energia electric\u0103<\/u><\/strong><\/p>\n<p>Situa\u021bia din Voine\u0219i\u021ba arat\u0103 c\u00e2t de important\u0103 este aceast\u0103 investi\u021bie.<\/p>\n<p>Acolo exist\u0103 un hotel construit de c\u00e2\u021biva ani \u0219i care nu poate func\u021biona normal din cauza lipsei aliment\u0103rii cu energie electric\u0103.<\/p>\n<p>Drumul a fost asfaltat, iar administra\u021bia local\u0103 \u00ee\u0219i propune s\u0103 duc\u0103 \u00een zon\u0103 \u0219i re\u021beaua electric\u0103, urmat\u0103 de extinderea sistemului de canalizare.<\/p>\n<p>\u201d<strong><em>Pentru cei care vor s\u0103 investeasc\u0103 \u00een pensiuni, case de vacan\u021b\u0103 sau alte unit\u0103\u021bi turistice, existen\u021ba utilit\u0103\u021bilor reprezint\u0103 condi\u021bia de baz\u0103 pentru dezvoltare<\/em><\/strong>\u201d a precizat primarul.<\/p>\n<p><strong><u>Canalizarea se apropie de final<\/u><\/strong><\/p>\n<p>\u00cen prezent, sistemul de canalizare acoper\u0103 peste 90% din localitate.<\/p>\n<p>Au r\u0103mas c\u00e2teva zone care nu beneficiaz\u0103 \u00eenc\u0103 de acest serviciu. Pentru acestea sunt preg\u0103tite studii de fezabilitate \u0219i documenta\u021biile necesare.<\/p>\n<p>Lucr\u0103rile nu presupun distan\u021be mari, \u00eens\u0103 procedurile administrative necesit\u0103 numeroase avize \u0219i aprob\u0103ri.<\/p>\n<p>Voineasa este inclus\u0103 \u0219i \u00een Master Planul jude\u021bean pentru ap\u0103 \u0219i canalizare, proiect coordonat de ADI Ap\u0103 V\u00e2lcea \u0219i Apavil, finan\u021bat prin Programul Dezvoltare Durabil\u0103. Urm\u0103toarea etap\u0103 este organizarea licita\u021biei de c\u0103tre operatorul regional.<\/p>\n<p>\u00a0<\/p>\n<p><strong><u>Speran\u021be pentru Ob\u00e2r\u0219ia Lotrului<\/u><\/strong><\/p>\n<p>Un alt proiect important prive\u0219te extinderea re\u021belelor de ap\u0103 \u0219i canalizare la Ob\u00e2r\u0219ia Lotrului.<\/p>\n<p>Documenta\u021bia se afl\u0103 \u00een faza de ob\u021binere a avizelor, iar administra\u021bia local\u0103 a\u0219teapt\u0103 confirmarea finan\u021b\u0103rii.<\/p>\n<p>Experien\u021bele anterioare \u00eei fac pe reprezentan\u021bii prim\u0103riei s\u0103 priveasc\u0103 lucrurile cu pruden\u021b\u0103. Au existat situa\u021bii \u00een care proiectele au fost declarate eligibile, dar nu au mai primit finan\u021bare din cauza epuiz\u0103rii fondurilor disponibile.<\/p>\n<p><strong><u>Gabriel N\u0103st\u0103sescu: \u201eTrebuie s\u0103 ducem utilit\u0103\u021bile acolo unde exist\u0103 cerere pentru investi\u021bii\u201d<\/u><\/strong><\/p>\n<p>Primarul Gabriel N\u0103st\u0103sescu spune c\u0103 extinderea utilit\u0103\u021bilor reprezint\u0103 una dintre cele mai importante direc\u021bii pentru dezvoltarea localit\u0103\u021bii: \u201e<strong><em>Avem zone cu un poten\u021bial turistic foarte mare \u0219i trebuie s\u0103 ducem utilit\u0103\u021bile acolo unde exist\u0103 cerere pentru investi\u021bii. Vorbim despre energie electric\u0103, ap\u0103, canalizare \u0219i drumuri. Sunt lucr\u0103ri costisitoare, dar necesare pentru cei care vor s\u0103 construiasc\u0103 pensiuni, case de vacan\u021b\u0103 sau alte unit\u0103\u021bi turistice<\/em><\/strong>\u201d, a declarat primarul Gabriel N\u0103st\u0103sescu.<\/p>\n<p><strong><u>Pentru investitori, utilit\u0103\u021bile reprezint\u0103 primul lucru de care au nevoie. Curentul electric, apa, canalizarea \u0219i drumurile stau la baza oric\u0103rui proiect care poate aduce turi\u0219ti \u0219i locuri de munc\u0103<\/u><\/strong>.<\/p>\n<p>\u00a0<\/p>\n<p>\u00a0<\/p>\n<p>\u00a0<\/p>\n<p>\u00a0<\/p>\n<p>\u00a0<\/p>\n<p>\u00a0<\/p>\n<\/div>\n<div class=\"news-content editor-content-entry\">\n<p>La Voineasa se lucreaz\u0103 pe mai multe \u0219antiere \u00een acela\u0219i timp. Unele investi\u021bii sunt deja \u00een execu\u021bie, altele se afl\u0103 \u00een faza de avize sau de preg\u0103tire. Problema cea mai mare nu este lipsa proiectelor, ci sumele pe care administra\u021bia local\u0103 trebuie s\u0103 le asigure din bugetul propriu pentru cofinan\u021b\u0103ri.<\/p>\n<p>\u00cen aceast\u0103 perioad\u0103, printr-un proiect finan\u021bat \u00a0prin ADR Sud-Vest Oltenia, sediul Prim\u0103riei trece printr-un amplu proces de modernizare. Acoperi\u0219ul este ref\u0103cut, fa\u021bada cl\u0103dirii este renovat\u0103, sunt montate panouri fotovoltaice, au fost instalate aparate de aer condi\u021bionat, iar urm\u0103toarea etap\u0103 presupune montarea repartitoarelor pentru \u00eenc\u0103lzire.<\/p>\n<p>\u00cen apropierea prim\u0103riei se desf\u0103\u0219oar\u0103 lucr\u0103ri \u0219i prin Programul \u201eAnghel Saligny\u201d. Se asfalteaz\u0103 strada aflat\u0103 l\u00e2ng\u0103 institu\u021bie, se amenajeaz\u0103 rigola pentru scurgerea apelor, iar zona va beneficia \u0219i de o parcare modernizat\u0103.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-57415\" src=\"https:\/\/www.impactreal.ro\/wp-content\/uploads\/2026\/06\/voineasa-primaria-300x225.jpeg\" alt width=\"300\" height=\"225\"><\/p>\n<p><strong><u>Planuri pentru c\u0103minul cultural<\/u><\/strong><\/p>\n<p>Un alt obiectiv aflat pe lista administra\u021biei locale este c\u0103minul cultural. Lucr\u0103rile depind \u00eens\u0103 de posibilit\u0103\u021bile financiare ale localit\u0103\u021bii.<\/p>\n<p>Bugetul actual nu permite investi\u021bii ample din surse proprii, astfel c\u0103 lucr\u0103rile vor fi realizate \u00een func\u021bie de fondurile disponibile.<\/p>\n<p><strong><u>Re\u021belele electrice, o investi\u021bie esen\u021bial\u0103<\/u><\/strong><\/p>\n<p>Una dintre cele mai costisitoare investi\u021bii este extinderea re\u021belelor electrice \u00een mai multe zone ale localit\u0103\u021bii.<\/p>\n<p><u>Prim\u0103ria are bloca\u021bi aproximativ 450.000 de lei pentru astfel de lucr\u0103ri \u0219i a solicitat sprijin financiar inclusiv din partea Consiliului Jude\u021bean V\u00e2lcea<\/u>.<\/p>\n<p>Necesitatea acestor investi\u021bii este legat\u0103 direct de dezvoltarea turistic\u0103 a localit\u0103\u021bii. Exist\u0103 zone unde au fost construite case de vacan\u021b\u0103, pensiuni sau alte obiective turistice, \u00eens\u0103 lipsa energiei electrice \u00eempiedic\u0103 folosirea lor la adev\u0103ratul poten\u021bial.<\/p>\n<p>Prima investi\u021bie important\u0103 vizeaz\u0103 zona Voine\u0219i\u021ba. \u00a0Aici este preg\u0103tit\u0103 o extindere de re\u021bea de medie tensiune pe o lungime de aproximativ 2,2 kilometri \u0219i o re\u021bea de joas\u0103 tensiune de peste un kilometru. Cofinan\u021barea necesar\u0103 dep\u0103\u0219e\u0219te 1,4 milioane de lei.<\/p>\n<p>Lucr\u0103rile sunt deja pornite, \u00eens\u0103 efortul financiar r\u0103m\u00e2ne foarte mare pentru bugetul local.<\/p>\n<p>Proiecte similare sunt preg\u0103tite \u0219i \u00een zona Lotru-Axial, c\u0103tre Gura Dobrunului, la Ob\u00e2r\u0219ia Lotrului, pe strada Leurda \u0219i \u00een zona M\u0103n\u0103ileasa.<\/p>\n<p>La final, toate aceste investi\u021bii \u00eensumeaz\u0103 peste zece kilometri de extinderi de re\u021bele electrice.<\/p>\n<p>\u00a0<\/p>\n<p><strong><u>Un hotel construit de ani de zile a\u0219teapt\u0103 \u00eenc\u0103 energia electric\u0103<\/u><\/strong><\/p>\n<p>Situa\u021bia din Voine\u0219i\u021ba arat\u0103 c\u00e2t de important\u0103 este aceast\u0103 investi\u021bie.<\/p>\n<p>Acolo exist\u0103 un hotel construit de c\u00e2\u021biva ani \u0219i care nu poate func\u021biona normal din cauza lipsei aliment\u0103rii cu energie electric\u0103.<\/p>\n<p>Drumul a fost asfaltat, iar administra\u021bia local\u0103 \u00ee\u0219i propune s\u0103 duc\u0103 \u00een zon\u0103 \u0219i re\u021beaua electric\u0103, urmat\u0103 de extinderea sistemului de canalizare.<\/p>\n<p>\u201d<strong><em>Pentru cei care vor s\u0103 investeasc\u0103 \u00een pensiuni, case de vacan\u021b\u0103 sau alte unit\u0103\u021bi turistice, existen\u021ba utilit\u0103\u021bilor reprezint\u0103 condi\u021bia de baz\u0103 pentru dezvoltare<\/em><\/strong>\u201d a precizat primarul.<\/p>\n<p><strong><u>Canalizarea se apropie de final<\/u><\/strong><\/p>\n<p>\u00cen prezent, sistemul de canalizare acoper\u0103 peste 90% din localitate.<\/p>\n<p>Au r\u0103mas c\u00e2teva zone care nu beneficiaz\u0103 \u00eenc\u0103 de acest serviciu. Pentru acestea sunt preg\u0103tite studii de fezabilitate \u0219i documenta\u021biile necesare.<\/p>\n<p>Lucr\u0103rile nu presupun distan\u021be mari, \u00eens\u0103 procedurile administrative necesit\u0103 numeroase avize \u0219i aprob\u0103ri.<\/p>\n<p>Voineasa este inclus\u0103 \u0219i \u00een Master Planul jude\u021bean pentru ap\u0103 \u0219i canalizare, proiect coordonat de ADI Ap\u0103 V\u00e2lcea \u0219i Apavil, finan\u021bat prin Programul Dezvoltare Durabil\u0103. Urm\u0103toarea etap\u0103 este organizarea licita\u021biei de c\u0103tre operatorul regional.<\/p>\n<p>\u00a0<\/p>\n<p><strong><u>Speran\u021be pentru Ob\u00e2r\u0219ia Lotrului<\/u><\/strong><\/p>\n<p>Un alt proiect important prive\u0219te extinderea re\u021belelor de ap\u0103 \u0219i canalizare la Ob\u00e2r\u0219ia Lotrului.<\/p>\n<p>Documenta\u021bia se afl\u0103 \u00een faza de ob\u021binere a avizelor, iar administra\u021bia local\u0103 a\u0219teapt\u0103 confirmarea finan\u021b\u0103rii.<\/p>\n<p>Experien\u021bele anterioare \u00eei fac pe reprezentan\u021bii prim\u0103riei s\u0103 priveasc\u0103 lucrurile cu pruden\u021b\u0103. Au existat situa\u021bii \u00een care proiectele au fost declarate eligibile, dar nu au mai primit finan\u021bare din cauza epuiz\u0103rii fondurilor disponibile.<\/p>\n<p><strong><u>Gabriel N\u0103st\u0103sescu: \u201eTrebuie s\u0103 ducem utilit\u0103\u021bile acolo unde exist\u0103 cerere pentru investi\u021bii\u201d<\/u><\/strong><\/p>\n<p>Primarul Gabriel N\u0103st\u0103sescu spune c\u0103 extinderea utilit\u0103\u021bilor reprezint\u0103 una dintre cele mai importante direc\u021bii pentru dezvoltarea localit\u0103\u021bii: \u201e<strong><em>Avem zone cu un poten\u021bial turistic foarte mare \u0219i trebuie s\u0103 ducem utilit\u0103\u021bile acolo unde exist\u0103 cerere pentru investi\u021bii. Vorbim despre energie electric\u0103, ap\u0103, canalizare \u0219i drumuri. Sunt lucr\u0103ri costisitoare, dar necesare pentru cei care vor s\u0103 construiasc\u0103 pensiuni, case de vacan\u021b\u0103 sau alte unit\u0103\u021bi turistice<\/em><\/strong>\u201d, a declarat primarul Gabriel N\u0103st\u0103sescu.<\/p>\n<p><strong><u>Pentru investitori, utilit\u0103\u021bile reprezint\u0103 primul lucru de care au nevoie. Curentul electric, apa, canalizarea \u0219i drumurile stau la baza oric\u0103rui proiect care poate aduce turi\u0219ti \u0219i locuri de munc\u0103<\/u><\/strong>.<\/p>\n<p>\u00a0<\/p>\n<p>\u00a0<\/p>\n<p>\u00a0<\/p>\n<p>\u00a0<\/p>\n<p>\u00a0<\/p>\n<p>\u00a0<\/p>\n<\/div>\n<p>[analyse_source url=&#8221;https:\/\/www.impactreal.ro\/2026\/06\/19\/primaria-voineasa-intinde-retele-electrice-pe-kilometri-intregi-pentru-a-deschide-drumul-noilor-investitii-in-turism\/&#8221;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/www.impactreal.ro\/wp-content\/uploads\/2019\/09\/VOINEASA-primar-GABRIEL-NASTASESCU.jpg&#8221;] 19 iunie 2026Claudia SchiopuAdministra\u0163ieVoineasa La Voineasa se lucreaz\u0103 pe mai multe \u0219antiere \u00een acela\u0219i timp. Unele investi\u021bii sunt deja \u00een execu\u021bie, altele se afl\u0103 \u00een faza de avize sau de preg\u0103tire. Problema cea mai mare nu este lipsa proiectelor, ci sumele pe care administra\u021bia local\u0103 trebuie s\u0103 le asigure din bugetul propriu [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[226,212],"class_list":["post-2002075","post","type-post","status-publish","format-standard","hentry","category-romania","tag-crawlmanager","tag-impactreal-ro"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2002075","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2002075"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/2002075\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2002075"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2002075"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2002075"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}