{"id":1973574,"date":"2026-06-04T10:50:46","date_gmt":"2026-06-04T07:50:46","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=1973574"},"modified":"2026-06-04T10:50:46","modified_gmt":"2026-06-04T07:50:46","slug":"patru-localitati-din-judet-beneficiare-ale-fondurilor-europene-atrase-de-aquatim","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=1973574","title":{"rendered":"Patru localit\u0103\u021bi din jude\u021b, beneficiare ale fondurilor europene atrase de Aquatim"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/www.banatulazi.ro\/wp-content\/uploads\/2025\/01\/aquatim-conducte-lucrari-dezvoltare.jpeg&#8221;]<\/p>\n<div class=\"td_block_wrap tdb_single_content tdi_64 td-pb-border-top td_block_template_1 td-post-content tagdiv-type\" data-td-block-uid=\"tdi_64\">\n<div class=\"tdb-block-inner td-fix-index\">\n<p><strong>Aquatim a finalizat de cur\u00e2nd \u00eenc\u0103 un contract de lucr\u0103ri din cadrul \u201eProiectului regional de dezvoltare a infrastructurii de ap\u0103 \u0219i ap\u0103 uzat\u0103 din jude\u021bul Timi\u0219, \u00een perioada 2014-2020 \u2013 etapa a II-a, parte a Programului Dezvoltare Durabil\u0103 (PDD). Contractul \u201eExecutie re\u0163ele de ap\u0103 \u015fi canalizare Jebel, Liebling, Ciacova, Voiteg\u201d avut o valoare final\u0103 de 33.455.142,18 lei, f\u0103r\u0103 TVA.<\/strong><\/p>\n<p>Fiecare localitate cuprins\u0103 \u00een cadrul acestuia a beneficiat de lucr\u0103ri de \u00eembun\u0103t\u0103\u021bire a sistemului de alimentare cu ap\u0103 \u0219i canalizare, dup\u0103 cum urmeaz\u0103:<br \/>\nCiacova: extinderea re\u021belei de ap\u0103 pe 8 str\u0103zi (peste 3 km conducte noi), extinderea re\u021belei de canalizare pe 3 str\u0103zi (peste 1 km conducte noi), 2 sta\u021bii de pompare a apelor uzate, o conduct\u0103 de refulare de circa 30m.<br \/>\nLiebling: extinderea re\u021belei de ap\u0103 pe 2 str\u0103zi (peste 800m conducte noi).<br \/>\nVoiteg: o gospod\u0103rie de ap\u0103 (care include rezervor de ap\u0103, sta\u021bie de clorinare, sta\u021bie de pompare), 1 c\u0103min de monitorizare, conducte de transport ap\u0103 potabil\u0103 cu o lungime de peste 12 km, o re\u021bea de distribu\u021bie de circa 400m.<br \/>\nJebel: extinderea re\u021belei de canalizare pe 45 de str\u0103zi (peste 24 km de conducte noi), 8 sta\u021bii de pompare a apelor uzate \u0219i o conduct\u0103 de refulare cu o lungime de peste 5 km.<\/p>\n<p><em>\u201eProiectul regional de dezvoltare a infrastructurii de ap\u0103 \u0219i ap\u0103 uzat\u0103 din jude\u021bul Timi\u0219, \u00een perioada 2014-2020\u201d(Etapa I + Etapa a II-a), are o valoare total\u0103 de 239,5 milioane de euro, din care 180,4 milioane de euro fonduri nerambursabile de la Uniunea European\u0103, 40,4 milioane euro de la bugetul de stat, 4,3 milioane de la bugetul local \u0219i 14,4 milioane euro co-finan\u021bare Aquatim. Obiectivul vizeaz\u0103 dezvoltarea unor sisteme durabile de alimentare cu ap\u0103 \u0219i ap\u0103 uzat\u0103 \u00een Timi\u0219oara \u0219i \u00een 81 localit\u0103\u021bi din jude\u021bul Timi\u0219.\u201d<\/em><\/p>\n<p><em>Dr. ing. Ilie Vlaicu<br \/>\nDirector General<br \/>\nAquatim SA<\/em><\/p>\n<p>Proiect cofinan\u021bat din Fondul de Coeziune prin Programul Opera\u021bional Infrastructur\u0103 Mare 2014-2020 (etapa I) \u0219i din Fondul European de Dezvoltare Regional\u0103 prin Programul Dezvoltare Durabil\u0103 2021-2027 (etapa II)<\/p>\n<\/div>\n<\/div>\n<p>[analyse_source url=&#8221;https:\/\/www.banatulazi.ro\/patru-localitati-din-judet-beneficiare-ale-fondurilor-europene-atrase-de-aquatim\/&#8221;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/www.banatulazi.ro\/wp-content\/uploads\/2025\/01\/aquatim-conducte-lucrari-dezvoltare.jpeg&#8221;] Aquatim a finalizat de cur\u00e2nd \u00eenc\u0103 un contract de lucr\u0103ri din cadrul \u201eProiectului regional de dezvoltare a infrastructurii de ap\u0103 \u0219i ap\u0103 uzat\u0103 din jude\u021bul Timi\u0219, \u00een perioada 2014-2020 \u2013 etapa a II-a, parte a Programului Dezvoltare Durabil\u0103 (PDD). Contractul \u201eExecutie re\u0163ele de ap\u0103 \u015fi canalizare Jebel, Liebling, Ciacova, Voiteg\u201d avut o [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[185,226],"class_list":["post-1973574","post","type-post","status-publish","format-standard","hentry","category-romania","tag-banatulazi-ro","tag-crawlmanager"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1973574","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1973574"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1973574\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1973574"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1973574"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1973574"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}