{"id":1998851,"date":"2026-06-18T06:00:28","date_gmt":"2026-06-18T03:00:28","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=1998851"},"modified":"2026-06-18T06:00:28","modified_gmt":"2026-06-18T03:00:28","slug":"aquaserv-scoate-artileria-grea-pe-corneliu-gavrilov-si-babadag-primaria-tulcea-pregatita-sa-inceapa","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=1998851","title":{"rendered":"Aquaserv scoate artileria grea pe Corneliu Gavrilov \u015fi Babadag. Prim\u0103ria Tulcea, preg\u0103tit\u0103 s\u0103 \u00eenceap\u0103"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/ziaruldelta.ro\/wp-content\/uploads\/2026\/06\/Aquaserv-1.jpg&#8221;]<\/p>\n<article id=\"post-37092\" class=\"module single-post-module post-37092 post type-post status-publish format-standard has-post-thumbnail hentry category-stirea-zilei et-has-post-format-content et_post_format-et-post-format-standard\">\n<div class=\"post-header\">\n<h1 class=\"entry-title\">Aquaserv scoate artileria grea pe Corneliu Gavrilov \u015fi Babadag. Prim\u0103ria Tulcea, preg\u0103tit\u0103 s\u0103 \u00eenceap\u0103 asfaltarea pe Babadag<\/h1>\n<div class=\"post-meta vcard\">\n<p>Posted by <a href=\"https:\/\/ziaruldelta.ro\/author\/nicoleta-urmuz\/\" class=\"url fn\" title=\"Posts by Nicoleta URMUZ\" rel=\"author\">Nicoleta URMUZ<\/a> | <span class=\"updated\">Jun 18, 2026<\/span> | <a href=\"https:\/\/ziaruldelta.ro\/category\/stirea-zilei\/\" rel=\"tag\">Stirea Zilei<\/a> | <\/p>\n<\/div>\n<\/div>\n<div class=\"post-thumbnail header\"><img decoding=\"async\" src=\"https:\/\/ziaruldelta.ro\/wp-content\/uploads\/2026\/06\/Aquaserv-1.jpg\" alt=\"Aquaserv scoate artileria grea pe Corneliu Gavrilov \u015fi Babadag. Prim\u0103ria Tulcea, preg\u0103tit\u0103 s\u0103 \u00eenceap\u0103 asfaltarea pe Babadag\"><\/div>\n<div class=\"post-wrap\">\n<div class=\"post-content entry-content\">\n<p>Odat\u0103 cu semnarea contractului de finan\u0163are de 150 milioane de euro \u00eentre operatorul regional de ap\u0103 \u015fi canalizare \u015fi Ministerul Fondurilor Europene, disensiunile dintre Prim\u0103ria Municipiului Tulcea \u015fi Aquaserv par s\u0103 se fi stins. Primarul \u015etefan Ilie a anun\u0163at c\u0103 operatorul regional de ap\u0103 \u015fi canalizare a prezentat administra\u0163iei locale un calendar al interven\u0163iilor care vor permite reluarea \u015fi finalizarea unor lucr\u0103ri a\u015fteptate de mult timp de tulceni.<\/p>\n<p>Edilul a explicat c\u0103 pe str\u0103zile Corneliu Gavrilov \u015fi Babadag administra\u0163ia local\u0103 nu poate interveni cu asfaltare p\u00e2n\u0103 la finalizarea lucr\u0103rilor de reabilitare a re\u0163elelor de ap\u0103 \u015fi canalizare realizate de Aquaserv, subliniind c\u0103 orice alt\u0103 solu\u0163ie ar fi \u00eensemnat \u201elucr\u0103ri de m\u00e2ntuial\u0103\u201d. Dup\u0103 ce municipalitatea a transmis mai multe avertismente societ\u0103\u0163ii \u015fi a cerut clarific\u0103ri privind continuarea investi\u0163iei europene, Aquaserv a informat Prim\u0103ria c\u0103 a semnat contractul de finan\u0163are cu Ministerul Fondurilor Europene \u015fi c\u0103 va mobiliza \u00een perioada urm\u0103toare patru echipe de lucru pe strada Corneliu Gavrilov. Totodat\u0103, va fi finalizat\u0103 \u015fi por\u0163iunea r\u0103mas\u0103 pe strada Babadag, astfel \u00eenc\u00e2t Prim\u0103ria s\u0103 poat\u0103 \u00eencepe asfaltarea de la intrarea \u00een municipiu dinspre Constan\u0163a p\u00e2n\u0103 \u00een zona Teatrului \u201eJean Bart\u201d.<\/p>\n<blockquote>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-37094 alignleft\" src=\"https:\/\/ziaruldelta.ro\/wp-content\/uploads\/2026\/06\/Stefan-Ilie-1.jpg\" alt width=\"354\" height=\"540\">\u201ePe str\u0103zile Corneliu Gavrilov \u015fi Babadag, mai multe institu\u0163ii au ob\u0163inut finan\u0163\u0103ri pentru diferite utilit\u0103\u0163i. Acolo, de exemplu, trebuie s\u0103 finaliz\u0103m \u00eenainte de toate investi\u0163ia Aquaserv, de reabilitare a instala\u0163iilor de canalizare \u015fi de alimentare cu ap\u0103 pluvial\u0103, lucr\u0103ri care sunt grevate de ni\u015fte sarcini, pentru c\u0103 au intervenit ni\u015fte probleme cu aceste investi\u0163ii pe care le face Aquaserv. \u00cen aceste condi\u0163ii, lucr\u0103rile, a\u015fa dup\u0103 cum a\u0163i v\u0103zut, s-au sistat, iar noi, Prim\u0103ria, st\u0103m cu banii \u00een cont, dar nu putem s\u0103 asfalt\u0103m peste lucr\u0103rile Aquaserv neexecutate. Puteam s\u0103 fac acest lucru, dar f\u0103ceam lucr\u0103ri de m\u00e2ntuial\u0103. Interesul meu \u015fi al administra\u0163iei pe care o conduc nu este acesta. Trebuie s\u0103 \u015fti\u0163i c\u0103 pentru aceste str\u0103zi, care dor, cum sunt Corneliu Gavrilov sau Babadag, am discutat cu Aquaservul \u015fi a\u0163i v\u0103zut c\u0103 am dat ni\u015fte ultimatumuri c\u0103tre aceast\u0103 societate, p\u00e2n\u0103 la a le spune c\u0103 vom ie\u015fi din acest sistem pentru a ne administra singuri, poate mai eficient dec\u00e2t o fac ei. Le-am dat un termen p\u00e2n\u0103 pe 15 iunie pentru a ne prezenta modul \u00een care duc mai departe investi\u0163ia european\u0103 \u015fi ne-au transmis c\u0103 au semnat contractul de finan\u0163are cu Ministerul Fondurilor Europene. Ne vor da un grafic de lucr\u0103ri \u00een perioada urm\u0103toare. \u00cen timp de dou\u0103 s\u0103pt\u0103m\u00e2ni ne-au transmis c\u0103 vor aduce patru echipe ale firmei care fac lucr\u0103rile lor \u015fi vor intra pe Corneliu Gavrilov. Vor finaliza o por\u0163iune pe care o mai au pe Babadag, ca noi s\u0103 putem asfalta de la intrarea \u00een ora\u015f dinspre Constan\u0163a p\u00e2n\u0103 \u00een zona Teatrului Jean Bart\u201d, a declarat primarul municipiului Tulcea, \u015etefan Ilie.<\/p>\n<\/blockquote>\n<p>\u00cen paralel, primarul a verificat \u015fi stadiul lucr\u0103rilor de pe Aleea Cristina, una dintre str\u0103zile unde investi\u0163ia este realizat\u0103 exclusiv de municipalitate \u015fi unde ritmul de execu\u0163ie este considerabil mai rapid.<\/p>\n<blockquote>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-37095 aligncenter\" src=\"https:\/\/ziaruldelta.ro\/wp-content\/uploads\/2026\/06\/Aleea-Cristina.jpg\" alt width=\"600\" height=\"331\">\u201ePe Aleea Cristina se pune stratul de binder \u015fi cre\u0103m o structur\u0103 frumoas\u0103 pentru to\u0163i locuitorii din aceast\u0103 zon\u0103. Urmeaz\u0103 stratul de uzur\u0103 \u015fi c\u0103minele ridicate la cote, \u00een a\u015fa fel \u00eenc\u00e2t s\u0103 elimin\u0103m disconfortul, apoi trotuarele. \u015ei avem o strad\u0103 nou\u0103. Undeva mai jos am avut o avarie \u015fi se cuno\u015ftea c\u0103 era de mult timp acolo. Problema s-a remediat \u00eentre timp, dar ne-a blocat pu\u0163in. Spre deosebire de aceste dou\u0103 str\u0103zi, unde mai multe institu\u0163ii au de f\u0103cut lucr\u0103ri, aici am fost numai noi, de la Prim\u0103rie. Din acest motiv am fost \u00een martie, c\u00e2nd am decopertat. Acum suntem la \u00eenceputul lui iunie \u015fi asfalt\u0103m. Acesta este un timp de lucru rezonabil pe care ni l-am dori cu to\u0163ii pentru fiecare strad\u0103. Doar c\u0103 nu de fiecare dat\u0103 se \u00eent\u00e2mpl\u0103 astfel. \u015ei nu din vina noastr\u0103\u201d, a men\u0163ionat edilul.<\/p>\n<\/blockquote>\n<p>Masterplanul de dezvoltare a re\u0163elelor de ap\u0103 \u015fi canalizare din jude\u0163ul Tulcea, proiect ini\u0163iat de Asocia\u0163ia de Dezvoltare Durabil\u0103 a Serviciilor de Ap\u0103 \u015fi Canalizare, a fost finan\u0163at prin Programul Opera\u0163ional Sectorial Mediu 2007 \u2013 2013 \u015fi a avut o valoare ini\u0163ial\u0103 de 419.371.852 lei, f\u0103r\u0103 TVA. Proiectul al c\u0103rui contract de realizare a fost semnat \u00een anul 2008 a fost sus\u0163inut \u00een propor\u0163ie de 85% din Fondul de Coeziune, \u00een propor\u0163ie de 13% din bugetul Guvernului, iar \u00een propor\u0163ie de 2% din bugetul local.<\/p>\n<p>Scopul proiectului considerat de autorit\u0103\u0163i drept unul dintre cele mai importante din Rom\u00e2nia din punct de vedere financiar pentru exerci\u0163iul 2007 \u2013 2013 a fost \u00eembun\u0103t\u0103\u0163irea infrastructurii de ap\u0103 \u015fi ap\u0103 uzat\u0103, de acest proiect beneficiind 106.000 locuitori ai ora\u015felor Isaccea, M\u0103cin \u015fi Sulina, precum \u015fi locuitorii municipiului Tulcea.<\/p>\n<p>Lucr\u0103rile au fost fazate \u00een exerci\u0163iul financiar urm\u0103tor, atunci c\u00e2nd au \u00eenceput demersurile pentru etapa a doua.<\/p>\n<p>Proiectul regional de dezvoltare a re\u0163elelor de ap\u0103 \u015fi canalizare din jude\u0163ul Tulcea, derulat \u00een acest exerci\u0163iu financiar, presupune finan\u0163\u0103ri etapizate pentru reabilitarea \u015fi extinderea re\u0163elelor de ap\u0103 \u015fi canalizare din 19 localit\u0103\u0163i din jude\u0163 prin Programul Opera\u0163ional Infrastructur\u0103 Mare (POIM) \u015fi Programul Opera\u0163ional Dezvoltare Durabil\u0103 (PODD).<\/p>\n<p>Contractul de finan\u0163are pentru acest proiect a fost semnat \u00een luna octombrie a anului 2022 de ministrul Investi\u0163iilor \u015fi Proiectelor Europene, Marcel Bolo\u015f, \u015fi pre\u015fedintele Asocia\u0163iei de dezvoltare intercomunitar\u0103 a infrastructurii de ap\u0103 \u015fi canalizare din jude\u0163, Anastase Moraru, \u015fi viza 14 unit\u0103\u0163i administrativ-teritoriale din jude\u0163.<\/p>\n<p>Valoarea total\u0103 estimat\u0103 a acestui proiect \u00een urm\u0103 cu aproape trei ani a fost de 222.115.490 euro f\u0103r\u0103 TVA, din care pentru sistemul de alimentare cu ap\u0103 114.508.514 euro \u015fi pentru sistemul de canalizare 107.606.976 euro.<\/p>\n<\/div>\n<\/div>\n<div class=\"post-footer\">\n<div class=\"social-icons ed-social-share-icons\">\n<p class=\"share-title\">Share:<\/p>\n<\/div>\n<div class=\"rating-stars\">\n<p id=\"rate-title\" class=\"rate-title\">Rate:<\/p>\n<\/div>\n<\/div>\n<\/article>\n<div class=\"post-content entry-content\">\n<p>Odat\u0103 cu semnarea contractului de finan\u0163are de 150 milioane de euro \u00eentre operatorul regional de ap\u0103 \u015fi canalizare \u015fi Ministerul Fondurilor Europene, disensiunile dintre Prim\u0103ria Municipiului Tulcea \u015fi Aquaserv par s\u0103 se fi stins. Primarul \u015etefan Ilie a anun\u0163at c\u0103 operatorul regional de ap\u0103 \u015fi canalizare a prezentat administra\u0163iei locale un calendar al interven\u0163iilor care vor permite reluarea \u015fi finalizarea unor lucr\u0103ri a\u015fteptate de mult timp de tulceni.<\/p>\n<p>Edilul a explicat c\u0103 pe str\u0103zile Corneliu Gavrilov \u015fi Babadag administra\u0163ia local\u0103 nu poate interveni cu asfaltare p\u00e2n\u0103 la finalizarea lucr\u0103rilor de reabilitare a re\u0163elelor de ap\u0103 \u015fi canalizare realizate de Aquaserv, subliniind c\u0103 orice alt\u0103 solu\u0163ie ar fi \u00eensemnat \u201elucr\u0103ri de m\u00e2ntuial\u0103\u201d. Dup\u0103 ce municipalitatea a transmis mai multe avertismente societ\u0103\u0163ii \u015fi a cerut clarific\u0103ri privind continuarea investi\u0163iei europene, Aquaserv a informat Prim\u0103ria c\u0103 a semnat contractul de finan\u0163are cu Ministerul Fondurilor Europene \u015fi c\u0103 va mobiliza \u00een perioada urm\u0103toare patru echipe de lucru pe strada Corneliu Gavrilov. Totodat\u0103, va fi finalizat\u0103 \u015fi por\u0163iunea r\u0103mas\u0103 pe strada Babadag, astfel \u00eenc\u00e2t Prim\u0103ria s\u0103 poat\u0103 \u00eencepe asfaltarea de la intrarea \u00een municipiu dinspre Constan\u0163a p\u00e2n\u0103 \u00een zona Teatrului \u201eJean Bart\u201d.<\/p>\n<blockquote>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-37094 alignleft\" src=\"https:\/\/ziaruldelta.ro\/wp-content\/uploads\/2026\/06\/Stefan-Ilie-1.jpg\" alt width=\"354\" height=\"540\">\u201ePe str\u0103zile Corneliu Gavrilov \u015fi Babadag, mai multe institu\u0163ii au ob\u0163inut finan\u0163\u0103ri pentru diferite utilit\u0103\u0163i. Acolo, de exemplu, trebuie s\u0103 finaliz\u0103m \u00eenainte de toate investi\u0163ia Aquaserv, de reabilitare a instala\u0163iilor de canalizare \u015fi de alimentare cu ap\u0103 pluvial\u0103, lucr\u0103ri care sunt grevate de ni\u015fte sarcini, pentru c\u0103 au intervenit ni\u015fte probleme cu aceste investi\u0163ii pe care le face Aquaserv. \u00cen aceste condi\u0163ii, lucr\u0103rile, a\u015fa dup\u0103 cum a\u0163i v\u0103zut, s-au sistat, iar noi, Prim\u0103ria, st\u0103m cu banii \u00een cont, dar nu putem s\u0103 asfalt\u0103m peste lucr\u0103rile Aquaserv neexecutate. Puteam s\u0103 fac acest lucru, dar f\u0103ceam lucr\u0103ri de m\u00e2ntuial\u0103. Interesul meu \u015fi al administra\u0163iei pe care o conduc nu este acesta. Trebuie s\u0103 \u015fti\u0163i c\u0103 pentru aceste str\u0103zi, care dor, cum sunt Corneliu Gavrilov sau Babadag, am discutat cu Aquaservul \u015fi a\u0163i v\u0103zut c\u0103 am dat ni\u015fte ultimatumuri c\u0103tre aceast\u0103 societate, p\u00e2n\u0103 la a le spune c\u0103 vom ie\u015fi din acest sistem pentru a ne administra singuri, poate mai eficient dec\u00e2t o fac ei. Le-am dat un termen p\u00e2n\u0103 pe 15 iunie pentru a ne prezenta modul \u00een care duc mai departe investi\u0163ia european\u0103 \u015fi ne-au transmis c\u0103 au semnat contractul de finan\u0163are cu Ministerul Fondurilor Europene. Ne vor da un grafic de lucr\u0103ri \u00een perioada urm\u0103toare. \u00cen timp de dou\u0103 s\u0103pt\u0103m\u00e2ni ne-au transmis c\u0103 vor aduce patru echipe ale firmei care fac lucr\u0103rile lor \u015fi vor intra pe Corneliu Gavrilov. Vor finaliza o por\u0163iune pe care o mai au pe Babadag, ca noi s\u0103 putem asfalta de la intrarea \u00een ora\u015f dinspre Constan\u0163a p\u00e2n\u0103 \u00een zona Teatrului Jean Bart\u201d, a declarat primarul municipiului Tulcea, \u015etefan Ilie.<\/p>\n<\/blockquote>\n<p>\u00cen paralel, primarul a verificat \u015fi stadiul lucr\u0103rilor de pe Aleea Cristina, una dintre str\u0103zile unde investi\u0163ia este realizat\u0103 exclusiv de municipalitate \u015fi unde ritmul de execu\u0163ie este considerabil mai rapid.<\/p>\n<blockquote>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-37095 aligncenter\" src=\"https:\/\/ziaruldelta.ro\/wp-content\/uploads\/2026\/06\/Aleea-Cristina.jpg\" alt width=\"600\" height=\"331\">\u201ePe Aleea Cristina se pune stratul de binder \u015fi cre\u0103m o structur\u0103 frumoas\u0103 pentru to\u0163i locuitorii din aceast\u0103 zon\u0103. Urmeaz\u0103 stratul de uzur\u0103 \u015fi c\u0103minele ridicate la cote, \u00een a\u015fa fel \u00eenc\u00e2t s\u0103 elimin\u0103m disconfortul, apoi trotuarele. \u015ei avem o strad\u0103 nou\u0103. Undeva mai jos am avut o avarie \u015fi se cuno\u015ftea c\u0103 era de mult timp acolo. Problema s-a remediat \u00eentre timp, dar ne-a blocat pu\u0163in. Spre deosebire de aceste dou\u0103 str\u0103zi, unde mai multe institu\u0163ii au de f\u0103cut lucr\u0103ri, aici am fost numai noi, de la Prim\u0103rie. Din acest motiv am fost \u00een martie, c\u00e2nd am decopertat. Acum suntem la \u00eenceputul lui iunie \u015fi asfalt\u0103m. Acesta este un timp de lucru rezonabil pe care ni l-am dori cu to\u0163ii pentru fiecare strad\u0103. Doar c\u0103 nu de fiecare dat\u0103 se \u00eent\u00e2mpl\u0103 astfel. \u015ei nu din vina noastr\u0103\u201d, a men\u0163ionat edilul.<\/p>\n<\/blockquote>\n<p>Masterplanul de dezvoltare a re\u0163elelor de ap\u0103 \u015fi canalizare din jude\u0163ul Tulcea, proiect ini\u0163iat de Asocia\u0163ia de Dezvoltare Durabil\u0103 a Serviciilor de Ap\u0103 \u015fi Canalizare, a fost finan\u0163at prin Programul Opera\u0163ional Sectorial Mediu 2007 \u2013 2013 \u015fi a avut o valoare ini\u0163ial\u0103 de 419.371.852 lei, f\u0103r\u0103 TVA. Proiectul al c\u0103rui contract de realizare a fost semnat \u00een anul 2008 a fost sus\u0163inut \u00een propor\u0163ie de 85% din Fondul de Coeziune, \u00een propor\u0163ie de 13% din bugetul Guvernului, iar \u00een propor\u0163ie de 2% din bugetul local.<\/p>\n<p>Scopul proiectului considerat de autorit\u0103\u0163i drept unul dintre cele mai importante din Rom\u00e2nia din punct de vedere financiar pentru exerci\u0163iul 2007 \u2013 2013 a fost \u00eembun\u0103t\u0103\u0163irea infrastructurii de ap\u0103 \u015fi ap\u0103 uzat\u0103, de acest proiect beneficiind 106.000 locuitori ai ora\u015felor Isaccea, M\u0103cin \u015fi Sulina, precum \u015fi locuitorii municipiului Tulcea.<\/p>\n<p>Lucr\u0103rile au fost fazate \u00een exerci\u0163iul financiar urm\u0103tor, atunci c\u00e2nd au \u00eenceput demersurile pentru etapa a doua.<\/p>\n<p>Proiectul regional de dezvoltare a re\u0163elelor de ap\u0103 \u015fi canalizare din jude\u0163ul Tulcea, derulat \u00een acest exerci\u0163iu financiar, presupune finan\u0163\u0103ri etapizate pentru reabilitarea \u015fi extinderea re\u0163elelor de ap\u0103 \u015fi canalizare din 19 localit\u0103\u0163i din jude\u0163 prin Programul Opera\u0163ional Infrastructur\u0103 Mare (POIM) \u015fi Programul Opera\u0163ional Dezvoltare Durabil\u0103 (PODD).<\/p>\n<p>Contractul de finan\u0163are pentru acest proiect a fost semnat \u00een luna octombrie a anului 2022 de ministrul Investi\u0163iilor \u015fi Proiectelor Europene, Marcel Bolo\u015f, \u015fi pre\u015fedintele Asocia\u0163iei de dezvoltare intercomunitar\u0103 a infrastructurii de ap\u0103 \u015fi canalizare din jude\u0163, Anastase Moraru, \u015fi viza 14 unit\u0103\u0163i administrativ-teritoriale din jude\u0163.<\/p>\n<p>Valoarea total\u0103 estimat\u0103 a acestui proiect \u00een urm\u0103 cu aproape trei ani a fost de 222.115.490 euro f\u0103r\u0103 TVA, din care pentru sistemul de alimentare cu ap\u0103 114.508.514 euro \u015fi pentru sistemul de canalizare 107.606.976 euro.<\/p>\n<\/div>\n<div class=\"post-content entry-content\">\n<p>Odat\u0103 cu semnarea contractului de finan\u0163are de 150 milioane de euro \u00eentre operatorul regional de ap\u0103 \u015fi canalizare \u015fi Ministerul Fondurilor Europene, disensiunile dintre Prim\u0103ria Municipiului Tulcea \u015fi Aquaserv par s\u0103 se fi stins. Primarul \u015etefan Ilie a anun\u0163at c\u0103 operatorul regional de ap\u0103 \u015fi canalizare a prezentat administra\u0163iei locale un calendar al interven\u0163iilor care vor permite reluarea \u015fi finalizarea unor lucr\u0103ri a\u015fteptate de mult timp de tulceni.<\/p>\n<p>Edilul a explicat c\u0103 pe str\u0103zile Corneliu Gavrilov \u015fi Babadag administra\u0163ia local\u0103 nu poate interveni cu asfaltare p\u00e2n\u0103 la finalizarea lucr\u0103rilor de reabilitare a re\u0163elelor de ap\u0103 \u015fi canalizare realizate de Aquaserv, subliniind c\u0103 orice alt\u0103 solu\u0163ie ar fi \u00eensemnat \u201elucr\u0103ri de m\u00e2ntuial\u0103\u201d. Dup\u0103 ce municipalitatea a transmis mai multe avertismente societ\u0103\u0163ii \u015fi a cerut clarific\u0103ri privind continuarea investi\u0163iei europene, Aquaserv a informat Prim\u0103ria c\u0103 a semnat contractul de finan\u0163are cu Ministerul Fondurilor Europene \u015fi c\u0103 va mobiliza \u00een perioada urm\u0103toare patru echipe de lucru pe strada Corneliu Gavrilov. Totodat\u0103, va fi finalizat\u0103 \u015fi por\u0163iunea r\u0103mas\u0103 pe strada Babadag, astfel \u00eenc\u00e2t Prim\u0103ria s\u0103 poat\u0103 \u00eencepe asfaltarea de la intrarea \u00een municipiu dinspre Constan\u0163a p\u00e2n\u0103 \u00een zona Teatrului \u201eJean Bart\u201d.<\/p>\n<blockquote>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-37094 alignleft\" src=\"https:\/\/ziaruldelta.ro\/wp-content\/uploads\/2026\/06\/Stefan-Ilie-1.jpg\" alt width=\"354\" height=\"540\">\u201ePe str\u0103zile Corneliu Gavrilov \u015fi Babadag, mai multe institu\u0163ii au ob\u0163inut finan\u0163\u0103ri pentru diferite utilit\u0103\u0163i. Acolo, de exemplu, trebuie s\u0103 finaliz\u0103m \u00eenainte de toate investi\u0163ia Aquaserv, de reabilitare a instala\u0163iilor de canalizare \u015fi de alimentare cu ap\u0103 pluvial\u0103, lucr\u0103ri care sunt grevate de ni\u015fte sarcini, pentru c\u0103 au intervenit ni\u015fte probleme cu aceste investi\u0163ii pe care le face Aquaserv. \u00cen aceste condi\u0163ii, lucr\u0103rile, a\u015fa dup\u0103 cum a\u0163i v\u0103zut, s-au sistat, iar noi, Prim\u0103ria, st\u0103m cu banii \u00een cont, dar nu putem s\u0103 asfalt\u0103m peste lucr\u0103rile Aquaserv neexecutate. Puteam s\u0103 fac acest lucru, dar f\u0103ceam lucr\u0103ri de m\u00e2ntuial\u0103. Interesul meu \u015fi al administra\u0163iei pe care o conduc nu este acesta. Trebuie s\u0103 \u015fti\u0163i c\u0103 pentru aceste str\u0103zi, care dor, cum sunt Corneliu Gavrilov sau Babadag, am discutat cu Aquaservul \u015fi a\u0163i v\u0103zut c\u0103 am dat ni\u015fte ultimatumuri c\u0103tre aceast\u0103 societate, p\u00e2n\u0103 la a le spune c\u0103 vom ie\u015fi din acest sistem pentru a ne administra singuri, poate mai eficient dec\u00e2t o fac ei. Le-am dat un termen p\u00e2n\u0103 pe 15 iunie pentru a ne prezenta modul \u00een care duc mai departe investi\u0163ia european\u0103 \u015fi ne-au transmis c\u0103 au semnat contractul de finan\u0163are cu Ministerul Fondurilor Europene. Ne vor da un grafic de lucr\u0103ri \u00een perioada urm\u0103toare. \u00cen timp de dou\u0103 s\u0103pt\u0103m\u00e2ni ne-au transmis c\u0103 vor aduce patru echipe ale firmei care fac lucr\u0103rile lor \u015fi vor intra pe Corneliu Gavrilov. Vor finaliza o por\u0163iune pe care o mai au pe Babadag, ca noi s\u0103 putem asfalta de la intrarea \u00een ora\u015f dinspre Constan\u0163a p\u00e2n\u0103 \u00een zona Teatrului Jean Bart\u201d, a declarat primarul municipiului Tulcea, \u015etefan Ilie.<\/p>\n<\/blockquote>\n<p>\u00cen paralel, primarul a verificat \u015fi stadiul lucr\u0103rilor de pe Aleea Cristina, una dintre str\u0103zile unde investi\u0163ia este realizat\u0103 exclusiv de municipalitate \u015fi unde ritmul de execu\u0163ie este considerabil mai rapid.<\/p>\n<blockquote>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-37095 aligncenter\" src=\"https:\/\/ziaruldelta.ro\/wp-content\/uploads\/2026\/06\/Aleea-Cristina.jpg\" alt width=\"600\" height=\"331\">\u201ePe Aleea Cristina se pune stratul de binder \u015fi cre\u0103m o structur\u0103 frumoas\u0103 pentru to\u0163i locuitorii din aceast\u0103 zon\u0103. Urmeaz\u0103 stratul de uzur\u0103 \u015fi c\u0103minele ridicate la cote, \u00een a\u015fa fel \u00eenc\u00e2t s\u0103 elimin\u0103m disconfortul, apoi trotuarele. \u015ei avem o strad\u0103 nou\u0103. Undeva mai jos am avut o avarie \u015fi se cuno\u015ftea c\u0103 era de mult timp acolo. Problema s-a remediat \u00eentre timp, dar ne-a blocat pu\u0163in. Spre deosebire de aceste dou\u0103 str\u0103zi, unde mai multe institu\u0163ii au de f\u0103cut lucr\u0103ri, aici am fost numai noi, de la Prim\u0103rie. Din acest motiv am fost \u00een martie, c\u00e2nd am decopertat. Acum suntem la \u00eenceputul lui iunie \u015fi asfalt\u0103m. Acesta este un timp de lucru rezonabil pe care ni l-am dori cu to\u0163ii pentru fiecare strad\u0103. Doar c\u0103 nu de fiecare dat\u0103 se \u00eent\u00e2mpl\u0103 astfel. \u015ei nu din vina noastr\u0103\u201d, a men\u0163ionat edilul.<\/p>\n<\/blockquote>\n<p>Masterplanul de dezvoltare a re\u0163elelor de ap\u0103 \u015fi canalizare din jude\u0163ul Tulcea, proiect ini\u0163iat de Asocia\u0163ia de Dezvoltare Durabil\u0103 a Serviciilor de Ap\u0103 \u015fi Canalizare, a fost finan\u0163at prin Programul Opera\u0163ional Sectorial Mediu 2007 \u2013 2013 \u015fi a avut o valoare ini\u0163ial\u0103 de 419.371.852 lei, f\u0103r\u0103 TVA. Proiectul al c\u0103rui contract de realizare a fost semnat \u00een anul 2008 a fost sus\u0163inut \u00een propor\u0163ie de 85% din Fondul de Coeziune, \u00een propor\u0163ie de 13% din bugetul Guvernului, iar \u00een propor\u0163ie de 2% din bugetul local.<\/p>\n<p>Scopul proiectului considerat de autorit\u0103\u0163i drept unul dintre cele mai importante din Rom\u00e2nia din punct de vedere financiar pentru exerci\u0163iul 2007 \u2013 2013 a fost \u00eembun\u0103t\u0103\u0163irea infrastructurii de ap\u0103 \u015fi ap\u0103 uzat\u0103, de acest proiect beneficiind 106.000 locuitori ai ora\u015felor Isaccea, M\u0103cin \u015fi Sulina, precum \u015fi locuitorii municipiului Tulcea.<\/p>\n<p>Lucr\u0103rile au fost fazate \u00een exerci\u0163iul financiar urm\u0103tor, atunci c\u00e2nd au \u00eenceput demersurile pentru etapa a doua.<\/p>\n<p>Proiectul regional de dezvoltare a re\u0163elelor de ap\u0103 \u015fi canalizare din jude\u0163ul Tulcea, derulat \u00een acest exerci\u0163iu financiar, presupune finan\u0163\u0103ri etapizate pentru reabilitarea \u015fi extinderea re\u0163elelor de ap\u0103 \u015fi canalizare din 19 localit\u0103\u0163i din jude\u0163 prin Programul Opera\u0163ional Infrastructur\u0103 Mare (POIM) \u015fi Programul Opera\u0163ional Dezvoltare Durabil\u0103 (PODD).<\/p>\n<p>Contractul de finan\u0163are pentru acest proiect a fost semnat \u00een luna octombrie a anului 2022 de ministrul Investi\u0163iilor \u015fi Proiectelor Europene, Marcel Bolo\u015f, \u015fi pre\u015fedintele Asocia\u0163iei de dezvoltare intercomunitar\u0103 a infrastructurii de ap\u0103 \u015fi canalizare din jude\u0163, Anastase Moraru, \u015fi viza 14 unit\u0103\u0163i administrativ-teritoriale din jude\u0163.<\/p>\n<p>Valoarea total\u0103 estimat\u0103 a acestui proiect \u00een urm\u0103 cu aproape trei ani a fost de 222.115.490 euro f\u0103r\u0103 TVA, din care pentru sistemul de alimentare cu ap\u0103 114.508.514 euro \u015fi pentru sistemul de canalizare 107.606.976 euro.<\/p>\n<\/div>\n<p>[analyse_source url=&#8221;https:\/\/ziaruldelta.ro\/2026\/06\/18\/aquaserv-scoate-artileria-grea-pe-corneliu-gavrilov-si-babadag-primaria-tulcea-pregatita-sa-inceapa-asfaltarea-pe-babadag\/&#8221;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/ziaruldelta.ro\/wp-content\/uploads\/2026\/06\/Aquaserv-1.jpg&#8221;] Aquaserv scoate artileria grea pe Corneliu Gavrilov \u015fi Babadag. Prim\u0103ria Tulcea, preg\u0103tit\u0103 s\u0103 \u00eenceap\u0103 asfaltarea pe Babadag Posted by Nicoleta URMUZ | Jun 18, 2026 | Stirea Zilei | Odat\u0103 cu semnarea contractului de finan\u0163are de 150 milioane de euro \u00eentre operatorul regional de ap\u0103 \u015fi canalizare \u015fi Ministerul Fondurilor Europene, disensiunile [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[226,206],"class_list":["post-1998851","post","type-post","status-publish","format-standard","hentry","category-romania","tag-crawlmanager","tag-ziaruldelta-ro"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1998851","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1998851"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1998851\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1998851"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1998851"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1998851"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}