{"id":1968932,"date":"2026-06-01T18:33:17","date_gmt":"2026-06-01T15:33:17","guid":{"rendered":"https:\/\/analyse.optim.biz\/?p=1968932"},"modified":"2026-06-01T18:33:17","modified_gmt":"2026-06-01T15:33:17","slug":"ong-urile-blocheaza-hidrocentrala-rastolita-desi-proiectul-este-finalizat-in-proportie-de-peste-90","status":"publish","type":"post","link":"https:\/\/analyse.optim.biz\/?p=1968932","title":{"rendered":"ONG-urile blocheaz\u0103 hidrocentrala R\u0103stoli\u021ba, de\u0219i proiectul este finalizat \u00een propor\u021bie de peste 90%"},"content":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/4media.info\/wp-content\/uploads\/2026\/06\/hidrocentrala-Rastolita.webp&#8221;]<\/p>\n<div class=\"articleBody\" data-key=\"articleBody\">\nO investi\u021bie \u00eenceput\u0103 \u00een urm\u0103 cu decenii r\u0103m\u00e2ne blocat\u0103 \u00een instan\u021b\u0103<\/p>\n<p>\u00cen timp ce Rom\u00e2nia discut\u0103 despre securitate energetic\u0103, independen\u021b\u0103 \u0219i reducerea importurilor de electricitate, unul dintre cele mai avansate proiecte hidroenergetice ale \u021b\u0103rii r\u0103m\u00e2ne blocat \u00een tribunale. \u00cenalta Curte de Casa\u021bie \u0219i Justi\u021bie a decis suspendarea definitiv\u0103 a defri\u0219\u0103rilor necesare pentru finalizarea hidrocentralei R\u0103stoli\u021ba, dup\u0103 procesul intentat de organiza\u021biile Declic \u0219i Bankwatch Rom\u00e2nia.<\/p>\n<p>Decizia love\u0219te un proiect aflat \u00eentr-un stadiu de execu\u021bie de peste 90%, pentru care statul rom\u00e2n a investit resurse importante timp de zeci de ani.<\/p>\n<p>Zeci de mii de gospod\u0103rii ar putea fi alimentate<\/p>\n<p>Potrivit datelor tehnice, hidrocentrala R\u0103stoli\u021ba ar urma s\u0103 aib\u0103 o putere instalat\u0103 de 35,2 MW \u0219i o produc\u021bie anual\u0103 estimat\u0103 la aproximativ 117 GWh de energie electric\u0103.<\/p>\n<p>Aceast\u0103 cantitate de energie ar putea asigura consumul a peste 50.000 de locuin\u021be, contribuind la reducerea presiunii asupra sistemului energetic na\u021bional \u0219i la cre\u0219terea produc\u021biei de energie din surse interne.<\/p>\n<p>Cu toate acestea, proiectul nu poate fi pus \u00een func\u021biune f\u0103r\u0103 realizarea complet\u0103 a lacului de acumulare, iar acest lucru presupune defri\u0219area unei suprafe\u021be aflate acum \u00een litigiu.<\/p>\n<p>ONG-urile cer oprirea definitiv\u0103<\/p>\n<p>Reprezentan\u021bii Declic sus\u021bin c\u0103 proiectul afecteaz\u0103 un parc na\u021bional \u0219i alte arii naturale protejate \u0219i afirm\u0103 c\u0103 beneficiul energetic este prea mic pentru a justifica impactul asupra mediului.<\/p>\n<p>Potrivit acestora, hidrocentrala ar contribui cu aproximativ 0,081% la produc\u021bia anual\u0103 de energie a Rom\u00e2niei, motiv pentru care consider\u0103 c\u0103 investi\u021bia nu mai poate fi justificat\u0103.<\/p>\n<p>ONG-urile solicit\u0103 oprirea definitiv\u0103 a proiectului \u0219i anularea procedurilor care ar permite finalizarea lucr\u0103rilor.<\/p>\n<p>Statul \u0219i Hidroelectrica continu\u0103 lupta \u00een instan\u021b\u0103<\/p>\n<p>Autorit\u0103\u021bile nu consider\u0103 \u00eens\u0103 cazul \u00eenchis. Litigiul principal privind acordul de mediu continu\u0103 la Curtea de Apel Cluj-Napoca, iar Ministerul Energiei \u0219i Hidroelectrica \u00eencearc\u0103 s\u0103 ob\u021bin\u0103 o decizie favorabil\u0103 care s\u0103 permit\u0103 continuarea proiectului.<\/p>\n<p>Parlamentarul Ciprian Dobre a declarat c\u0103 suspendarea acordului de mediu afecteaz\u0103 momentan doar procedura de defri\u0219are \u0219i c\u0103 procesul pe fond este \u00eenc\u0103 \u00een desf\u0103\u0219urare.<\/p>\n<p>Simbolul unei probleme mai mari<\/p>\n<p>Cazul R\u0103stoli\u021ba dep\u0103\u0219e\u0219te deja dimensiunea unei simple dispute juridice. Pentru sus\u021bin\u0103torii proiectului, situa\u021bia a devenit un simbol al modului \u00een care investi\u021bii strategice de sute de milioane de euro pot fi blocate \u00een ultimul moment, chiar \u0219i dup\u0103 ce au fost realizate \u00een propor\u021bie cov\u00e2r\u0219itoare.<\/p>\n<p>\u00centr-o perioad\u0103 \u00een care Rom\u00e2nia vorbe\u0219te despre independen\u021b\u0103 energetic\u0103 \u0219i investi\u021bii \u00een infrastructur\u0103 critic\u0103, \u00eentrebarea devine inevitabil\u0103: este normal ca o hidrocentral\u0103 finalizat\u0103 \u00een propor\u021bie de peste 90% s\u0103 r\u0103m\u00e2n\u0103 nefunc\u021bional\u0103 dup\u0103 zeci de ani de lucr\u0103ri \u0219i cheltuieli publice?\n<\/p><\/div>\n<p>[analyse_source url=&#8221;https:\/\/4media.info\/ong-urile-blocheaza-hidrocentrala-rastolita-desi-proiectul-este-finalizat-in-proportie-de-peste-90\/&#8221;]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[analyse_image type=&#8221;featured&#8221; src=&#8221;https:\/\/4media.info\/wp-content\/uploads\/2026\/06\/hidrocentrala-Rastolita.webp&#8221;] O investi\u021bie \u00eenceput\u0103 \u00een urm\u0103 cu decenii r\u0103m\u00e2ne blocat\u0103 \u00een instan\u021b\u0103 \u00cen timp ce Rom\u00e2nia discut\u0103 despre securitate energetic\u0103, independen\u021b\u0103 \u0219i reducerea importurilor de electricitate, unul dintre cele mai avansate proiecte hidroenergetice ale \u021b\u0103rii r\u0103m\u00e2ne blocat \u00een tribunale. \u00cenalta Curte de Casa\u021bie \u0219i Justi\u021bie a decis suspendarea definitiv\u0103 a defri\u0219\u0103rilor necesare pentru [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[89],"tags":[99,226],"class_list":["post-1968932","post","type-post","status-publish","format-standard","hentry","category-romania","tag-4media-info","tag-crawlmanager"],"_links":{"self":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1968932","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1968932"}],"version-history":[{"count":0,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=\/wp\/v2\/posts\/1968932\/revisions"}],"wp:attachment":[{"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1968932"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1968932"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/analyse.optim.biz\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1968932"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}